Share to: share facebook share twitter share wa share telegram print page

European route E79

E79 shield
E79
Route information
Length1,300 km (810 mi)
Major junctions
North endMiskolc, Hungary
South endThessaloniki, Greece
Location
Countries Hungary
 Romania
 Bulgaria
 Greece
Highway system
Construction of two-way tunnel on Route E79 in Greece (Completed)
E79 in Bulgaria (motorway stretch)
E79 in Bulgaria (non-motorway stretch)

European route E 79 is a road part of the International E-road network. It begins in Miskolc, Hungary and ends in Thessaloniki, Greece, also running through Romania and Bulgaria. The road is 1,300 km (810 mi) long.

Itinerary

The E 79 routes through four European countries:

 Hungary

 Romania

 Bulgaria

 Greece

Route description

Hungary

The Hungarian section of E79 shares parts of its path with other E-roads, such as E60, E573 and E71.[1]

Romania

The Romanian section of the road is mostly new asphalt, as can be seen on the map with Romanian road quality.[2] Although only in the region of 500 km (310 mi) the road itself has many curves as it goes directly through 2 major mountain groups of the Carpathian range: the Apuseni Mountains and the Meridionali Mountains. With a 50 km/h (31 mph) restriction when passing through the many minor villages, and a large part of its length in the Carpathian mountains (about 40-50% of its length in Romania), the average speed is generally in the 50–60 km/h range. Especially in the mountainous parts, the road can be considered as more suitable for tourism than for high speed traveling, but as it has been in a very poor state up until a couple of years ago, touristic infrastructure is still poorly developed (road side hotels, restaurants). Plan ahead if you consider staying overnight in hotels on this route (best options are outside of the cities, with few exceptions - Oradea, Deva - but there are not so many decent locations for accommodation).

Since 2012, work has begun to improve the quality of this road:

  • A. Oradea – Deva (Șoimuș) [under construction on approx. 2-3 % of its length]: Most of the road in this section has been modernized (as of August 2021, about 95% is in good condition). Drive carefully, especially during the night or in bad weather conditions, as many safety elements may be missing (there are many parts with good asphalt, but no traffic signs and road marks). Parts of the road are still under construction, while other parts have been finished and are good (some excellent). In August 2021, 3 traffic lights were still in place on this section.

Contracts were signed in late 2012 to improve this section. Status of work progress is December 2017, by section, North to South:

- Oradea-Beiuș (cca. 60 km): This section has been recently re-done completely. There may still be areas with poor or no road markings, so travel carefully especially during the night.

- Beiuș-Ștei (cca. 28 km): This section has been recently re-done completely. There may still be areas with poor or no road markings, so travel carefully especially during the night. Constructor: AZVI/AZCALE (cca. 100 mil. RON without VAT, contract 5R13, progress in December 2016: >90%).[3]

- Ștei-Vârfurile (cca. 33 km): Currently under construction on about 20-30% of its length. There still are 3 traffic lights in this sector. Work is progressing normally and the sector should be finished by the end of 2021. First contractor: SC Antreprenor Construct Mod SRL (progress status: 70% in December 2016). Contract was terminated and rest of the work was re-auctioned. Second constructor: Asocierea DRUM ASFALT S.R.L. & VAHOSTAV - SK a.s. & TRAMECO S.A. & ILE VIOREL CONSTRUCT S.R.L. (contract signed in May 2020).

- Vârfurile-Ionești (cca. 14 km): This mountainous section is still under construction (2–3 km still in heavy construction), with some parts in good condition (asphalt), but with no road markings, so travel carefully during the night. On many climbs, now there are 2 lines going up hill and one line down, so passing heavy traffic is possible. Original contractor was VIALES Y OBRAS PUBLICAS (cca. 43 mil RON without VAT, contract 5R11, progress in 2015: 29.76%). Contract cancelled in September 2015. Re-auctioned recently. Auction won by SC SYLC CON TRANS SRL / HIDROSTROY AD --- 55.945.649,16 RON without VAT. source

Starting with Ionești, the road is good until as far south as Calafat (400 km), with only very small portions still under construction.

- Ionești-Brad (cca. 20 km): PORR (cca. 65 mil. RON without VAT, contract 5R10b, 100% finished in December 2017).

- Șoimuș-Brad (cca. 30 km): SELINA (105 mil. RON without VAT, contract 5R10a, progress status in December 2017 - 100% - section accepted as completed by the national road company).

Initial financing sources for all contracts was: 50% from the state budget, 50% loaned from the European Investment Bank. On 4 December 2013, the Romanian Ministry for European Funds included this project on the list of infrastructure projects financed by the EU. The Ministry sent to the European Commission a request to evaluate the financing of this sector, for a total of 210 million Euro (of which 142 million Euro from the EU through the ERDF mechanism).[4]

  • B. Deva – Petroșani [good, done]: The road has been significantly improved in the last years, being widened and having excellent asphalt quality on the entire section of the road (construction finished in 2012). It has recently been repaired (top layer of asphalt replaced). Small portions may still be under repair near Simeria (as of August 2021), but all work should finish in autumn/winter 2021. The portion Simeria-Hateg has no road markings (August 2021), but this too should be fixed by the end of the year.
  • C. Petroșani – Bumbești Jiu [good, small part still under construction - less than 1 km]: This section should be considered as good. Conditions have improved in late 2017 [5] (due to rehabilitation work done by Copisa Constructora Pirenaica–Chirulli Andrea Impresa Individual–Coremi Inter joint venture - 34 mil. euro contract, signed on 29 June 2012). On 29 November 2013, the Romanian Ministry for European Funds sent to the European Commission a request to evaluate the financing of this sector, for a total of 396 million Euro (of which 288 eligible for EU funds, of which 244 million Euro from the EU through the ERDF mechanism).[6] Works on this section were expected to take around two years, and were expected to be finished by the end of 2014.[citation needed] In December 2016, the section was still under construction on about 40% of its length. It is currently almost completely rehabilitated, with very good asphalt and jersey blocks to prevent fall into the valley. A small part of the road (less than 1 km), near an old monastery (Lainici), is still under construction in 2021 (as several variants were considered to move traffic away from the building). 2 bridges over the river Jiu are still under construction (Lainici and Bumbești), but will most likely be finished during 2018.
  • D. Bumbești Jiu – Craiova [good, minor construction work]: The section Bumbești Jiu – Rovinari is in good condition, almost completely rehabilitated (rehabilitation work by Asocierea Comsa S.A.U. - Corporate Management Solution SRL, 117 mil. RON, 85% FEDR + 15% National funds, 90% done in January 2016 according to the national roads company [7]). The section Rovinari - Filiasi has been repaired in 2010, by FCC Construccion,[citation needed] and is currently in good condition. The section Filiași – Craiova is part of the DN6 road and is in good condition, also being repaired in 2010.
  • E. Craiova – Calafat [good, almost done, cca. 95%]: In December 2017, the 2 sub-sections (Craiova-Galicea Mare, Galicea Mare-Calafat) are 92%, and 98% done.[8] On 6 December 2013, the Romanian Ministry for European Funds sent to the European Commission a request to evaluate the financing of this sector, for a total of 73 million Euro (of which 47 million Euro from the EU through the ERDF mechanism).[9]

Bulgaria

The Bulgarian section of E79 spans nearly 400 km (250 mi) from the North Bulgarian city of Vidin, connecting the Calafat–Vidin Bridge (or, alternatively, the Vidin-Calafat ferry line) across the Danube River and straight southwards towards Bulgaria's capital Sofia. The road has moderately good surface, it is constantly maintained and repaired and well signed with directing signs in Bulgarian and in English. Most of the length from Vidin to Botevgrad, the road is two-lane tarmac road following the natural relief of the landscape. There are sections where 3 lanes for overtaking slow-moving traffic are available. Rest stops and parking spots near the road are also available. The Bulgarian Traffic law prescribes a 50 km/h (31 mph) in most residential areas coinciding with the route of the road and not more than 90 km/h (56 mph) on the section of the road outside living areas. There are plans to upgrade Vidin-Botevgrad road to a grade separated expressway (close to motorway standard), allowing speeds up to 140 km/h (87 mph).

From Botevgrad to Sofia, E79 joins Hemus motorway, designated A2. At the Bulgarian capital Sofia you have to enter the Ring Road, until Sofia Northern Bypass motorway is built. Signage is available. From Sofia to south there are 52 km (32 mi) of motorways (A6 Lyulin motorway and A3 Struma motorway) to Dupnitsa-north interchange. The Bulgarian Traffic law allows speeds up to 140 km/h (87 mph) on motorways unless otherwise stated. The road is leading from Dolna Dikanya to south, right to the Kulata-Promachonas. All the way to the Border Check point the road is of the standard 2-lane tarmac except for the section from the Pernik Province-Blagoevgrad Province border and the southern entrance to the city of Blagoevgrad where the road is of highway type and is 8 km (5.0 mi) long. The section between Dupnitsa and Blagoevgrad, 37 km long, has been upgraded to a motorway standard and opened to traffic 2015. Also the last of these sections - lot 4 from Sandanski-south to the Greek border of 13 km opened to traffic in August 2015. The stretch between Blagoevgrad and Sandanski - lot 3 - passes through the Kresna Gorge and is planned to feature a 13.3 km (8.3 mi) tunnel, which will be the longest motorway tunnel in Eastern Europe, whose construction will begin in 2015 and will cost app. EUR 650 mln.

There are no restriction to trucks driving in the weekends (except when temps rise above 38 °C (100 °F)) so they pose additional road hazard particularly high when driving at night. Traffic is usually heavy in weekends and overtaking has to be done swiftly and without risk, minding the other participants in the traffic.

At night, motorcyclists are required (and that is strongly advisable for their own safety) to use high-visibility vests.

Greece

The Greek Section of E79 has a length of about 120 km (75 mi). After crossing the Bulgarian-Greek border entering into Greece, the road drastically improves as it has been upgraded to a motorway; and speeds of up to 120 km/h (75 mph) are common. After the Promachonas Border Checkpoint, there is a section in construction, about 20–30 km. After that the new 3 lane motorway is well managed, repaired and policed up to the city of Loutra Serron. Construction and upgrading works are still continuing near Serres (due to state budget cuts, works are not scheduled to complete before 2015). After Serres the 3 lane motorway continues for a further 60 km (37 mi) and finally ends at a large junction with the A2/E90, which then provides direct access with Thessaloniki's Ring Road motorway and onto Chalkidiki, for travellers heading south.

References

  1. ^ "European Agreement on Main International Traffic Arteries (AGR)" (PDF). UN Economic and Social Council. 14 March 2008.
  2. ^ "Harta calitatii drumurilor din Romania".
  3. ^ "Drumul National 76". www.facebook.com. Retrieved 2018-01-04.
  4. ^ "Mfe 2014-2020 -".
  5. ^ "DN: Drumuri Nationale".
  6. ^ "Mfe 2014-2020 -".
  7. ^ "Archived copy" (PDF). Archived from the original (PDF) on 2016-01-31. Retrieved 2016-01-25.{{cite web}}: CS1 maint: archived copy as title (link)
  8. ^ "Record ruşinos în infrastructură: Deşi 2017 a fost anul relansării proiectelor de autostrăzi, numai 15 km sunt gata | Ziarul Financiar". www.zf.ro. Retrieved 2018-01-04.
  9. ^ "Mfe 2014-2020 -".

Read other articles:

Parque Nacional do Superagui Nationalpark Atlantskog Land  Brasilien Delstat Paraná Höjdläge 10 m ö.h. Koordinater 25°25′10″S 48°13′09″V / 25.41957°S 48.21919°V / -25.41957; -48.21919 Tidszon BRT (UTC-3)  - sommartid BRST (UTC-2) Geonames 7622480 Parque Nacional do Superagui är en nationalpark i Brasilien.[1] Den ligger i delstaten Paraná, i den södra delen av landet, 1 100 km söder om huvudstaden Brasília. Parque…

Beby Chaesara Anadilaᮘᮦᮘᮤ ᮎᮦᮞᮛ ᮃᮔᮓᮤᮜLahirBeby Chaesara Anadila18 Maret 1998 (umur 25)Bandung, Jawa Barat, IndonesiaKebangsaanIndonesiaNama lainBebyAlmamaterUniversitas Atma Jaya JakartaPekerjaan Aktris Penyanyi Penari Presenter Tahun aktif2011 - sekarangPenghargaanPeringkat 5 (Senbatsu) — Pemilihan Member Single ke-6 JKT48 (2014)Peringkat 12 (Senbatsu) — Pemilihan Member Single ke-10 JKT48 (2015)Peringkat 22 (Undergirls) — Pemilihan Member Single ke…

جيني لونغو (بالفرنسية: Jeannie Longo)‏  معلومات شخصية الميلاد 31 أكتوبر 1958 (العمر 65 سنة)آنسي الطول 164 سنتيمتر  الجنسية  فرنسا الوزن 47 كيلوغرام  الحياة العملية الدور دراج المهنة دراجة  نوع السباق ركوب الدراجات الجبلية  بلد الرياضة فرنسا  الجوائز  نيشان الاستحقاق ا…

U.S. trade group For other uses, see CIMM (disambiguation). Coalition for Innovative Media MeasurementTypeCoalitionIndustryAdvertising and Media MeasurementFounded2009HeadquartersNew York CityWebsitecimm-us.org The Coalition for Innovative Media Measurement (CIMM) is a trade group founded in 2009 by television content providers, media agencies and advertisers to explore ways to measure audiences across media in the United States. Initiatives CIMM's initiatives are related to the goals of improvi…

Landtag des Fürstentums Liechtenstein Basisdaten Sitz: Vaduz Legislaturperiode: vier Jahre Erste Sitzung: 1818 Abgeordnete: 25 Aktuelle Legislaturperiode Letzte Wahl: 7. Februar 2021 Nächste Wahl: voraussichtlich 2025 Vorsitz: LandtagspräsidentAlbert Frick (FBP) 3 10 10 2 3 10 10 2  Sitzverteilung: Regierung (20) VU 10 FBP 10 Opposition (5) FL 3 DpL 2 Website www.landtag.li Parlamentsgebäude Landtagswahl 2021 (in %)[1]  %4…

  لمعانٍ أخرى، طالع رون وايت (توضيح). رون وايت   معلومات شخصية الميلاد 18 ديسمبر 1956 (67 سنة)  فريتش  مواطنة الولايات المتحدة  الحياة العملية المهنة ممثل،  وممثل تلفزيوني،  وسياسي،  وكاتب أغاني،  ومؤدي أصوات،  وكاتب سيناريو  اللغة الأم الإنجليزية  …

Cet article est une ébauche concernant une équipe nationale de football et le Ghana. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. Équipe du Ghana de football à la Coupe du monde 2014 Fédération GFA Classement 25e (premier tour) Organisateur(s) Brésil Participation 3e Meilleure performance 7e (quart de finale) en 2010 Sélectionneur James Kwesi Appiah Capitaine Asamoah Gyan Meilleur buteur André Ayew et As…

Nowhere kan verwijzen naar: geografie gemeenschap in Caddo County: Nowhere (Oklahoma) media film uit 1997 onder regie van Gregg Araki: Nowhere (film) muziekalbum uit 1990 van de Britse groep Ride: Nowhere (album) Bekijk alle artikelen waarvan de titel begint met Nowhere of met Nowhere in de titel. Dit is een doorverwijspagina, bedoeld om de verschillen in betekenis of gebruik van Nowhere inzichtelijk te maken. Op deze pagina staat een uitleg van de verschillende betekeni…

Piranoscopio: muestra de los principales componentes del instrumento: unidad de ignición, depósito de combustible, válvula solenoide principal y vasija de aire comprimido. Dimensiones: el diámetro del depósito ronda los 5 cm, la altura supera los 2 m. Consume alrededor de 3 litros de combustible por cada deflagración. Un piranoscopio es un instrumento para mostrar grandes llamas controladas. El nombre piranoscopio tiene sus raíces en el griego, πῦρ piro que significa fuego, …

بوبي كانفال (بالإنجليزية: Bobby Cannavale)‏  معلومات شخصية الميلاد 3 مايو 1970 (العمر 53 سنة)نيو جيرسي، الولايات المتحدة الإقامة نيويورك  مواطنة الولايات المتحدة  العشير روز بيرن  الحياة العملية المدرسة الأم ثانوية يونيون  [لغات أخرى]‏  المهنة ممثل الحزب الحزب الدي…

Para otros usos de este término, véase Universidad Central. Universidad Central de Chile Sigla UCENLema Pluralismo, Compromiso, InclusiónTipo PrivadaFundación 9 de noviembre de 1982 (41 años)LocalizaciónDirección Calle Toesca 1783 Santiago, Región Metropolitana, Chile ChileCampus Campus Gonzalo Hernández Uribe, Campus Vicente Kovacevic I y II, Campus Región de Coquimbo.Coordenadas 33°27′11″S 70°39′36″O / -33.452937, -70.660008Otras sedes Región de C…

بصائر الدرجات غلاف الكتاب الاسم بصائر الدرجات العنوان الأصلي بصائر الدرجات المؤلف محمد بن الحسن الصفار القمي الموضوع علم الحديث و الكلام العقيدة الشيعة اللغة العربية معلومات الطباعة تاريخ الإصدار 1938  كتب أخرى للمؤلف الصلاة، ما روي في أولاد الأئمة، الرد على الغلاة و... تع

American basketball referee Richie PowersPowers officiating the 1976 NBA FinalsBorn(1930-10-14)October 14, 1930New York City, New York, U.S.DiedJuly 31, 1998(1998-07-31) (aged 67)Allentown, Pennsylvania, U.S.NationalityAmericanOccupationNBA referee (1956–1979)Spouse(s)Virginia; a second marriage ended in 1987 Richard Francis Powers (October 14,[1] 1930 – July 31, 1998)[2] was a professional basketball referee in the NBA from 1956 to 1979.[2] He worked 25 NBA Fina…

بيتي لو جيرسون   معلومات شخصية الميلاد 20 أبريل 1914  تشاتانوغا  الوفاة 12 يناير 1999 (84 سنة)   لوس أنجلوس  سبب الوفاة سكتة دماغية  مواطنة الولايات المتحدة  الحياة العملية المهنة ممثلة،  وممثلة تلفزيونية،  ومؤدية أصوات،  وممثلة أفلام  اللغة الأم الإنجليز…

Pertempuran di Lembah ZefataKerajaan Yehuda (warna hijau muda pada peta)TanggalAwal abad ke-9 SM, antara tahun 911-870 SM pada masa pemerintahan Asa, raja YehudaLokasiLembah Zefata dekat Maresa, Kerajaan Yehuda (sekarang Israel)Hasil Kemenangan mutlak Yehuda Serangan-serangan orang Mesir ke Yehuda berhenti sampai pertengahan abad ke-6 SM.Perubahanwilayah Orang Mesir dan Etiopia gagal menyerang YehudaPihak terlibat Kerajaan Yehuda Pasukan Mesir dan pasukan EtiopiaTokoh dan pemimpin Asa, raja Yehu…

25th episode of the 9th season of The Simpsons Natural Born KissersThe Simpsons episodeEpisode no.Season 9Episode 25Directed byKlay HallWritten byMatt SelmanProduction code5F18Original air dateMay 17, 1998 (1998-05-17)Episode featuresChalkboard gagI was not the inspiration for Kramer[1]Couch gagThe Simpson family appear as frogs on a lily pad and Homer turns on the TV with his long tongue.[2]CommentaryMatt GroeningMike ScullyGeorge MeyerMatt SelmanDan Castella…

BoleskineFull nameBoleskine Camanachd ClubGaelic nameComann Camanachd Bhoth FhleasgainnNicknameThe WaspsFounded1927GroundSmith Park, InverarnieManagerGraham BlackLeagueNorth Division Two20167th Home Boleskine Camanachd is a shinty club from Loch Ness-side, Scotland. They play in the Marine Harvest North Division Two. The club in its present form has existed as such since 1953. History Boleskine Camanachd has been in existence in one form or another for over 100 years. Initially called Stratherri…

Governing body of LDS Church This article is about the Twelve in The Church of Jesus Christ of Latter-day Saints. For wider use in the Latter Day Saint movement, see Quorum of the Twelve. The First Presidency and the Quorum of the Twelve Apostles in September 1898[1] In the Church of Jesus Christ of Latter-day Saints (LDS Church), the Quorum of the Twelve Apostles (also known as the Quorum of the Twelve, the Council of the Twelve Apostles, or simply the Twelve) is one of the governing bo…

Iraqi football club Football clubAl SamawaFull nameAl Samawa Sports ClubFounded1963; 60 years ago (1963)GroundAs Samawah StadiumCapacity15,000ChairmanNamir HasoonManagerAli JawadLeagueIraq Division Two2022–23Iraq Division One, 12th in Group 2 (relegated) Home colours Away colours Current season Al-Samawa SC (Arabic: نادي السماوة) is an Iraqi sports club based in As-Samawa, Al-Muthanna, that competes in the Iraq Division One,[1] the second tier of Iraqi foot…

Peninsula in New York, United States 41°04′13″N 71°57′36″W / 41.07028°N 71.96°W / 41.07028; -71.96 Photo from parking lot at the top of the bluff in July 2006. The large rock with red on its side is the landmark for scuba divers, who follow a heading of 333 degrees from it to reach the wreck of HMS Culloden One of the more than 200 Leisurama second homes at Culloden Point. (July 2006) Culloden Point is a small peninsula north of Montauk, New York, that ma…

Kembali kehalaman sebelumnya

Lokasi Pengunjung: 3.149.26.83