Chongqing Suburban Railway

Chongqing Suburban Railway
Overview
Native name重庆市郊铁路
LocaleChongqing, China
Transit typeCommuter rail, rapid transit
Websitehttp://www.cqrailway.com
Operation
Operator(s)Chongqing Railway Group Co, Ltd
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead line
Top speed100 km/h (62 mph) – 200 km/h (120 mph)
Chongqing Suburban Railway
Simplified Chinese重庆市郊铁路
Traditional Chinese重慶市郊鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinChóngqìng Shìjiāo Tiělù
other Mandarin
Sichuanese PinyinCong2qin4 Si4jiao1 Tie2nu4

Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing, China. According to the Comprehensive Transport Plan of Chongqing Main City Zone, the system will have a total of 14 lines.

Network

Opening Project Terminus Top speed Type Length (km) New stations Start of construction Status Notes
2022 Jiangtiao[Note 1] Phase I Tiaodeng Shengquansi 120 km/h (75 mph) Double-track 26.7 7 2014 Operational [1]
TBA Yuhe Yuhe line Moxinpo Weituo 160 km/h (99 mph) Double-track 49.5 5 TBA On hold
TBA Heyong Heyong line Huangniba Yongchuannan 160 km/h (99 mph) Single-track 95.0 8 TBA In planning
2024 Bitong Bitong line Bishan Tongliangxi 140 km/h (87 mph) Double-track 37.5[2] 9[2] 2019 Under testing [2]
2025 Jiangtiao[Note 1] Phase II Shengquansi Dingshan 120 km/h (75 mph) Double-track 4.61 2 2022 In full construction [1]

See also

References

  1. ^ a b "重点项目". 重庆铁路(集团)有限公司 (in Chinese (China)). Retrieved April 2, 2017.
  2. ^ a b c "璧铜线开工 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑". November 29, 2019.

Notes

  1. ^ a b Through service with Line 5 (Chongqing Rail Transit)