The bridge is owned and maintained by The Company of Proprietors of Whitchurch Bridge, who are themselves owned by the General Estates Company, who also own Bathampton Toll Bridge across the River Avon to the east of Bath.[4] Tolls currently range from 60p for cars to £4 for vehicles of over 3.5 tonnes. Pedestrians, cyclists and motorcycles cross for free. A pre-paid multiple-use Bridge Card can be bought that provides cost savings on tolls.[citation needed]
The Thames Path crosses the river on Whitchurch Bridge. In the downstream (easterly) direction the path passes along the southern bank of the Thames through Pangbourne Meadow. In the upstream (westerly) direction it takes a more inland route through Hartslock on the north side of the river.[5]
History
A bridge has stood here since 1792 when it replaced a ferry.[6] The structure was renewed in 1852–3, 1902 and most recently in 2014. The original charges ranged from a halfpenny (1⁄480 of a pound) per pedestrian, sheep, lamb, boar, sow or pig to twopence for each wheel of a vehicle and twopence for the drawing animal (though one and a half if an ass), so a 1⁄24 of a pound for a horse-drawn four-wheeled vehicle (equivalent to £6 in 2023).[6][7] Horses and persons using the lock for barge hauling were exempt.[7]
An Act for building a Bridge, at or near the Ferry over the River Thames, from Whitchurch in the County of Oxford, to the opposite Shore in the Parish of Pangbourn, in the County of Berks.
An Act to modify the Transport Charges &c. (Miscellaneous Provisions) Act 1954 in its application to the bridge undertaking of the Company of Proprietors of Whitchurch Bridge; to confer other powers on the proprietors and to amend or repeal certain of the local statutory provisions applicable to them; and for other purposes.
The Company of Proprietors of Whitchurch Bridge was promoted by a consortium of ten subscribers, and was authorised by the Whitchurch Bridge Act 1792 (32 Geo. 3. c. 97). Under this act, and the Whitchurch Bridge Act 1988, it has a duty to maintain the bridge "forever in good and sufficient repair" and to replace it if it becomes unsafe.[6] In November 2008 the owners' predicted a renewal was vital within a decade and so announced application to the Department for Transport to double the toll for cars to 40p.[8] This met with more local opposition than registered support.[8][9] A public inquiry was held in June 2009 and the toll increase was approved in October 2009; the new toll came into force on 26 October 2009.[10]
From October 2013 a complete reconstruction took place, with new and stronger piling and steel spans. The white lattice iron girders of the 1902 structure were refurbished and incorporated in the design. The contractor was Balfour Beatty, the designer Atkins and the project manager Oxfordshire County Council. During reconstruction the bridge was closed to vehicles, but a temporary footbridge was provided. The project was delayed for several months by exceptional flood flows in the Thames and the new bridge was finally opened on 19 September 2014. A blessing ceremony was conducted five days later by the Bishop of Oxford, during which a 1902 De Dion-Bouton was driven across the bridge, carrying Bridge Company directors and a descendant of one of the original bridge promoters of 1792.[6]
As a result of the delays and consequent overspend on the reconstruction, the company proposed a further toll increase and a public enquiry was held on 19 May 2015. It considered 293 written objections but approved the request to increase tolls to 60p for cars and £4 for vehicles weighing more than 3.5 tonnes, on 12 August. In 2019 it was announced that the Company of Proprietors of Whitchurch Bridge had been sold to the General Estates Company, who previously held a minority stake in the company since the late 1920s.[4][11]