Line 14 of the Shanghai Metro is an east-west metro line opened on 30 December 2021.[1] The line, consisting of 31 stations, starts from Fengbang town in Jiading District, and terminate in Jinqiao town in Pudong New Area via Zhenru, Jing'an Temple, Dashijie, and Lujiazui. Its total length is 39.1 kilometres (24.3 mi),[2] and passengers are able to transfer to 13 existing and planned metro lines.[3] Due to Line 14 cutting across some of the densest areas of Shanghai and being a relief line for line 2, high ridership is expected for the line. As such the line uses high capacity 8 car A size trains similar to lines 1 and 2.[4] The line uses an automatic train control system jointly developed by Thales and Shanghai Electric.[5] Line 14 is fully driverless.[6] The line is colored olive on system maps.
History
Environmental evaluations began on January 2, 2014.[2] On November 29, 2014, construction began on a section in Pudong New Area.[7]
The line was originally scheduled to open in 2020,[8] but its opening was delayed to 30 December 2021. Longju Road station has not been opened yet, due to problems with land acquisition process.
^Virtual transfer with lines 3, 4, and 11 – passengers who hold the Shanghai Public Transportation Card and transfer within 30 minutes of exiting the station are able to transfer to other lines without exiting the system.
^The station name of line 2 was Dongchang Road (东昌路). Although it's de facto defined as out-of-system transfer station, virtual transfer via cards isn't available until open of the station of line 19, but after that day, the in-system transfer will be implemented instead.