The rebuilds included new cabs, Dash 2 electronics, ZTR traction control equipment, EMD 645E engines from 1502s and the replacement of the roots blower supercharger with a turbocharger.[2] They were also ballasted to 110 tonnes (110 long tons; 120 short tons) as they only operate on heavy coal trains.