The SRT Dark Red Line (also referred to as Thani Ratthaya Line (Thai: รถไฟชานเมือง สายธานีรัถยา)), is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26 km (16 mi) between Krung Thep Aphiwat and Rangsit.
In mid-November 2020, the Minister of Transport announced that free trial operations would operate from March 2021 with full-service operations expected from November 2021.[4] In late February 2021, the SRT confirmed that free trial operations will commence on 26 March 2021 with full commercial operations starting on 28 July 2021.[5] However, in July 2021 the SRT again postponed the free trial operations until 2 August 2021.[6]
The line finally opened for trial operations on 2 August 2021. Full commercial services began on 29 November 2021.[7]
A much delayed 8.84 km (5.49 mi) extension of the line from Rangsit to Thammasat University was due to be tendered in June 2022.[8] However, this was later delayed to December 2022 and then until February 2023. With the 14 May 2023 national elections and the ongoing delays in the formation of a new government, it is unlikely that the tenders will be issued until late 2023. In late June, a MOT source expressed that the extension is likely be taken to Cabinet for approval in October 2023 and if approved, a tender could be issued in the first quarter of 2024.[9]
In 2004, in conjunction with OTP, the SRT began formulating plans for a new, modern suburban network in Bangkok along existing SRT alignments to replace the existing, limited services. On 7 November 2006, the Thai Cabinet passed a resolution to approve the framework of the new network with the SRT Light Red line being DMU operations while the SRT Dark Red Light would be EMU.[10] At the time, it was expected that the full line could be completed within 15–20 years. In February 2009, the Thai government secured a 24 billion baht (US$685 million) loan from the Japanese Government for the initial segment of the 87 km (54 mi) line.[11][12] The first Phase from Bang Sue to Rangsit was approved in 2010 but delayed due to a complicated 2.5 year contractual dispute.
The 26 km (16 mi), 10 station Rangsit to Bang Sue section finally started construction in May 2013 after new contracts were signed in January 2013.[13] A construction period of 3 years was stated. By the end of 2013, the project was only 3% done & already months behind schedule due to delays in removing the Hopewell Pillars.[14] In June 2014, the SRT requested an additional 8.14 billion baht to modify the Dark Red line to 4 tracks instead of 3, to accordingly redesign all stations and to provide for the longer platforms for the Bang Sue Grand Station to cater for future HSR lines.[15] The 8.14 billion baht requested composed of 4.32 billion baht for Contract 1 (modifications to Bang Sue Grand Station to cater for High Speed trains); 3.35 billion Baht for Contract 2 (4th track and stations redesign) and an extra 473 million baht for rolling stock (Contract 3).
The budget for the 1st Phase of the Dark Red Line project progressively increased due to numerous delays and further redesigns of the project. From an initial estimated 59.89 billion baht in 2007, to 75.55 billion baht in 2009 and to 80.38 billion baht in 2012. An additional requested 8.14 billion baht to increase the number of tracks increased the final budget to 88.52 billion baht.
Construction: Bang Sue to Rangsit
The 26 km (16 mi), 10 station Bang Sue to Rangsit section finally started construction in May 2013 with a scheduled construction period of just over 3 years to be completed by the end of 2016. Construction works were delayed by 2 months due to site access issues for the contractor and delays related to removing slum dwellers residing within the right of way. However, it was hoped that the use of some of the old Hopewell pillars would speed up the initial construction timetable.[16] By the end of 2013, the project was only 3% done & already months behind schedule due to a longer timetable in removing the Hopewell Pillars.[14]
In June 2014, the SRT requested an additional 8.14 billion baht to modify the Dark Red line to 4 tracks instead of 3.Aaccordingly, redesign all stations and to provide for the longer platforms for the Bang Sue Terminal to cater for future HSR lines.[15] 8.140 billion baht request is; 4.32 billion baht for Contract 1 (modifications to Bang Sue Grand Station to cater for High Speed trains); 3.35 billion Baht for Contract 2 (4th track and stations redesign) and 473 million baht for Contract 3.
In September 2017, civil works progress was stated to be 88.63%.[17] By the end of September 2019 civil works were almost fully complete at 99.56% and Electrical and Signalling installation was at 45.60%.[18] By July 2020, S&E installation was at 85.12% completion.[19] By October 2020, 90% of the power supply for the line had been installed by the Metropolitan Electricity Authority (MEA) with all installation due for completion by November 2020.[20]
Krung Thep Aphiwat Central Terminal (Bangkok's new Intercity terminal station)
Contract 1 of the project was for the construction of a new, 4 level Intercity Terminal to cater for all SRT Intercity Trains, SRT Red Line suburban trains and the yet to be built Airport Rail Link (Bangkok) extension. The delayed contract process was finally signed in January 2013.[21] In August 2013, the SRT sought extra funds for the project to be redesigned in order to extend upper level platforms to a 400–600 m length in order to accommodate the future planned High Speed lines.[22] (Funding was finally requested in June 2014 - see above section)
In March 2013, the new Bang Sue Grand Station started construction. Between March and June, excavation works for the foundation of the Terminal were delayed by the unearthing of numerous World War II unexploded bombs which required safe removal by the Thai army Explosive Ordnance Teams.[23][24][25] In July 2014, construction was 10% behind schedule.
The new station was originally scheduled to open by end of 2016 but the above-mentioned redesign work and other delays resulted in an expected 2020 opening date. In September 2017, construction progress of the station civil works was at 57.50%.[17] By the end of September 2019 civil works were at 86.01%.[18] By July 2020, civil works were almost complete at 99.8%.[26]
Rolling stock
The 3rd contract for the Dark Red Line was for electrical and systems (E&S) and procuring EMU rolling stock. An overhead catenary electrical system with 25 kV 50 Hz AC was specified. In April 2014, only 2 bidders remained but one of the bidding consortiums was disqualified on due to the fact that one of the consortium members (Maru Beni Corp) had convictions for bribery in an Indonesian bidding process.[14]
This left MHSC Consortium (Mitsubishi and Hitachi and Sumitomo) as the sole bidder qualified for the contract. However, their bid of 28,899 million Baht was above the SRT median price of 26 billion baht which was set in 2010. The MHSC Consortium argued that their bid reflects 2013 prices after the minimum wage increase of January 2012. Finally in July 2014, after a prolonged 2-year delay in the bidding process, JICA approved the loan for Contract 3.[27] However, the coup of May 2014 delayed finalization leading to further review and negotiations. By mid 2016, negotiations had concluded and Hitachi promised that all rolling stock for the Dark Red line would be delivered by 2020.[28] The contract specifies 25 EMUs consisting of ten 4 car sets and fifteen 6 car sets for 130 cars in total.
In late September 2019, the first 2 sets of rolling stock were shipped from Japan[29] and both arrived in Thailand at Laem Chabang port on 12 October 2019 for shipment to Bangkok.[30] By March 2020, 5 sets had been delivered.[31]
As of July 2020, 13 sets - 7 of the 6 car sets and 6 of the 4 car sets - of the total 25 sets of rolling stock had been delivered with a further 2 sets due to be delivered by August 2020.[19] By the end of September 2020, 21 sets had been delivered - 13 of the 6 car sets and 8 of the 4 car sets - with the final 4 sets to be delivered in October.[32]
Operation
Services operate between 5:30am to 12am. Headways are every 20 minutes except for the peak periods (7am to 9am and 5pm to 7pm) where services depart every 12 minutes.
The Line has a flat fare of 20 Baht. The SRT also offers a 30 day integrated Transit Pass which can be used for 50 trips and for travel on all BMTA buses.
Ridership
On the first full day of free trial operations on 3 August 2021 total passengers numbered 2914, on 4 August 2856 passengers used the line.[33] By the end of September, this had increased to around 4,500-5000 passengers a day.[34] For the first 10 months of operations to September 2022 both Red lines carried over 3.2 million passengers and services ran on time 99.45% of the time according to the SRT.[35] By the end of September 2022, the line averaged only 309,000 passengers a month.[36] By January 2023, the average number daily passengers rose to around 22,000 to 23,000 on weekedays.[37] At the end of April 2023, daily weekday passengers were 4000 for Don Mueang station and 2500 for Rangsit station.[38]
Future extensions
In July 2016, the Thai Cabinet approved the first section of the southern extension from Bang Sue to Hua Lamphong. However, the 10 km (6.2 mi) 4 station northern extension from Rangsit to Thammasat University will be built first and was originally expected to be tendered by September 2018.[39] This was delayed and then due to be tendered in the 2nd half of 2019.[40] However, the tender has yet again been further delayed until 2021 as the Transport Minister has requested that the new Department of Railways investigate conducting PPP tenders for this extension.[41] The decision to change the extensions to PPP projects and tender out the operation of the line with a 50 year concession was opposed by the SRT and SRT union. On 10 February 2021, the Department of Railways announced that in April 2021 the SRT would issue the tenders for the north extension to Thammasat University and the south extension to Hua Lamphong station.[42] However, the PPP tender process was subject to further review.
In October 2021, the SRT announced that the PPP tenders would not be released until June 2022 with the aim to sign contracts for the extensions (with 50 year leases) in July 2023.[8] However, this was delayed yet again to an initial October 2022 tender release[43] and later a December 2022 date.[44] In late October 2022, the SRT again delayed the tender time frame to February 2023 with an aim to sign contracts by May 2023 but the time frame was contingent on new Cabinet approval of an updated budget for the extension.[45] At the same time, the SRT decided to defer the bidding for the 50 year operation concession and new EMUs to December 2024. Once the concession is contracted the SRTET will cease to operate the line.
With the 14 May 2023 national elections and the expected time frame in the formation of a new government, it is unlikely that the tenders will be issued until late 2023. In late June, a MOT source expressed that the extension is likely be taken to Cabinet in October 2023 for approval of a new budget of 6.5 billion baht to build the extension. If approved, a tender could be issued in the first quarter of 2024.[9]
The 8.84 km (5.49 mi), 4 station extension was approved by Cabinet in 2016 with an expected tender by September 2018.[39] The extension to Thammasat University was then to be tendered in the 2nd half of 2019.[40] However, the tender was further been delayed until 2021 as the transport minister requested that the new Department of Railways investigate conducting PPP tenders for the extension.[41]
Phase III Bang Sue–Hua Lamphong
The 11.0 km (6.84 mi), 7-station southern extension to Hua Lumphong station was approved by Cabinet in 2016. However, the northern extension to Thammasat University will be built before this section.[39]
Phase IV & V Hua Lamphong–Bang Bon–Maha Chai
The last section of the line will run 39.0 km (24.23 mi) southeast from Hua Lumphong to Maha Chai in Samut Sakhon Province via Wong Wian Yai along the current Maha Chai railway alignment.
Potential extension Maha Chai–Ratchaburi
The Office of Transport and Traffic Policy and Planning (OTP) have studied the improvement and construction of the Mae Klong railway line[47] which will be constructed through Samut Sakhon, Samut Songkhram and Ratchaburi provinces. It will use a bypass route in Samut Sakhon Province by deviating from the original train line for about 31 km (19 mi). Between Ban Khom railway station and Khlong Chak railway station, the line will be elevated across Ekachai road and deviate along the route of Rama II Road around the km 26 + 800 to the 32 + 160 km, then divert to the left to go straight to connect with the original train line.
From Samut Songkhram the suggested route will be constructed across the Mae Klong River. A third option is expected to be in use, which is to bypass Samut Songkhram city by diverging from the original train line about 66 km after passing Bang Kraboon railway station, which will be an elevated railway along the National Highway No. 325 to cross the Mae Klong Canal and Highway 325 at the intersection to Damnoen Saduak District, approximately 40 + 850 km and crossing the Mae Klong River. It will then revert to ground level and end at Pak Tho railway station, Ratchaburi which will build a train parallel with the royal highway number 3093 and will have 3 more new railway stations in this section. Expected total value of this project is approximately 42,243 million baht.[48]
When completed, it will be a new southern railway line, which will help shorten the original train route, which originally runs through Nakhon Pathom and Ratchaburi before going to Pak Tho Station. The new Southern Railway will reduce the distance by about 43 kilometers and the aim of the project also includes the development of the Southwest Transport Center. However, as of 2016 this planned southern extension is very unlikely to be built as when Cabinet approved the northern extension to Thammasat University and the Southern extension to Hua Lumphong, only the original project scope to Maha Chai was referenced.
List of stations
Currently, services operate as all stops. Express trains will likely enter operation after additional phases are completed.
The Port Macquarie News and Hastings River Advocate, 7 January 1899 The Port Macquarie News and Hastings River Advocate was a weekly English language newspaper published in Port Macquarie, New South Wales, Australia. History First printed and published on 8 July 1882 by Alfred Edward Pountney,[1] it was published from 1882 to 1950.[2] The paper was circulated in the Bellinger, Nambucca, Macleay, Wilson, Camden Haven, and Manning Rivers, and throughout the whole of the Port Ma...
Pour les articles homonymes, voir SV. Sievert Informations Système Unités dérivées du Système international Unité de… Dose équivalente, dose efficace Symbole Sv Éponyme Rolf Sievert Conversions 1 Sv en... est égal à... Unités SI 1 m2 s−2 (à un facteur multiplicatif près) 1 J kg−1 (à un facteur près) modifier Le sievert (de symbole Sv) est une unité utilisée pour évaluer l'im...
لمعانٍ أخرى، طالع أحمد ياسين (توضيح). فضيلة الشيخ أحمد ياسين معلومات شخصية اسم الولادة أحمد إسماعيل ياسين الميلاد 28 يونيو 1936(1936-06-28)عسقلان الوفاة 22 مارس 2004 (67 سنة)غزة سبب الوفاة اغتاله جيش الاحتلال الإسرائيلي بطائرة أباتشي الجنسية فلسطين أسماء أخرى أحمد سعدة ال�...
OTAN vs.Pacte de Varsovie Chars M48 Patton de la 7e armée des États-Unis face aux T-55 de l'Armée de terre soviétique à Checkpoint Charlie, Berlin, en octobre 1961. Informations générales Date 1955 à 1991 Lieu Europe Issue Chute des régimes communistes en Europe entraînant la dissolution du pacte de Varsovie Belligérants Pays membres de l'OTAN[1],[2] Pays membres du pacte de Varsovie[3],[4] Forces en présence États-Unis (en Europe) : 326 400 RFA : 494 300 Gde...
Indian cinematographer This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This biography of a living person needs additional citations for verification. Please help by adding reliable sources. Contentious material about living persons that is unsourced or poorly sourced must be removed immediately from the article and its talk page, especially if potentially libelous.Find sources: Abina...
Puteri Indonesia Kalimantan UtaraLogo Puteri IndonesiaSingkatanPuteri Indonesia KaltaraPI KaltaraDinamai berdasarkanPuteri Indonesia RegionalTanggal pendirian2016; 8 tahun lalu (2016)Didirikan diKota Tarakan, Kalimantan Utara, IndonesiaTipeKontes Kecantikan RegionalKantor pusatKota Tarakan, IndonesiaLokasi IndonesiaJumlah anggota Puteri IndonesiaBahasa resmi Bahasa IndonesiaBahasa InggrisPresiden dan CEO Puteri IndonesiaMooryati SoedibyoKetua Puteri IndonesiaPutri KuswisnuwardhaniOr...
For the waterfall on Ellicott Creek, Williamsville, see Glen Falls (New York). City in New York, United StatesGlens FallsCityCentennial Circle, a five-leg roundabout in downtown Glens FallsNickname(s): Hometown U.S.A., Empire CityLocation of Glens Falls in Warren CountyGlens FallsLocation in New York (state)Show map of New YorkGlens FallsLocation within the United StatesShow map of the United StatesCoordinates: 43°18′44″N 73°38′54″W / 43.31222°N 73.64833°W...
Athens Metro station Αγία ΜαρίναAgia MarinaThe station's platforms in February 2023General informationLocationIera Odos and Agias Marinas streetAgia VarvaraGreeceCoordinates37°59′49″N 23°40′04″E / 37.99694°N 23.66778°E / 37.99694; 23.66778Managed bySTASYLine(s)Platforms2Tracks2ConstructionStructure typeUndergroundParkingYesBicycle facilitiesYesAccessibleYesHistoryPrevious namesChaidariKey dates14 December 2013Opened[1]Services Preceding st...
Linux distribution Gentoo LinuxGentoo LogoGentoo Linux Live USB running KDEDeveloperGentoo FoundationWritten inC, sh, and PythonOS familyLinux (Unix-like)Working stateCurrentSource modelOpen sourceInitial release31 March 2002; 22 years ago (2002-03-31)[1][2]Repositorygitweb.gentoo.org/repo/gentoo.git Update methodRolling releasePackage managerPortagePlatformsIA-32, x86-64, IA-64, PA-RISC (HPPA), PowerPC 32/64, SPARC 64-bit, DEC Alpha, ARM 32/64, MIPSKernel ty...
Neighborhood in Kōtō, Tokyo, Japan Toyosu as seen from Harumi Ohashi Toyosu (豊洲) is neighborhood in Kōtō, Tokyo. Toyosu has six numbered chome (blocks). It is the location of the wholesale Toyosu Market, which took the role of the Tsukiji fish market after it became solely a tourist attraction.[1][2][3][4][5] Located in Tsukiji in central Tokyo between the Sumida River and the upmarket Ginza shopping district, the wholesale market is open to the...
New Zealand politician (born 1977) Paul Foster-BellFoster-BellMember of the New Zealand Parliamentfor National party listIn office21 May 2013 (2013-05-21) – 23 September 2017 (2017-09-23)Preceded byJackie Blue[n 1] Personal detailsBornMarch 1977 (age 47)Whangarei, New ZealandPolitical partyNational PartyResidenceDunedinAlma materUniversity of OtagoOccupationMember of ParliamentCommitteesMember, Local Government and Environment Committ...
For the 1981 album by Franco Battiato, see La voce del padrone (album). This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: La voce del padrone – news · newspapers · books · scholar · JSTOR (February 2024) (Learn how and when to remove this message) Image of a 78rpm of an aria from Giuseppe Verdi's Ernani, recor...
منتخب لوكسمبورغ تحت 19 سنة لكرة القدم معلومات عامة بلد الرياضة لوكسمبورغ الفئة كرة قدم للرجال تحت 19 سنة [لغات أخرى] رمز الفيفا LUX الاتحاد اتحاد لوكسمبورغ لكرة القدم(Fédération Luxembourgeoisede Football) كونفدرالية الاتحاد الأوروبي لكرة القدم (أوروبا) الطاقم واللاعبون ا�...
For black people in Europe, see Black Europeans. Individuals residing in Europe who were born in Africa African immigrants in Europe are individuals residing in Europe who were born in Africa. This includes both individuals born in North Africa and Sub-Saharan Africa. History The Roman Emperor Septimius Severus was born in Leptis Magna in North Africa, in what is now modern-day Tripolitania, Libya. Some North Africans moved to Britain during Roman rule.[1][2] Six White British...
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.Find sources: Waterford High School Ohio – news · newspapers · books · scholar · JSTOR (April 2015) (Ohio) public, rural, high school in the United StatesWaterford High SchoolLocationP.O. Box 67, 330 Main Street, Waterford, Ohio 45786United StatesCoordinates39...
Artikel atau sebagian dari artikel ini mungkin diterjemahkan dari Charles VII of France di en.wikipedia.org. Isinya masih belum akurat, karena bagian yang diterjemahkan masih perlu diperhalus dan disempurnakan. Jika Anda menguasai bahasa aslinya, harap pertimbangkan untuk menelusuri referensinya dan menyempurnakan terjemahan ini. Anda juga dapat ikut bergotong royong pada ProyekWiki Perbaikan Terjemahan. (Pesan ini dapat dihapus jika terjemahan dirasa sudah cukup tepat. Lihat pula: panduan pe...
You can help expand this article with text translated from the corresponding article in Russian. (January 2013) Click [show] for important translation instructions. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia. Do not translate text that appears unreliable or l...
Танзанит Танзанит после огранки Формула Ca2Al3(SiO4)(Si2O7)O(OH) Физические свойства Цвет Сапфирово-синий до аметистово-фиолетового Цвет черты Белая Блеск Стеклянный Прозрачность Прозрачен Твёрдость 6,5 - 7 Спайность Совершенная Излом Неровный. Хрупок Плотность 3,35 г/см³ Кристалло�...