This article needs to be updated. Please help update this article to reflect recent events or newly available information.(October 2016)
The Airports Commission was an independent commission established in September 2012 by the Government of the United Kingdom to consider how the UK could "maintain its status as an international hub for aviation and immediate actions to improve the use of existing runway capacity in the next 5 years".[1] Alongside the proposal to build HS2, the question of how to make best use of and expand airport capacity had become the UK's most significant infrastructure issue over the preceding few years.
The five person commission, which was chaired by the economist Sir Howard Davies and reported to the Department for Transport (DfT), produced an Interim Report in December 2013 and delivered a Final Report in July 2015. It unanimously concluded in favour of a new northwest runway at Heathrow Airport.
Since the 1980s finding solutions to address the shortage of airport capacity has become more difficult because of the growth and development of Heathrow Airport as the UK's only hub airport, as opposed to all other UK airports which are based on the point-to-point airport operating model. The provision of additional capacity at major point-to-point airports, such as Gatwick or Stansted, would not address the UK's shortage of hub airport capacity. In 1978 the Traffic Distribution Rules were introduced to try to encourage British Airways (BA) to make greater use of Gatwick Airport as a second hub. However, in 1991, having incurred significant financial losses, BA ceased most of its operations from the airport.[4] Today, Stansted—despite having very low landing charges—operates at less than 50% capacity and is home to a completely different set of low-cost airlines compared to the full-service airlines which operate at Heathrow.
Heathrow has been unable to expand to meet the rapid growth in demand for air travel and in particular from transfer passengers on which hub airports depend. This inability to expand has been due to a combination of:
These factors result in significant noise and air quality impacts for local residents and pose a major safety risk. As a result, there is widespread local opposition to the expansion of the airport even though many local people benefit from it in terms of employment. In part due to this issue, there are also a large number of marginal Parliamentary constituencies located around the airport meaning that whenever one of the two main political parties (Labour or Conservatives) develop a proposal or project to expand the airport, it is guaranteed to be opposed by the other party.
A number of such proposals and projects have been proposed over the years, but these have all been cancelled at a later date due to a lack of national political consensus. Heathrow's inability to expand means that the airport has been operating its two runways at about 98% capacity since 2003.
As a result, its status as a global hub airport has been declining in terms of the growth in passenger numbers and number of destinations served, compared to its competitor hub airports in Europe (Schiphol, Paris and Frankfurt) and in relation to the recent rapid growth of Middle Eastern airports (Istanbul, Dubai, Abu Dhabi and Doha).[5]
Heathrow third runway
The Labour Government's 2003 Aviation White PaperThe Future of Air Transport proposed that a third runway (R3) should be built at Heathrow, albeit with restrictions on the number of additional air traffic movements at the airport.[6] The publication of specific plans for the extra runway was delayed until 2009 because of the public inquiry into the construction of a fifth terminal.[7] However, by this time the 2010 general election was only a year away and the then opposition Conservative Party, eager to secure a political advantage, vigorously opposed R3 and vowed to cancel the project if they won the election.
Analysis proves the outcome of the 2010 election was influenced by the rejection of Heathrow's 3rd runway. Conservatives formed a Coalition Government with the Liberal Democrats, who opposed all airport expansion, and R3 was immediately cancelled.
Current research has revealed various reasons to further reduce flights at Heathrow, such as study undertaken in 2012 by MIT who presented evidence in a feasibility study on the fatal impacts of pollution across a wide spread area over London. The evidence suggests that another runway would increase fatalities by pollution 3 times the current amount.
Recent global connectivity concerns
Since 2010 there have been growing concerns that the lack of UK hub airport runway capacity is preventing the UK from establishing additional air connections to fast growing emerging economies and is harming the economy.[8]London MayorBoris Johnson – who strongly opposes expansion of Heathrow and was at the time widely[who?] tipped to succeed David Cameron as Conservative Party leader – and leading architect Norman Foster has proposed a landbased estuarine scheme on the Isle of Grain, as well as a consortium of professionals TESTRAD proposing a new airport in the Thames Estuary. In addition the management of Heathrow and business groups have started to campaign for additional runway capacity, whether at Heathrow or elsewhere.[9]
The government hoped that by establishing an independent commission it would be able to secure cross-party political consensus over the issue of how to expand London's airports. In particular it hoped that the commission's recommendations would be accepted by all political parties and as a result could be implemented by the newly elected government when the commission publishes its final report in Summer 2015.
The commission will examine the scale and timing of any requirement for additional capacity to maintain the UK's position as Europe's most important aviation hub; and it will identify and evaluate how any need for additional capacity should be met in the short, medium and long term.
It should maintain a UK-wide perspective, taking appropriate account of the national, regional and local implications of any proposals.
It should engage openly with interested parties and members of the public, providing opportunities to submit evidence and proposals and to set out views relevant to its work.
It should seek to engage with a range of stakeholders, including with local and devolved government as well as the opposition, to build consensus in support of its approach and recommendations.
The commission should report no later than the end of 2013 on:
its assessment of the evidence on the nature, scale and timing of the steps needed to maintain the UK’s global hub status
its recommendation(s) for immediate actions to improve the use of existing runway capacity in the next five years – consistent with credible long term options
The assessments and recommendations in the commission's interim report should be underpinned by a detailed review of the evidence in relation to the current position in the UK with regard to aviation demand and connectivity, forecasts for how these are likely to develop, and the expected future pattern of the UK's requirements for international and domestic connectivity.
Its assessments of potential immediate actions should take into account their economic, social and environmental costs and benefits, and their operational deliverability. It should also be informed by an initial high-level assessment of the credible long-term options which merit further detailed development.
The commission should report no later than summer 2015 on:
its assessment of the options for meeting the UK’s international connectivity needs, including their economic, social and environmental impact
its recommendation(s) for the optimum approach to meeting any needs
its recommendation(s) for ensuring that the need is met as expeditiously as practicable within the required timescale
The commission should base the recommendations in its final report on a detailed consideration of the case for each of the credible options. This should include the development or examination of detailed business cases and environmental assessments for each option, as well as consideration of their operational, commercial and technical viability.
As part of its final report in summer 2015, it should also provide materials, based on this detailed analysis, which will support the government in preparing a national policy statement to accelerate the resolution of any future planning applications for major airports infrastructure.
On 1 February 2013 the commission invited submissions for proposals to make best use of existing capacity in the short and medium term (proposals that could be implemented within five years) and to provide additional capacity in the longer term.[11] Proponents had to confirm their intention to submit proposals by 28 February 2013. Short and medium term proposals had to be submitted to the commission by 17 May 2013. Longer term proposals, of no more than 40 pages, had to be submitted by 19 July 2013. In addition the commission requested suggestions for sifting criteria to be used in developing the Interim Report by 15 March 2013.
In May 2013 the commission published its sift criteria against which longer term capacity proposals would be assessed.[12] The commission envisaged that a small number of preferred proposals would be short listed for further study during 2014 and 2015 in its Interim Report in December 2013. The outcome of those studies would enable the commission to recommend a preferred location for additional hub airport capacity.
The commission has received and published 70 short/medium term proposals and 58 long term proposals from existing airports, architects, developers, engineers, other organisations and members of the public.[13][14]
Sir Howard has acknowledged that the number of proposals received was more than the commission had envisaged.[15]
Discussion papers
To inform its work, the commission has published discussion papers on:
aviation demand forecasting;
connectivity and economy;
aviation noise;
airport business operating models; and
aviation and climate change.
The commission sought stakeholder comments on these papers and has published the technical and non-technical responses that it has received.[16][17]
The Commission published a sixth discussion paper calling for evidence on the Utilisation of the UK's Existing Airport Capacity in June 2014.[18]
The Commission published its seventh discussion paper on the Delivery of New Runway Capacity on 1 July 2014.[19]
Evidence sessions
The commission held evidence sessions in London and Manchester in July 2013 and published the transcripts and other documents presented in those sessions.[20]
Meetings and Visits
The Commission has had meetings with a wide range of stakeholders[21] and has held briefings with Members of Parliament and Local Authorities. The Commission has also undertaken a programme of visits to UK and international airports, to the Isle of Grain and to the Heathrow and Gatwick areas to meet local political representation and residents groups.[22]
Emerging thinking
On 7 October 2013 Sir Howard gave a speech in which he set out the emerging thinking of the commission.[23] Their main findings to date were that additional runway capacity would be needed in the longer term and that it should be provided within the South East of England. Whilst regional airports have an important role of play in the UK's airports system, they would be unable to provide the capacity that is needed in the South East.
the commission will short list up to five options, rather than sites, in its Interim Report;
alongside the Interim Report, a draft appraisal framework, that will be used to assess options, will be published for consultation. A final appraisal framework will be published in March 2014;
short listed scheme promoters will be asked to work with the commission to develop business cases between April and August 2014 (the commission had previously indicated that the studies would last for 18 months). The business cases must be developed to a level of detail that will enable DfT to produce a draft National Policy Statement by December 2015;
the commission will continue to engage with the leaders of the main political parties;
the commission will hold a public consultation about the five options between October and December 2014 and will encourage scheme promoters to do likewise in the local area for their proposed scheme;
the commission may also hold further evidence sessions;
the commission will go into purdah between December 2014 and June 2015 to avoid becoming involved in the General Election. Sir Howard expects that the commission's work will not be mentioned in the election manifestos;
the commission's Final Report will be published as soon as possible after the General Election and will only recommend 'one option' for further capacity;
there is a strong possibility of a Judicial Review after the Interim Report is published, but he does not think that this will delay the process much.
Sir Howard invited the public to submit responses to the commission about these findings.
Interim Report
The Commission published its Interim Report and associated appendices, and consultants reports on 17 December 2013.[25] A transcript of the stakeholder briefing on the Interim Report held at the Institute of Civil Engineers on the morning of publication and chaired by Sir Howard was later published alongside the other documents.
The report sets out the Commission's assessment of the UK's future aviation capacity need and concluded that one net new additional runway would be required in London and south east England by 2030.
The Commission shortlisted three proposals to deliver additional capacity: A proposal from Heathrow Airport Ltd for an additional runway to the NW of the existing runways; a proposal from Heathrow Hub Ltd for a new runway to the west of the existing northern runway; and a proposal from Gatwick Airport Ltd for a second runway to the south of the existing runway. The Interim Report committed the Commission to publish an Appraisal Framework setting out how it will assess each of the short listed options.
The report contained a package of recommendations to the UK Government to make the best use of existing airport capacity:
An 'Optimisation Strategy' to improve the operational efficiency of UK airports and airspace, including: Airport Collaborative Decision Making; airspace changes supporting performance based navigation; enhanced en-route traffic management to drive tighter adherence to schedules; and Time Based Separation.
Trials at Heathrow of measures to smooth the early morning arrival schedule to minimise stacking and delays and to provide more predictable respite for local people.
The establishment of a Senior Delivery Group to drive forward the implementation of the Future Airspace Strategy and the delivery of the Commission's recommendations.
The creation of an Independent Aviation Noise Authority to provide expert and impartial advice about the noise impacts of aviation and to facilitate the delivery of future improvements to airspace operations.
A package of surface transport improvements to make airports with spare capacity more attractive to airlines and passengers, including: the enhancement of Gatwick Airport Station; further work to develop a strategy for enhancing Gatwick's Road and Rail Access; work on developing proposals to improve the rail link between London and Stansted; work to provide rail access into Heathrow from the South; and, the provision of smart ticketing facilities at airport stations.
In this report the Commission said it would undertake further work before deciding whether to add an airport in the inner Thames Estuary to its shortlist.
Inner Thames Estuary Studies
On 27 March 2014, after consultation, the Commission published the terms of reference[26] for the additional work it would undertake on an inner Thames Estuary proposal.
Study 2: Operational feasibility and attitudes to moving to a new airport
Study 3: Socio-economic impacts
Study 4: Surface access impacts
Between 4 and 10 July 2014 the Commission published the reports from each of the four studies for public comment.[28]
On 2 July 2014 the Commission announced that it would not add a proposal for an airport in the inner Thames Estuary to its shortlist of options for additional capacity.[29] Alongside the announcement the Commission published a Summary and Decision paper setting out the reasons for its decision and the work it had undertaken to reach its decision.[30]
Appraisal Framework
On 2 April 2014, after consultation, the Commission published its Appraisal Framework[31] for assessing the three options for additional capacity shortlisted in the Interim Report.
The Appraisal Framework explains how the Commission expects scheme designs to be developed, and how it will appraise the schemes. The framework incorporates four elements:
the Commission's objectives, against which options will be assessed and on which its final recommendations will be based;
an updated scheme design for each short-listed option, to be used as the starting point for appraisal;
a business case and sustainability assessment for each option, incorporating the information needed to make informed assessments against the Commission's objectives; and
a set of appraisal modules explaining the methodologies that the Commission proposes to use in assessing options.
Annex B of the Appraisal Framework sets out how scheme promoters might present updated scheme designs of the shortlisted proposal to the Airports Commission.
Consultation
In its Interim Report the Commission committed to consult on its appraisal of the shortlisted options in autumn 2014.
The Commission published its consultation[32] on 11 November 2014, to run for 12 weeks until midnight on 3 February 2015.
The consultation consists of a Consultation Document, outlining the high-level summary of the commission's appraisal of the three shortlisted schemes, with more detailed documentation below it including individual business cases and sustainability assessments, consultants' reports and technical analysis produced by the Commission.
As part of the consultation the Commission said it will hold two public evidence sessions, in the Heathrow area, and the other in the Gatwick area.
Reaction
The Conservative, Labour and Liberal Democratic parties have welcomed the establishment of the commission, although none of the parties has said unequivocally that it will fully accept and implement the commission's findings if it wins the 2015 general election. Labour's Shadow Transport Secretary Mary Creagh told the Financial Times that the party "is reserving the right to reject the recommendations of the Davies review of aviation."[33]
The commission has also been welcomed by the UK aviation industry and business organisations, although there has been frustration at the length of time the commission will take to produce its Final Report.
Controversies
Establishment of the commission
Although the commission mirrors the Third London Airport Commission, chaired by Eustace Roskill between 1968 and 1971, in recent years the UK Government has normally used independent commissions to address complex or technical issues, where specialist expertise is required, rather than policy issues such as the choice of where to provide more hub runway capacity. As a result, the government's decision to use a panel of unelected people to make a recommendation about such a wide-ranging and political decision has been criticised.[34]
Date of final report
The government's terms of reference for the commission state that the commission's final report will be produced in Summer 2015 after the next general election. Many people have questioned this date because, without the commission's Final Report, the political parties contesting the election will be unable to state their policies to the electorate about the proposed expansion of airports in the South East of England.
In a House of Commons debate on the Transport Select Committee's Aviation Strategy report[35] on 24 October 2013, John McDonnell the Labour Member of Parliament for Hayes and Harlington – an area adjacent to the airport – called the Commission's timetable undemocratic and asked for the date of its Final Report to be brought forward to a date before the election.[36] In response to McDonnell, Transport MinisterRobert Goodwill said that the commission needed time to do its work and the government will not ask the commission to bring forward the date of its Final Report.
Following pressure from the campaign group Stop Stansted Expansion (SSE) during Summer 2013, Geoff Muirhead, the only member of the commission with experience of working in the aviation sector, resigned from the commission in September 2013 because of a perceived conflict of interest with his former role at MAG.[38][39]
Muirhead resigned because although he had stepped down as CEO of MAG in 2010, he remained in an ambassadorial role (and paid £75,000 per year) at the company until January 2013 – two months after he had been appointed as a member of the commission. In February 2013 MAG subsequently bought Stansted Airport and in July 2013 MAG submitted two long term proposals to the Commission – one for a second runway and the second for a four runway hub airport.
The DfT said that although there was no evidence whatsoever of bias, it was considered prudent for Muirhead to step aside and that no decision had been taken as to whether Muirhead will be replaced.
In October 2013 SSE launched a legal action for a Judicial Review in the High Court against the commission alleging bias because Muirhead had been involved in the development of the sift criteria that the commission will use to shortlist runway capacity options in December 2013.[40] SSE's barrister Paul Stinchcombe QC argued that Muirhead's resignation was too late to "save the sift criteria proceedings" and that Muirhead had "tainted .... the Commission's activities by reason of apparent bias".
In a statement the Airports Commission said it "firmly rejects the claims made by Stop Stansted Expansion, and considers its processes to date to have been appropriate and robust. The commission’s sift criteria were informed by public consultation and incorporate a wide range of environmental, economic and social factors – including local environmental issues such as impacts on landscape and the built heritage. The sift criteria demonstrate the openness of the commission’s process, and the importance it has placed on an integrated and evidence-based approach to reaching its recommendations."[41]
On 2 December Mrs Justice Patterson in the High Court ruled that there was no basis for a Judicial Review.[42] While the Judge found that it was not wise for Muirhead to have remained as a Commissioner while still working for MAG, she said that there was no real possibility of apparent bias in the sift criteria. This was because:
the Commission had adopted a defensive strategy after legal proceedings had commenced
that Muirhead had stood down from sections of a Commission meeting on 4 September 2013 that dealt with benefits to airports; and
that any decisions made in that meeting were only provisional.
The Judge ordered SSE to pay the Commission's legal costs, but was critical of the Commission for not being more transparent about Muirhead's work for MAG.
In response, SSE said that the legal action had achieved its main objective of removing Muirhead from the Commission and that it would consider whether to appeal the decision.
Howard Davies
In 2009, Sir Howard Davies had been appointed as advisor to the Investment Strategy Committee of GIC Private Limited, formerly known as Government Investment Corporation of Singapore, and in 2011 he had joined its International Advisory Board. Davies resigned from both positions in September 2012, on his appointment to chair the Airports Commission (as GIC Private Limited was, at the time, as it still is, one of Heathrow's principal owners and cheerleaders for Heathrow's expansion). Davies recorded neither of these remunerated interests, when invited to complete the Airports Commission's Register of Interests.[citation needed]
Final report
This section needs expansion. You can help by adding to it. (October 2016)
The Commission published its final report on 1 July 2015. It unanimously concluded that the proposal for a new northwest runway at Heathrow Airport, combined with a package of measures to address its environmental and community impacts, presented the strongest case and offered the greatest strategic and economic benefits – providing around 40 new destinations from the airport and more than 70,000 new jobs by 2050.[43]
Deputi Bidang Usaha Konstruksi dan Sarana dan Prasarana Perhubungan Kementerian Badan Usaha Milik Negara Republik IndonesiaSusunan organisasiDeputiAhmad Bambang [1]Kantor pusatJalan Medan Merdeka Selatan No. 13 Jakarta 10110 IndonesiaSitus webwww.bumn.go.id Deputi Bidang Usaha Konstruksi dan Sarana dan Prasarana Perhubungan merupakan unsur pelaksana pada Kementerian Badan Usaha Milik Negara Republik Indonesia pada Kabinet Kerja (2014–2019) yang berada di bawah dan bertanggung j...
Founder of the Latter Day Saint movement (1805–1844) This article is about the founder of the Latter Day Saint movement. For other persons, see Joseph Smith (disambiguation). Joseph SmithPortrait, c. 1842 1st President of the Church of Christ[a]April 6, 1830 (1830-04-06) – June 27, 1844 (1844-06-27)SuccessorDisputed[b]End reasonDeath 2nd Mayor of Nauvoo, IllinoisIn officeMay 19, 1842 (1842-05-19)[4]...
Moraleja de Matacabrasموراليخا دي ماتاكابراس (بالإسبانية: Moraleja de Matacabras)[1] موراليخا دي ماتاكابراس موراليخا دي ماتاكابراس موقع موراليخا دي ماتاكابراس في مقاطعة آبلة (إسبانيا) تقسيم إداري البلد إسبانيا[2] المنطقة قشتالة وليون المسؤولون المقاطعة آبلة خصائص جغرا...
American entertainment company This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Discotek Media – news · newspapers · books · scholar · JSTOR (March 2012) (Learn how and when to remove this template message) Discotek MediaCompany typePrivateIndustryEntertainmentGenreAnimeasian filmsFounded2005; 19 ...
Provincia di Cosenzaprovincia Provincia di Cosenza – VedutaPalazzo del Governo, sede della Provincia. LocalizzazioneStato Italia Regione Calabria AmministrazioneCapoluogo Cosenza PresidenteRosaria Succurro (FI) dal 20-3-2022 TerritorioCoordinatedel capoluogo39°18′N 16°15′E / 39.3°N 16.25°E39.3; 16.25 (Provincia di Cosenza)Coordinate: 39°18′N 16°15′E / 39.3°N 16.25°E39.3; 16.25 (Provincia di Cosenza) Superficie6 ...
إيميرالد فينيل معلومات شخصية الميلاد 1 أكتوبر 1985 (39 سنة) لندن مواطنة المملكة المتحدة[1] عضوة في نقابة الكتاب الأمريكية الغربية الحياة العملية المدرسة الأم جامعة أكسفوردكلية مارلبورو المهنة ممثلة، وممثلة أفلام، ومخرجة أفلام، وكاتبة سينار�...
Questa voce sull'argomento calciatori italiani è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Ambrogio Valadè Ambrogio Valadè ai tempi del Foggia Nazionalità Italia Altezza 173 cm Peso 67 kg Calcio Ruolo Difensore Termine carriera 1971 Carriera Giovanili Inter Squadre di club1 1956-1959 Inter10 (0)1959-1960 Palermo26 (0)1960-1962 SPAL20 (0)1962-1970 Foggia231 (7)1970...
50th 24 Hours of Le Mans endurance race 1982 24 Hours of Le Mans Previous: 1981 Next: 1983 Index: Races | Winners Le Mans in 1982 The 1982 24 Hours of Le Mans was the 50th Grand Prix of Endurance, which took place on 19 and 20 June 1982. It was also the fourth round of the 1982 World Endurance Championship. As well as a significant anniversary, this was a watershed year for Le Mans, with the highly anticipated advent of the FIA's Group C regulations, the essence of which was to allow an open ...
Crimes committed either by a corporation or its representatives The examples and perspective in this article deal primarily with the English-speaking world and do not represent a worldwide view of the subject. You may improve this article, discuss the issue on the talk page, or create a new article, as appropriate. (January 2018) (Learn how and when to remove this message) Criminology and penology Theory Anomie Biosocial criminology Broken windows Collective efficacy Crime analysis Criminaliz...
River in Nepal and India This article includes a list of general references, but it lacks sufficient corresponding inline citations. Please help to improve this article by introducing more precise citations. (August 2022) (Learn how and when to remove this message) Gandaki RiverNarayaniFrom top: Narayani River in Chitwan, Gandak River in Hajipur, Gandak River in Nepal, Anoma River in Buddhist EraMap showing the Ghaghara and Gandaki tributaries of the GangesLocationCountryNepal, IndiaCitiesLo ...
President of the Dominican Republic (1906–2002) In this Spanish name, the first or paternal surname is Balaguer and the second or maternal family name is Ricardo. The DoctorJoaquín BalaguerBalaguer in 1977President of the Dominican RepublicIn office16 August 1986 – 16 August 1996Vice PresidentCarlos Morales TroncosoJacinto Peynado GarrigosaPreceded bySalvador Jorge BlancoSucceeded byLeonel FernándezIn office1 July 1966 – 16 August 1978Vice PresidentFrancisco ...
Events in French Indochina during World War II Japanese propaganda poster exalting Vichy French and Vietnamese collaboration in Indochina, c. 1942 vteFrench Indochina in World War II1940 Japanese invasion of French Indochina 1940 Bắc Sơn uprising Franco-Thai War 1940 Cochinchina uprising Đô Lương mutiny Battle of Yang Dang Khum Battle of Phum Preav Battle of Ko Chang 1941 Battle of Angkor Thai bombing of Phnom Penh 1942 Chinese bombing of Gia Lam airport 1943 US bombing of Haiphong har...
Una pallottola spuntata 2½ - L'odore della pauraLeslie Nielsen e Priscilla Presley mentre simulano la celeberrima scena del film Ghost - Fantasma.Titolo originaleThe Naked Gun 2½: The Smell of Fear Lingua originaleinglese Paese di produzioneStati Uniti d'America Anno1991 Durata85 min Generecomico, poliziesco RegiaDavid Zucker SoggettoDavid Zucker, Pat Proft SceneggiaturaDavid Zucker, Pat Proft ProduttoreRobert K. Weiss Produttore esecutivoJim Abrahams, Jerry Zucker, Gil Netter Fotografi...
Location of Crook County in Oregon This list presents the full set of buildings, structures, objects, sites, or districts designated on the National Register of Historic Places in Crook County, Oregon, and offers brief descriptive information about each of them. The National Register recognizes places of national, state, or local historic significance across the United States.[1] Out of over 90,000 National Register sites nationwide,[2] Oregon is home to over 2,000,[3]...
Questa voce sull'argomento calciatori honduregni è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Melvin ValladaresNazionalità Honduras Altezza180 cm Peso79 kg Calcio RuoloCentrocampista Termine carriera2017 CarrieraSquadre di club1 2003-2006 Municipal Valencia? (?)2006-2010 Real España62 (7)2010-2011 Guerreros Hermosillo14 (2)2011 Dorados11 (1)2012-2013 Motagua38 (7)2014 ...
Village in New York, United StatesNorthport, New YorkVillageIncorporated Village of NorthportMain Street in Northport, just east of Woodbine and Bayview AvenuesLocation within Suffolk CountyNorthport, New YorkLocation on Long IslandShow map of Long IslandNorthport, New YorkLocation within the state of New YorkShow map of New YorkCoordinates: 40°54′10″N 73°20′39″W / 40.90278°N 73.34417°W / 40.90278; -73.34417Country United StatesState New YorkCoun...
Para la localidad portuguesa, véase Meca (Alenquer). La Mecaمكة المكرمةMakkah al-Mukarramaالعاصمة المقدسةLa santa capital Ciudad En el sentido de las agujas del reloj: Monte Yabal al-Nur; la Kaaba, vista de La Meca, Mina y el Puente Jamaraat. Otros nombres: Umm al-Qura La MecaLocalización de La Meca en Arabia Saudita La MecaLocalización de La Meca en AsiaCoordenadas 21°25′21″N 39°49′34″E / 21.4225, 39.826111111111Entidad Ciudad • Pa...