^Adam Linhardt (2013-07-07). "Coast Guard: Fast times ahead". Key West: Florida Keys News. Archived from the original on 2013-07-15. Retrieved 2013-07-14. The first of six brand spanking new 154-foot Sentinel-class ships called Fast Response Cutters is set to arrive on Aug. 17 in Key West and crews of the new vessels are arriving to train.
^"Bollinger Shipyards delivers seventh Sentinel Class cutter". Lockport, Louisiana: Marine Log. 2013-08-20. Archived from the original on 2013-08-27. Retrieved 2013-08-20. The 154-foot patrol craft Charles David Jr. is the seventh vessel in the Coast Guard's Sentinel-class FRC program. To build the FRC, Bollinger Shipyards used a proven, in-service parent craft design based on the Damen Stan Patrol Boat 4708. It has a flank speed of 28 knots, state of the art command, control, communications and computer technology, and a stern launch system for the vessels 26 foot cutter boat. The FRC has been described as an operational "game changer," by senior Coast Guard officials.
^
Keith Magill (2013-08-20). "Bollinger delivers latest Coast Guard cutter". Daily Comet. Retrieved 2013-08-21. The 154-foot Charles David Jr. was delivered Friday to the 7th Coast Guard District in Key West, Fla., where it will be commissioned in November.
^Sean Kinney (2013-11-13). "First of six new Keys Coast Guard cutters is commissioned Saturday". Key News. Archived from the original on 2013-11-14. Retrieved 2013-11-14. With commissioning set for Saturday of the fast-response cutter Charles David Jr., U.S. Coast Guard Sector Key West will take the first step in a two-year overhaul of the locally homeported fleet.