GE Offshore Wind

GE Offshore Wind
IndustryWind turbines
PredecessorAlstom Wind (2010–2015)
Alstom Ecotècnia (2007–2010)
Ecotècnia S.c.c.l. (1981–2007)
Founded1981
Headquarters,
France
Key people
Jan Kjærsgaard (CEO)
ProductsAlstom Haliade 150, GE Haliade-X
OwnerGE Vernova

GE Offshore Wind is a joint venture with Alstom and a subsidiary of GE Vernova, created in 2015 when most of Alstom's electrical power and generation assets were acquired by General Electric. GE's stake in the joint venture is 50% plus 1 share.

Formerly known as Alstom Wind, originally Alstom Ecotècnia, the company was the wind power company of energy infrastructure company Alstom, within its 'Power' operating division, from 2010 to 2015. The company originated as Ecotècnia S.c.c.l., a Spanish wind power equipment manufacturing and installation company established in 1981, acquired by Alstom 2007 for €350 million.

The subsidiary's main product is the 14MW Haliade-X offshore wind turbine, amongst the most powerful on Earth.[1]

History

Ecotècnia, 1987-2007

Detail of a wind turbine Alstom-Ecotècnica Eco80 in the Spanish Basque Country

Ecotècnia was a manufacturer and installer of wind turbines established in 1981, headquartered in Barcelona, Spain. In 1999 it became part of the Basque-based cooperative Mondragon Corporation.[2]

The company's first wind generator was a 30 kW machine, developed by 1984 with funding assistance from the Spanish Science Ministry. In 1991 the company developed a 150 kW machine, and in 1992 won its first commercial project - for fifty 150 kW turbines at Tarifa, Spain.[3] The particular demands of installing wind turbines in mountainous regions in Spain which included poor road access and blustery (high turbulence) conditions led to specific design features of Ecotècnia's turbines - including a modular construction of the turbine (three components: rotor and shaft; mainframe and yaw system; and the drive train - each less than 30t), as well as isolation of the gearbox from the main drive, reducing non-torque gearbox loads.[3][4]

In the first half of the 1990s the company installed wind farms using its ECO20 150 kW model, from 1995 to 2000 the company's primary models were the ECO44 (640 kW) and ECO48 (750 kW) models.[5] After 2003 most of the company's installations used its 1.67MW IEC 61400 class II ECO74,[6] and class IIIA ECO80,[7] three blade turbine models;[5] both typically used a mechanically isolated Winergy AG PEAB 4390.2 planetary gearbox driving a doubly fed induction generator (typically ABB, Siemens, Winergy sourced) with IGBT inverter control, driven by individually pitch controlled blades manufactured by LM Wind Power.[4][6][7]

The majority of its installations were in Spain, with approximately 10% in other countries including Portugal, France, Italy as well as installations in Japan and India.[5]

In 2005 the company's estimate world market share (by installed capacity) was 2.1%.[4] By 2007 the company had installed over wind farms with over 1GW total of rate power;[5] the company had increased the power output of its wind turbine offering from 30 kW in 1984 to 1.67MW by 2003.[8]

In mid 2007 Alstom acquired Ecotècnia for 350 million euro.[9] By late 2007 the company employed over 800 people, with sales of approximately €400 million pa., and operated wind turbine assembly plants in Somozas and Buñuel, other sites at Rio del Pozo (control panels) and Coreses (tower manufacturing).[10] The company also manufactured small scale autonomous energy systems for isolated locations (tradename 'CICLOPS') comprising windgenerator (10 kW), photovoltaic solar source (2 to 10 kW), generator, battery and inverter, and was active in small scale photovoltaic cell installation (factory Pla de Santa Maria.[10]).[11]

Alstom Wind, 2007-2015

The first ECO100 3 MW wind turbine was formally inaugurated at the Vieux Moulin wind farm (Pithiviers, Paris, France) 1 October 2009.[12]

The company was renamed Alstom Wind S.L. in April 2010.[13]

In 2010 Alstom began construction of a turbine nacelle factory in Amarillo, USA,[14] completed in mid 2011.[15] In November 2011 a 300MW per year capacity manufacturing plant in Camaçari near Salvador, Bahia, Brazil was formally opened.[16]

In March 2012 a prototype of Alstom Haliade 150 6 MW offshore turbine was formally inaugurated; the turbine was developed for large scale offshore wind projects off the French coast;[17] in January 2011 Alstom joined a consortium led by EDF Energies Nouvelles as turbine supplier (also including DONG Energy, Nass & Wind, WPD Offshore) to bid for proposed offshore wind farms in France of 6GW capacity.[18] The Haliade 150 turbine was a development of the previous mechanically isolated transmission designs developed by Ecotècnia;[note 1] the gearbox driven electrically generator was omitted and replaced with a gearless direct drive permanent magnet synchronous generator designed for higher efficiency and greater reliability with fewer moving parts. The turbine uses 73.5m turbine blades from LM Wind Power.[20]

In April 2012 the French state awarded an EDF/DONG Energy/Alstom consortium three contracts for offshore wind farms (Saint-Nazaire, Courseulles-sur-Mer, Fécamp.[21]) off the northwestern coast of France of total power 1.4 GW. As a result, Alstom confirmed that it would be constructing wind turbine factories at Cherbourg-en-Cotentin (Turbine blades in association with LM Power, wind turbine towers), and at Saint-Nazaire (Nacelles and generators) in the Montoir-de-Bretagne port area.[22]

A 6 MW Haliade turbine began generating electricity in July 2012 during certification testing. The turbine's electrical generator was supplied by partner company, General Electric subsidiary GE Power Conversion (Converteam), who were also expected to establish a production plant in Saint Nazaire.[23]

In late 2012 Alstom announced the intention to construct a wind turbine tower manufacturing facility in Canoas, Rio Grande do Sul, Brazil, on a site adjacent to an established Alstom power transmission factory.[24] The plant was officially inaugurated in August 2013.[25]

In February 2013 the company announced the cut of 35% of its workforce in Spain, due to a collapse in the Spanish wind market because of a change to governmental support for wind developments.[26][note 2] The facilities at Somozas, Galicia (electrical equipment), and Zamora, Castille and Leon region (towers) were to close with electrical equipment production moved to the plant at Buñuel, Navarra.[26][29] Total job losses were later reduced from 373 to 265.[30]

A Haliade 150 turbine was installed at the Belwind wind farm in November 2013 for operational tests, at the time being one of the largest operational wind turbines in the world.[31][32][note 3]

In December 2014 the St. Nazaire nacelle and generator assembly factory was officially opened.[33][34]

In early 2015 a wind turbine tower factory was opened in Jacobina, Bahia, Brazil; constructed as a joint venture (51%/49%) between Andrade Gutierrez and Alstom.[35]

Initial orders for the company's Haliade wind turbine included 5 units for the Block Island Wind Farm (USA, March 2015);[36] and 66 units for DEME for the Merkur offshore wind farm (Germany, July 2015).[37]

In November 2015 most of Alstom's energy generation and transmission assets were bought by General Electric. The combined business under GE was named GE Power.[38] The two parties also created three joint ventures, among them a hydro and offshore renewable business unit.

GE Power (offshore wind) (2016–)

In February 2016 the first of a series production of 300 permanent magnet wind generators was completed at the St. Nazaire factory.[39][40] A long planned test period for the 6MW Haliade is expected to start in Spring 2016 at Østerild Wind Turbine Test Field.[41][42]

Notes

  1. ^ The Haliade 150 design has separate main rotor and generator bearings, with torque transmitted from rotor to generator via a flexible coupling.[19]
  2. ^ Spanish governmental austerity measures led to subsidies for wind power ending c.2012. Quote: In January 2012 the newly appointed Spanish government announced a temporary suspension in the premium remuneration for renewable energy capacity. ... It's expected that this decision will simply stop the building of new wind in 2013.[27] Support via Feed-in tariffs were to be replaced by subsidies encouraging capital investment, with only intrinsically profitable ventures supported.[28]
  3. ^ An initial Haliade 150 turbine was installed onshore at Le Carnet, France for testing and certification in March 2012.[31]

References

  1. ^ "World's Most Powerful Offshore Wind Platform: Haliade-X | GE Renewable Energy". www.ge.com. Retrieved 3 March 2021.
  2. ^ Ecotècnia S.c.c.l, "Perfil Corporativo", 2003, company website
  3. ^ a b Elizabeth Nash (15 May 2002), "Spanish turbines catch winds of change", evolution.skf.com
  4. ^ a b c M. Ragheb (28 February 2010), "Modern Wind Generators" (PDF), netfiles.uiuc.edu, "Ecotècnia wind turbines", also Table 1. "Wind turbine manufacturers share of installed capacity as of 2005", archived from the original (PDF) on 18 December 2012
  5. ^ a b c d "List of principal installations carried out by Ecotècnia" (PDF), www.ecotecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  6. ^ a b "Technical characteristics: 74/1.6" (PDF), www.econtecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  7. ^ a b "Technical Characteristics: 80/1.6" (PDF), www.econtecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  8. ^ Alstom and Ecotècnia, June 2008, "Evolución tecnológica", p.23
  9. ^ Sources:
  10. ^ a b Alstom and Ecotècnia, June 2008, "Current Footprint", pp.26-7
  11. ^ Ecotècnia S.c.c.l, "Activities", June 2007, company website
  12. ^ "OnSite: The Ecotècnia 100 Launch", www.internationalresourcejournal.com, November–December 2009, archived from the original on 13 March 2016, retrieved 26 March 2012
  13. ^ "Company Overview of ALSTOM Wind, S.L.", investing.businessweek.com, Bloomberg LP, archived from the original on 27 April 2010
  14. ^ "Alstom se développe dans l'éolien aux Etats-Unis", www.boursier.com (in French), 31 May 2010
  15. ^ Yann Ranaivo (26 July 2010), "Wind-power firms to employ 70 to 80 workers this year", amarillo.com
  16. ^ Sources:
  17. ^ Sources:
  18. ^ Sources:
  19. ^ de Vries, Eize (11 July 2012), "Close up - Alstom Haliade 6MW prototype", www.windpowermonthly.com
  20. ^ Haliade 150–6MW Offshore Wind Turbine (PDF), Alstom[permanent dead link]
  21. ^ "Désignation des lauréats du premier appel d'offres "éolien en mer"", www.developpement-durable.gouv.fr (in French), 6 April 2012
  22. ^ Sources:
  23. ^ Sources:
  24. ^ Alstom intends to set up a wind tower factory in Canoas, Rio Grande do Sul, Brazil, Alstom, 1 October 2012, archived from the original on 16 November 2012, retrieved 2 October 2012
  25. ^ Alstom inaugurates its first wind tower factory in Latin America, Alstom, 9 August 2013, archived from the original on 14 December 2013, retrieved 11 December 2013
  26. ^ a b "Alstom Wind cuts 35% of jobs in Spain", www.windpowermonthly.com, 27 February 2013
  27. ^ Annual report 2011 (PDF), EDP Renováveis, 2001, Wind Energy Regulation (by Country) - Spain, p.35, archived from the original (PDF) on 12 February 2013, retrieved 11 December 2013
  28. ^ McGovern, Michael (19 July 2013), "Analysis - Reform pushes Spanish renewables to the edge", www.windpowermonthly.com
  29. ^ Alstom presents an adjustment plan for its wind power business in Spain, Alstom, 26 February 2013
  30. ^ Alstom Wind reaches an agreement with workers to implement the adjustment plan, Alstom, 5 July 2013
  31. ^ a b "First offshore installation of Alstom's Haliade 150", www.modernpowersystems.com, 22 November 2013
  32. ^ De MonicaultMis, Frédéric (21 November 2013), "Alstom installe sa première éolienne en mer", www.lefigaro.fr (in French)
  33. ^ "Alstom cuts ribbon in Saint-Nazaire", renews.biz, 2 December 2014, archived from the original on 8 December 2014, retrieved 2 December 2014
  34. ^ "Alstom inaugurating France's first offshore wind turbine production plants in Saint-Nazaire", www.alstom.com (Press release), 2 December 2014
  35. ^ "Alstom opens third Brazilian factory", renews.biz, 30 January 2015, archived from the original on 11 February 2015, retrieved 11 February 2015
  36. ^ Alstom announces a major milestone for Deepwater's Block Island Offshore Wind Project (press release), Alstom, 9 March 2015, archived from the original on 18 May 2015, retrieved 10 May 2015
  37. ^ Alstom, DEME and Merkur Offshore sign a contract for the delivery and installation of 66 Haliade offshore wind turbines in Germany (press release), Alstom, July 2015, archived from the original on 27 July 2015, retrieved 11 August 2015
  38. ^ "Alstom closes sale of energy business to GE (UPDATE 1)", www.reuters.com, 2 November 2015
  39. ^ "GE completes Haliade heart", renews.biz, 10 February 2016
  40. ^ GE's 6-Megawatt Wind Generator Leaves Factory, Destined to Accelerate Offshore Wind Growth (press release), GE, 10 February 2016, archived from the original on 7 October 2016, retrieved 10 February 2016
  41. ^ "Haliade 150-6MW - Østerild (onshore) - 4C Offshore".
  42. ^ "Key project dates for Haliade 150-6MW - Østerild (onshore) - 4C Offshore". Archived from the original on 8 April 2016. Retrieved 28 March 2016.

Sources

Read other articles:

Private college in South Cotabato, Philippines This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Notre Dame of Dadiangas University – news · newspapers · books · scholar · JSTOR (October 2017) (Learn how and when to remove this template message) Notre Dame of Dadiangas UniversityPamantasang Notre Dame ng Dadia...

 

 

InduktorBeberapa jenis induktor harga rendah.SimbolTipePasifPembuatan pertamaMichael Faraday(1831)lbs Sebuah induktor atau pengimbas[1], disebut juga reaktor adalah sebuah komponen elektronika pasif (kebanyakan berbentuk torus) yang dapat menyimpan energi pada medan magnet yang ditimbulkan oleh arus listrik yang melintasinya. Kemampuan induktor untuk menyimpan energi magnet ditentukan oleh induktansinya, dalam satuan Henry. Biasanya sebuah induktor adalah sebuah kawat penghantar yang ...

 

 

Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Astra Motor – berita · surat kabar · buku · cendekiawan · JSTOR Astra MotorIndustriOtomotif dan komponennyaKantorpusatKomplek Astra International Gedung AMDI B, lt. 1 - 2, Jalan Gaya Motor Raya No. 8 Sun...

Logo DefTech. DRB-HICOM Defence Technologies Sdn Bhd, secara resmi dikenal sebagai DefTech, adalah kontraktor pertahanan Malaysia yang terlibat dalam pengembangan, pembuatan dan penyediaan lapis baja dan logistik kendaraan untuk militer dan keamanan tanah air. DefTech juga merupakan pemasok kendaraan khusus dan bus komersial.[1][2][3][4][5] Deftech mengambil tonggak sejarah besar dalam industri kedirgantaraan dan kendaraan udara tak berawak setelah akui...

 

 

ITC Cempaka Mas Mega Grosir adalah pusat grosir terbesar di Asia Tenggara[butuh rujukan] dengan ± 6.000 kios dalam 5 lantai. ITC Cempaka Mas terletak di daerah yang stratergis. Penyewa terbesar yang pernah ada di mal ini adalah Carrefour, Selain itu, ITC Cempaka Mas juga dikenal sebagai pusat penjualan handphone terbesar setelah ITC Roxy Mas.[butuh rujukan] Penyewa Tampak dalam dari ITC Cempaka Mas Lantai bawah: Hapimart (ex Continent/Carrefour/Transmart, buka 2024), multipro...

 

 

Problem or enigma that tests For the common jigsaw puzzle, see Jigsaw puzzle. For other uses, see Puzzle (disambiguation). Puzzle game redirects here. For the video game genre, see Puzzle video game. Part of a series onPuzzles Types Guessing Riddle Situation Logic Dissection Induction Logic grid Self-reference Mechanical Combination Construction Disentanglement Lock Go problems Folding Stick Tiling Tour Sliding Chess Maze (Logic maze) Word and Number Crossword Sudoku Puzzle video games M...

Teh susu mutiara Teh susu mutiara atau lebih sering disebut boba (Hanzi: 珍珠奶茶; Pinyin: zhēn zhū nǎi chá, 波霸奶茶; bō bà nǎi chá; 泡泡茶; pào pào chá, Inggris: bubble tea) adalah sejenis minuman teh susu dari teh hitam, susu, sirup gula ditambah dengan mutiara atau boba yang terbuat dari tapioka. Minuman ini berasal dari Taiwan dan terkenal di Asia Timur, Asia Tenggara, Australia, Eropa, dan Amerika Utara.[1][2] Sejarah Teh susu mutiara muncul...

 

 

Croatian tennis player Mili PoljičakPoljičak at the 2023 Wimbledon ChampionshipsCountry (sports) CroatiaBorn (2004-07-13) 13 July 2004 (age 19)Split, CroatiaHeight1.85 m (6 ft 1 in)PlaysRight-handed (two-handed backhand)CoachJosip DumanicPrize money$70,615SinglesCareer record0–1 (at ATP Tour level, Grand Slam level, and in Davis Cup)Career titles1 ITFHighest rankingNo. 462 (3 April 2023)Current rankingNo. 841 (18 March 2024)Grand Slam sing...

 

 

Art school in Astoria, New York This February 2024 needs additional citations for verification. Please help improve this article by adding citations to reliable sources in this February 2024. Unsourced material may be challenged and removed.Find sources: Frank Sinatra School of the Arts – news · newspapers · books · scholar · JSTOR (February 2024) (Learn how and when to remove this template message) Frank Sinatra School of the ArtsAddress35-12 35th...

Синелобый амазон Научная классификация Домен:ЭукариотыЦарство:ЖивотныеПодцарство:ЭуметазоиБез ранга:Двусторонне-симметричныеБез ранга:ВторичноротыеТип:ХордовыеПодтип:ПозвоночныеИнфратип:ЧелюстноротыеНадкласс:ЧетвероногиеКлада:АмниотыКлада:ЗавропсидыКласс:Пт�...

 

 

The Hunger Games: Catching FirePoster bioskopSutradaraFrancis LawrenceProduserNina JacobsonJon Kilik[1]SkenarioSimon BeaufoyMichael ArndtSuzanne CollinsBerdasarkanTersulutoleh Suzanne CollinsPemeranJennifer LawrenceJosh HutchersonLiam HemsworthWoody HarrelsonElizabeth BanksLenny KravitzPhilip Seymour HoffmanJeffrey WrightStanley TucciDonald SutherlandPenata musikJames Newton HowardSinematograferJo Willems[1]PenyuntingAlan Edward Bell[1]PerusahaanproduksiColor For...

 

 

Music venue and former movie theater in Atlanta, Georgia, United States 33°45′50″N 84°21′04″W / 33.76375°N 84.35111°W / 33.76375; -84.35111 Variety PlayhouseFormer namesEuclid Theatre (1940-62)Ellis Cinema (1984-88)Address1099 Euclid Ave NEAtlanta, GA 30307-1923LocationLittle Five PointsOwnerAgon Sports and EntertainmentCapacity1,000OpenedOctober 2, 1940 (1940-10-02)WebsiteVenue Website The Variety Playhouse (originally known as the Euclid Th...

Campagna d'Egittoparte delle guerre rivoluzionarie francesiIl generale Bonaparte alla battaglia delle PiramidiData1798-1801 LuogoEgitto e Siria EsitoVittoria turca e britannica Modifiche territorialiconquista temporanea dell'Egitto (1799-1801) da parte francese Schieramenti Regno di Gran Bretagna Impero ottomano Prima Repubblica francese Comandanti Murad Bey Ibrahim Bey Horatio Nelson Ralph Abercromby William Sidney Smith Antoine Le Picard de Phélippeaux Jazzar Pascià Sa'id Mustafà Pa...

 

 

Флаг гордости бисексуалов Бисексуальность      Сексуальные ориентации Бисексуальность Пансексуальность Полисексуальность Моносексуальность Сексуальные идентичности Би-любопытство Гетерогибкость и гомогибкость Сексуальная текучесть Исследования Шк...

 

 

Untuk desa di Nottinghamshire, lihat Holbeck, Nottinghamshire. Koordinat: 53°47′20″N 1°33′18″W / 53.789°N 1.555°W / 53.789; -1.555 Holbeck Tegalan Holbeck dengan Bridgewater Place di latar Holbeck Letak Holbeck di West Yorkshire Ref. grid OS SE311314 Distrik metropolitan Kota Leeds County metropolitan West Yorkshire Region Yorkshire and the Humber Negara konstituen Inggris Negara berdaulat Britania Raya Kota pos LEEDS Distrik&#...

 烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...

 

 

此条目序言章节没有充分总结全文内容要点。 (2019年3月21日)请考虑扩充序言,清晰概述条目所有重點。请在条目的讨论页讨论此问题。 哈萨克斯坦總統哈薩克總統旗現任Қасым-Жомарт Кемелұлы Тоқаев卡瑟姆若马尔特·托卡耶夫自2019年3月20日在任任期7年首任努尔苏丹·纳扎尔巴耶夫设立1990年4月24日(哈薩克蘇維埃社會主義共和國總統) 哈萨克斯坦 哈萨克斯坦政府...

 

 

هذه المقالة بحاجة لصندوق معلومات. فضلًا ساعد في تحسين هذه المقالة بإضافة صندوق معلومات مخصص إليها. يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (فبراير 2016) الطري�...

US Courthouse-District of Columbia redirects here. For the historic building also known as the District of Columbia Courthouse, see District of Columbia City Hall. United States historic placeU.S. District Courthouse - District of ColumbiaU.S. National Register of Historic Places E. Barrett Prettyman United States Courthouse in Washington, D.C.Location333 Constitution Avenue N.W., Washington, D.C., U.S.Coordinates38°53′35″N 77°00′59″W / 38.89306°N 77.01639°W...

 

 

List of definitions of terms and concepts commonly used in the study of physics This glossary of physics is a list of definitions of terms and concepts relevant to physics, its sub-disciplines, and related fields, including mechanics, materials science, nuclear physics, particle physics, and thermodynamics. For more inclusive glossaries concerning related fields of science and technology, see Glossary of chemistry terms, Glossary of astronomy, Glossary of areas of mathematics, and Glossary of...