Rawang Bypass

Federal Route 37 shield}}
Federal Route 37
Rawang Bypass
Jalan Pintasan Rawang
Route 37 East 3.jpg
Route information
Length10.662 km (6.625 mi)
Existed2005–present
HistoryCompleted in 2017[1]
Major junctions
North endSerendah South interchange
Major intersections FT 1 Federal Route 1
FT 1 Kuala Lumpur–Rawang Highway
South endTaman Rimba Templer interchange
Location
CountryMalaysia
Primary
destinations
Kuala Kubu Bharu
Serendah
Batang Kali
Bandar Baru Selayang
Selayang
Batu Caves
Highway system

Rawang Bypass, Federal Route 37[2] also known as Rawang–Serendah Highway, is a federally-funded divided highway bypass in Rawang, Selangor, Malaysia. The 10-km highway was opened to traffic on 28 November 2017 at 9.00 pm. Construction of the RM628mil Rawang Bypass began on 16 July 2005 and was completed on 21 November 2017. It features a 2.7-km elevated viaduct with its highest pillar of 58.2 meters.[3][4]

The Rawang Bypass FT37 was built to solve the traffic congestion along the Malaysia Federal Route 1 in the town centre of Rawang. It was reported that the travelling time from Serendah to Selayang via the Kuala Lumpur–Ipoh Road FT1 may take up to 2 hours due to severe congestion in Rawang town centre.[1] The Rawang Bypass FT37 helps to reduce the travelling time to only 30 minutes.[3][1]

Background

FT37 enter sign at FT1

The Rawang Bypass FT37 is a 9-km divided highway that runs from Templer Park to Serendah. It continues from Kuala Lumpur–Rawang Highway FT1, where the FT1 highway is diverted to Rawang, before ascending uphill via a 2.7-km viaduct with the gradient of 5.8%.[5] The Rawang Bypass viaduct has its highest pillar at the height of 58.2 m, making it the second highest roadway viaduct in Malaysia.[3] The remaining 6.3-km section is built at ground level. The Rawang Bypass FT37 ends at Kuala Lumpur—Ipoh Road FT1 near Serendah via a trumpet interchange.[5]

Along the FT37 highway, only two interchanges exist, with about three stub LILO intersections and a fast lane-to-fast lane U-turn near its northern terminus for southbound traffic.[5]

History

Rawang Bypass

The Rawang Bypass FT37 project is a revival of the Kuala Lumpur Arah Serendah Expressway (KLAS), also known as the Kuala Lumpur–Rawang Expressway, which was scrapped due to the effect of the 1997 Asian financial crisis.[5] The project was initially supposed to be constructed as a controlled-access expressway that would run along the Federal Route 1 corridor, with LeKLAS Sdn. Bhd. being appointed as its concessionaire and constructor.[6]

The project was revived by the federal government in 2005 as the Rawang Bypass project due to severe traffic congestion in Rawang.[1] However, the Rawang Bypass project was constructed not as a controlled-access toll expressway but rather as a limited-access divided highway. The contract of the RM628 million highway construction job was awarded to Syarikat Panzana Enterprise Sdn. Bhd.[5] Construction of the Rawang Bypass FT37 commenced on 16 July 2005.[1]

Construction of the Rawang Bypass project was divided into two stages. The first stage was to upgrade the existing the 12.5-km two-lane Kuala Lumpur–Ipoh Road FT1 from Bandar Baru Selayang to Templer Park into a divided highway known as the Kuala Lumpur–Rawang Highway FT1, completed in 2007.[5] The second stage was to build a completely new bypass route that diverts the through traffic away from the town centre of Rawang.[citation needed]

Environmental issue

The construction of the second stage took a longer time due to environmental concern towards the project. Initially, the planned route was longer, would be built completely on ground level and might run through the Selangor State Heritage Park and Templer Park.[5] Due to protests from environmentalists and pressure from local residents who insisted on going ahead with the project despite possible environmental issues, the route was realigned and redesigned, and a 2.7-km viaduct was constructed along the border of the Selangor State Heritage Park to minimize the negative impact towards the critically endangered Giam Kanching trees which is an endemic species and can only be found nowhere else but in the heritage park.[7][8][9] Through the viaduct construction approach, the affected forest area was reduced from 65 hectares to only 24 hectares.[1] The Rawang Bypass FT37 was completed on 21 November 2017, after 12 years of construction.[3]

Due to the very long construction period, a hoax claiming the opening ceremony of the Rawang Bypass FT37 to be held on 15 November 2017 went viral through social media on 13 November 2017, which was denied by the Malaysian Public Works Department.[10] Instead, the actual opening ceremony was held on 28 November 2017.[1][3][5]

List of interchanges

km Exit Interchange To Remarks
Serendah South Interchange North
FT 1 Tanjung Malim
FT 1 Kuala Kubu Bharu
FT 1 Serendah

South
FT 1 Rawang
FT 3029 Bestari Jaya (Batang Berjuntai)
FT 3208 Bukit Beruntung
North–South Expressway Northern Route AH2 North–South Expressway Northern Route
Ipoh
Kuala Lumpur
Klang
Trumpet interchange
FT 37 Rawang Bypass/Kuala Lumpur Arah Serendah Expressway (KLAS)
Start/end of highway
U-turn FT 1 Rawang
FT 1 Serendah
FT 1 Sg. Choh
Southbound direction only
Taman Rimba Templer viaduct Start/end of viaduct
Taman Rimba Templer viaduct
Taman Rimba Templer viaduct
Taman Rimba Templer viaduct Start/end of viaduct
FT 37 Rawang Bypass/Kuala Lumpur Arah Serendah Expressway (KLAS)
Start/end of highway
FT 1 Kuala Lumpur–Rawang Highway
Taman Rimba Templer interchange FT 1 Kuala Lumpur–Rawang Highway

North (U-Turn (1 km))
FT 1 Rawang
Kuala Lumpur–Kuala Selangor Expressway Kuala Lumpur–Kuala Selangor Expressway (LATAR)
FT 54 Kuala Selangor
FT 5 Lumut
Guthrie Corridor Expressway Shah Alam
North–South Expressway Northern Route AH141 Klang
North–South Expressway Northern Route AH2 Ipoh

South
FT 1 Kuala Lumpur
FT 1 Batu Caves
FT 1 Selayang
From/to south only

References

  1. ^ a b c d e f g "Jalan pintas Rawang dibuka". Utusan Malaysia (in Malay). 28 November 2017. {{cite web}}: Missing or empty |url= (help)
  2. ^ http://www.federalgazette.agc.gov.my/outputp/pua_20171124_P.U.%20(A)%20359.pdf[permanent dead link] [bare URL PDF]
  3. ^ a b c d e "Rawang Bypass opens to traffic - Nation - The Star Online". www.thestar.com.my.
  4. ^ "The Rawang Bypass Will Officially Open on 29 November, Here Are 7 Cool Facts About It - WORLD OF BUZZ". www.worldofbuzz.com. 28 November 2017.
  5. ^ a b c d e f g h "Jalan Pintasan Rawang FT37 membelah awan" (in Malay). Blog Jalan Raya Malaysia. 29 November 2017. Retrieved 29 November 2017.
  6. ^ "Senarai nama mereka yang memperolehi projek penswastaan". Utusan Malaysia (in Malay). 21 June 1998. Retrieved 11 September 2015.
  7. ^ Media Statement of the opening of Rawang Bypass - from the Malaysian Ministry of Works. Accessed on 29 November 2017.
  8. ^ "Hopea subalata". Mybis.gov.my. Retrieved 20 January 2021.
  9. ^ "Rawang Bypass". Constructionplusasia.com. March 2018. Retrieved 20 January 2021.
  10. ^ Ahmad Shazwan Md. Yusof (13 November 2017). "JKR nafi pembukaan Jalan Pintas Rawang". Utusan Malaysia (in Malay). Retrieved 29 November 2017.

See also