Line 1 is a north–south line of the Shanghai Metro. It runs from Fujin Road in the north, via Shanghai Railway Station to Xinzhuang in the south. The first line to open in the Shanghai Metro system, line 1 serves many important points in Shanghai, including People's Square and Xujiahui. Due to the large number of important locations served, this line is extremely busy, with a daily ridership of over 1,000,000 passengers.[4] Generally, the line runs at grade beside the Shanghai–Hangzhou railway in the south, underground in the city center and elevated on the second deck of the North–South Elevated Road in the North. The line is colored red on system maps.
History
The required investment for the project was US$620 million (including domestic supporting RMB investment). In August 1988 and May 1989, the program of loans to the Federal Republic of Germany, France and the United States was approved by the State Planning Commission.[5]
The Federal Government of Germany has a loan of 460 million marks, an annual interest rate of 0.75%, a committed rate of 0.25%, a repayment period of 30 years, and a grace period of 10 years.[5]
French mixed loan of 132 million francs, of which 54% of government soft loans, annual interest rate of 2%, loan repayment period of 19 years, grace period of 11 years; export credit 46%, annual interest rate of 8.3%, loan repayment period of 10 years, grace period of 22 month.[5]
The US loaned US$23.18 million, of which 45% were government grants and 55% were commercial loans. The annual interest rate fluctuates, the loan repayment period is 10 years, and the grace period is 5 years.[5]
With the start of construction of the project, the cost has also increased. In August 1993, the budgetary estimate was adjusted to 3.974 billion yuan, of which domestic supporting funds increased by 1.086 billion yuan. In January 1995, the total budget was adjusted for the second time to 5.39 billion yuan, of which 3.961 billion yuan was domestic supporting funds.[5]
May 28, 1993 - The first 4.4 km (2.7 mi) long section of the line, from Xujiahui to Shanghai South Railway Station (formerly known as Xinlonghua), opens.
December 28, 1996 - Separate southern section from Jinjiang Park (formerly known as Hongmei Road South) to Xinzhuang opens. Northern extension continues to operate to Shanghai Railway Station.
July 1, 1997 - The northern and southern sections are connected, forming one complete line from Shanghai Railway Station - Xinzhuang.
December 28, 2004 - Line runs from Gongfu Xincun - Xinzhuang after northern extension opens.
December 29, 2007 - Second northern extension opens; full line runs from Fujin Road - Xinzhuang.
^Xinzhuang station on the Jinshan line is currently under reconstruction. Expected reopening: 2024.
^Former station opened on 28 December 1996;[11] Renovated station opened on 25 June 2021.[12]
^Former station opened on 28 May 1993;[14][13] current station opened on 30 October 2004.[11]
^Virtual transfer with lines 3 and 4 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
Important stations
Shanghai Railway Station - Connects the metro with the main railway station in the city, allowing rail transport to and from other provinces. Virtual Interchange with lines 3 and 4.
People's Square - This station serves a business and shopping area, and is also close to multiple tourist attractions making the station busy all day long. Interchange with lines 2 and 8.
Xujiahui - This is a business and commercial area, also with tourist attractions such as the Xujiahui Cathedral. Interchange with lines 9 and 11.
Shanghai Indoor Stadium - This station is located at the sports stadium of the same name and the biggest regional and long-distance bus station in the city. Interchange with line 4.
Shanghai South Railway Station - This station serves the second railway station of the city, which accommodates trains serving cities mainly to the south. Interchange with lines 3 and 15.
Xinzhuang - The southern terminus of line 1; interchange with line 5.
Future expansion
West extension of line 1
A 1.2 km (0.75 mi) extension to Humin road (North Xinzhuang Station) has been approved as part of the National Development and Reform Commission has approved the 2018-2023 construction planning of the city's Metro network. Work is expected to begin before 2023 and will take 4 years at acost of US$518. The extension will connect to the under construction Jiamin line.[15]
As the first line in the system, Shanghai Metro was conceived and designed during 1980s, when fixed block signalling and track circuit based train control (TBTC) was still considered a state-of-art approach to automatic train operation. The signalling system was designed by CASCO, a signalling manufacturer owned jointly by China Railway Signal & Communication Group Corporation (CRSC) and General Railway Signal (GRS), and was largely based on the system designed by GRS for the Washington Metro.[17] Coded audio-frequency (AF) track circuits are used for both train detection and transmission of speed commands, as well as limited train-to-wayside communication (TWC) for automatic train supervision (ATS). Train operation between stations and station stop can be automatic, while doors are controlled manually by train operators.[18][19]
From 2013 to 2019, the system was completely renewed, with obsolete components such as relay interlockings replaced by modern microprocessor-based ones, but the general operation of the signaling system remained unchanged.[20] As of 2020, the original design is expected to serve two additional decades.[21]
Rolling Stock
In the summer of 2006 after poor cooling affected 16 DC01 trains on Line 1 in the summer, high temperatures inside the carriages had long been a problem, 96 ice cubes have been put into a one-meter-high waste container to alleviate the high temperature of the 16 DC trains on Line 1. In order to make up for the defects in the refrigeration power and design of the 16 DC trains, emergency measures must be taken whenever the temperature reaches 33 °C (91 °F) or more.[22] With the transformation between 2006 and 2008 from 6 carriages to 8 carriages the air conditioners of the trains were improved and modernized, making ice waste containers a thing of the past.[23]
The line was initially operated by trains built by the German Shanghai Metro Group which included Adtranz (now Bombardier) and Siemens together with AEG Westinghouse and Düwag.[24]
111-113, 115 and 116 (93371, 93421, 93431, 93481, 94011, 94061, 94131, 94181, 94191, 94241 and 014352-014643)
In 2008-2009 expanded DC01C trains by CRRC Zhuzhou Locomotive Trains are a combination of the Tc carriages of the original DC01 trains and the middle six carriages are newly produced by CRRC Zhuzhou Locomotive (30 newly produced carriages similar to 11A01).
The trains are undergoing a major refurbishment in 2024 to keep them operational until 2037. Work is expected to be completed by November 2025. Trains will be removed and transported to CRRC Zhuzhou Locomotive for renovation and rebuilt.
117-125 (98011-98061, 99011-99481, 99502-99533, 00022-00053, 01742-01773, 01802-01833, 14672 and 14683)
99251 wrecked at Tonghe Xincun station on March 24, 2004. It was repaired and returned to service. 98033 and 98042 wrecked at Shanghai Railway Station station on December 22, 2009. In 2011, these were replaced by two new carriages of CRRC Zhuzhou Locomotive.
98033 was stored at Meilong Depot.
98042 was converted to the SMTC Experimental Car by CRRC Dalian R&D.
Trainset 118-125 are an extension of the original AC01A trains by adding two newly produced by CRRC Zhuzhou Locomotive Tc carriages to six old middle AC01 carriages (using the 48 middle carriages from AC01).
In 2008-2009 expanded AC01B trains by CRRC Zhuzhou Locomotive. Trains are a combination of the Tc carriages of the original AC01 and six CRRC Zhuzhou Locomotive carriages (42 newly produced carriages similar to 04A01). The Tc carriages of trainset 130-137 were returned from line 2 (AC02, trainset 217-224).
^"Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
^JinDong, Lu; YiXin, Chen. "The Shanghai No. 1 Subway Line"(PDF). Japan Railways & Transportation Review. January 1997 (Urban Railways in China and India): 31–37.
^陈其昌 (1996), 上海地铁一号线采用的列车自动控制系统 [ATC in Line No.1 of Shanghai Subway], 铁道通信信号, retrieved 2020-05-17