The Suncor Energy Centre,[5] formerly the Petro-Canada Centre, is a 181,000-square-metre (1,950,000 sq ft) project composed of two granite and reflective glass-clad office towers of 32 floors and 52 floors, in the office core of downtown Calgary, Alberta. The Council on Tall Buildings and Urban Habitat lists the west tower (215 m or 705 ft as measured to top of the structure), as the 23rd tallest building in Canada and the 6th tallest skyscraper outside of Toronto, as of 2023[update].[2] The west tower overtook the Calgary Tower as the tallest free-standing structure in Calgary from its completion in 1984, until being surpassed by the neighbouring Bow in 2010.[6] The office towers encompass 158,000 m2 (1,700,000 sq ft) of rentable office space with the complex also containing 23,000 m2 (250,000 sq ft) of retail and underground parking area. A glass-enclosed walkway (part of the +15 System) provides shelter and easy access to the surrounding buildings.
Planning for the complex began in the late-1970s following the creation of Petro-Canada. Petro-Canada came to an agreement with the West German firm ARCI Inc. to jointly develop an ARCI-owned site in Calgary to host the Crown Corporation's new headquarters.[1] ARCI Inc served as an investment corporation, which had purchased the site several years early, and continues to be owned by the German House of Arenberg.[1] In May 1980, a $200-million design was proposed with an all-glass, three-tower design including a 25-storey tower to be completed in 1982 and a larger 50-storey tower completed later in 1983.[10] The Calgary Planning Commission rejected the proposal in Fall 1980 as the site was not large enough for the density three towers would provide, and the all-glass design was not desirable for the city. Subsequently, Petro-Canada purchased the air rights from the neighbouring Calgary Chamber of Commerce for $2.5 million and received approval for a granite-clad two-tower design with a density bonus option of four storeys on the smaller tower.[1]
Construction on the complex began on April 2, 1982.[1] During construction, local controversy arose when no Canadian bids were received to supply the site with exterior granite cladding, which resulted in the use of $500,000 of Finnish granite, which was cut and polished in Italy and shipped to the Calgary site for installation.[1] Another local controversy was the installation of bilingual signage (French and English), which Petro-Canada head office insisted upon.[1] On January 4, 1983, the West tower reached 191 metres in height, exceeding the Calgary Tower and becoming the tallest freestanding structure in Calgary and Western Canada.[11] The 52-storey west tower was topped off on May 26, 1983,[12] and the complex was completed in 1984.[1]
During construction in April 1983, one of the site's tower cranes collapsed, killing its operator.[13][14]
In December 1998, Petro-Canada sold their remaining half interest in the complex to Gentra Inc. (former subsidiary of Brookfield Properties) for $200 million (equivalent to $344 million in 2023), which included Petro-Canada signing a 15-year lease to remain in the towers.[15]
^Smith, Donald B. (2005). Calgary's Grand Story: The Making of a Prairie Metropolis from the Viewpoint of Two Heritage Buildings. Calgary, AB: University of Calgary Press. p. 282. ISBN9781552381748.