The satellite is built to provide high speed data transmission services to Africa, Latin America and Europe.[5] It is based on Orbital ATK's Star-3 Bus, delivering 64 28 GHz fixed beams covering Africa and parts of Europe. There are also four independent steerable beams that can serve Africa, South America and Europe.[6] The capacity will partially be used to allow Avanti to expand into new markets and provide growth for existing markets.[1]
Launch
The satellite was launched into geosynchronous orbit by Arianespace on an Ariane 5 rocket in its ECA variant from ELA-3 at Guiana Space Centre in French Guiana. The launch was originally planned in early 2017 but has been delayed to 21 March 2018, and then to 5 April 2018.[1][2] The satellite reached its geostationary orbital position by 19 April 2018.[7]
Launches are separated by dots ( • ), payloads by commas ( , ), multiple names for the same satellite by slashes ( / ). Crewed flights are underlined. Launch failures are marked with the † sign. Payloads deployed from other spacecraft are (enclosed in parentheses).