You can help expand this article with text translated from the corresponding article in Czech. Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Czech Wikipedia article at [[:cs:Dálnice D5]]; see its history for attribution.
You may also add the template {{Translated|cs|Dálnice D5}} to the talk page.
D5 motorway (Czech: Dálnice D5) is a highway in the Czech Republic. It runs from Prague through Plzeň into Germany. D5 is 151 kilometres (94 mi) long; a bypass of Plzeň includes the 380-metre-long (1,250 ft) Valík Tunnel and the 445-metre-long (1,460 ft) bridge over the River Úhlava. Section between Prague and Beroun is planned to be improved to three lanes in each direction.[1]
Construction
Construction of the D5 began in 1976, with the first 5.8 km long segment opening in 1982. In 1985 another part to Beroun was opened. 29 km of the planned 150 km was already in use in 1989 from Prague to Bavoryně.[2] The biggest problem was with the bypass of Plzeň that was in 1988 planned to be the northern varint. In 1991 it was changed to the southern variant that was supposed to use deep notch thru hill Valík. That started long discussions and court battles that lasted until November 2001 and the construction of the bypass including the tunel under the hill Valík started after that. That was the last part of the highway to be constructed as the rest from Plzeň to the Rozvadov-Waidhaus border crossing was already in use since 1997.[3] The final part was opened on 6 October 2006.
Very important part of the D5 highway is the tunnel Valík bypassing the city of Pilsen. The technology inside of the tunnel is controlled by a Reliance SCADA system[4] The tunnel was opened on October 6, 2006.[2]