The Lower Thames Crossing is a proposed road crossing of the Thames estuary downstream of the Dartford Crossing that links the counties of Kent and Essex, and its proposed approaches. If built it would pass through the districts of Thurrock and Gravesham, supplementing the Dartford route. The approximately 14.3-mile (23.0 km) route is being assessed by the Planning Inspectorate.[1]
First proposed in the late 2000s, the crossing is designed to relieve the pressure on the existing A282 Dartford Crossing.[2] The proposed route would connect the M25 motorway and A13 north of the river to the M2 motorway south of the river.[3] If built, the crossing would have the longest road tunnel in the UK at 2.6 miles (4.2 km).[4] The road number A122 has been identified for the proposed road.[5]
The crossing is estimated to cost approximately £9 billion and would take about six years to build following the granting of planning permission.[6] A planning application was submitted in 2020, and withdrawn. A new planning application was submitted in November 2022; the planning process was expected to take 18 months,[1] but this was extended to 4 October 2024, due to the July 2024 general election.[7] A decision to further postpone a decision, to 23 May 2025, was announced on 7 October 2024.[8]
Background
Described as "a crucial part of the country’s strategic road network",[9] the Dartford Crossing is the only fixed road crossing of the River Thames east of Greater London. Although officially designated as the A282, the crossing is considered part of the M25 motorway orbital route around London. Last expanded in 1991 with the opening of the Queen Elizabeth II Bridge, the crossing is the busiest estuarial route in the United Kingdom, with an average daily use of around 160,000 vehicles.[10] The crossing has high levels of congestion, especially at peak times – with high levels of air pollution impacting neighbouring Thurrock and Dartford.[11] A variety of additional crossings downstream of the Dartford Crossing have been proposed.
Until 2024, there was a ferry service operating between Gravesend and Tilbury,[12] which predominantly carried foot passengers and bicycles, Monday to Saturday.[13]
History
An additional Thames crossing downstream from Dartford was first considered in the Roads for Prosperity white paper in 1989, noting that it would "[relieve the] east side of the M25 between Kent and Essex".[14]
The Lower Thames Crossing (LTC) was recommended for further investigation in the 2002 ORBIT Multi-Model Study, which examined orbital transport problems around London.[15][16]
In 2008, Metrotidal Ltd proposed the "Medway-Canvey Island crossing", a £2–4 billion combined road and rail tunnel between Medway and Canvey Island that would include a surge-tide barrier and a tidal power plant, which was supported by Kent County Council, Essex County Council, the Thames Gateway South Essex Partnership and the Department for Transport.[17] Following delays in any proposal being put forward by central government, Essex and Kent County Councils intend to create a joint proposal for the construction of a crossing.[18]
In January 2009, the Department for Transport published a study regarding potential ways to address capacity issues crossing the Thames. This included short term measures to improve the existing Dartford Crossing, as well as evaluation of future crossings in the long term.[19] The study considered five corridors that could provide a future crossing of the Thames, with options A, B and C to be investigated in further detail.[19]
Option A – Additional capacity at the existing Dartford Crossing
The study also identified a lack of demand for additional passenger rail or rail freight capacity to cross the river beyond projects already under construction/completed, noting the High Speed 1 and Crossrail projects would provide cross-river capacity between London and Kent.[19]
In October 2010, a study commissioned by Kent County Council proposed that the northern end of the crossing should bypass the M25 and continue on to connect to the M11 (and Stansted Airport) directly.[20] This would presumably be an adaptation of Option C.
In October 2012, plans were announced for the London Resort theme park near Swanscombe. Commenting on road and motorway access to the park, Kent County Council highways chief Councillor Brian Sweetland said that he was looking at a significant variation to Option B: "The possibility of a new Thames Crossing at the Swanscombe peninsula must now be taken very seriously".[21]
In April 2017, the Secretary of State for Transport Chris Grayling confirmed Option C as the preferred route for the Lower Thames Crossing.[22]
In November 2017, Highways England announced that its 'current thinking' for the design of the route encompassed a number of changes from that of the original public consultation: the route would now avoid a landfill site near Ockendon; the junction with the A13 would be redesigned and the junctions with the A128 and A226 would be removed. Furthermore, the A2 would be widened from its junction with the new crossing approach road to Junction 1 of the M2.[23]
In March 2018, Tim Jones in his position as LTC Project Director confirmed that the proposed LTC would not resolve all the problems both north and south of the river.[24]
In July 2019, Highways England said they expected to submit a planning application in summer 2020 and had a target for road opening of 2027.[25] On 26 October 2020, Highways England submitted a Development Consent Order (DCO) for the project.[26] However, it was withdrawn the following month after the planning inspectorate asked for more information regarding environmental impact and construction plans.[4]
Proposed routes 2009
In January 2009, the Department for Transport proposed three major options to increase capacity east of London over the River Thames to be built downstream of the existing Dartford Crossing and an additional proposal to increase capacity at the Dartford Crossing.[19]
Option A: Building an additional 1 mile (1.6 km) road crossing at the current Dartford Crossing (A282) in addition to the current two tunnels (north) and four-lane bridge (South).
Option A Route 14: Proposed tunnel (approximately 7 miles (11 km) in length between the end of the M25 in Essex to the beginning of the M25 in Kent – essentially completing the London Orbital Road). Area covering junctions 30, 31, 1 and 2.
Option B: A new road crossing in the Swanscombe Peninsula area, connecting the A2 near Dartford (south) to the A1089 road, north of Tilbury Docks. This option was dropped in 2013 because of the proposed London Resort.
Option C: A new road crossing connecting the M25 in Essex with the M2/A2 in the south, which might be linked via a proposed new Thames flood barrier. The route from the north would start at M25 between Junctions 29 and 30, and pass South Ockendon, Orsett, Chadwell St Mary and East Tilbury before it crossed the Thames just to the east of Thurrock and Gravesend. It would join the M2/A2 at Thong. Option C has several variations, three possible routes to the north of the river, known as Option C Routes 1, 2 and 3 respectively. To the south of the river, the two options are known as the Western and Eastern southern links.
There were three additional route options identified:
Following the first stage of location identification and appraisal, the 2009 study concluded that the three locations
(A, B and C) offered the greatest benefits in terms of relieving congestion at the
existing crossing and should be assessed further. Locations D and E were discounted due to either not meeting the traffic objective to relieve
congestion, or providing very limited relief at the existing Dartford Crossing, as well as poor to low value for money.
2020 proposals
Highways England issued revised proposals in 2020 based on the previous Option C. The proposed route would run from the M25 at North Ockendon to the A2 at Thong, including an intermediate junction with the A13 and A1089 roads. The route would be 14.3 miles (23 km) including 2.6 miles (4.3 km) in twin tunnels with three traffic lanes, and would be an all-purpose trunk road rather than a motorway.[27] Construction was expected to take six years.[28]
In April 2021, Highways England announced that they had split the construction of the road into three sections.[29][30] Two contractors would build the roads north and south of the tunnel, at a cost of £1.3 billion and £600 million respectively.[29] Another contractor would build the tunnel, at a cost of £2.3 billion.[30] This would allow construction of the project to begin immediately after the DCO process is completed.[29]
The crossing was slated to cost between £6.4 billion and £8.28 billion,[31] but investment in local roads is also likely to be necessary to deal with the predicted increases in traffic once the crossing opens.[32] The cost of the proposed LTC is currently more expensive per mile than the HS2 project which is currently predicted to cost £307 million per mile of track,[33] the LTC at current predicted costing would be nearly £573.5 million per mile.[34] In November 2022, it was announced that the expected cost had risen to £9 billion.[35]
Development Consent Order application (planning permission)
In October 2020, Highways England submitted their application for a Development Consent Order (DCO) for the proposed Lower Thames Crossing. After submission, the Planning Inspectorate requested details missing from the application, as well as more information on construction plans and the environmental impact of the scheme from Highways England.[36][37] In November 2020, Highways England were advised that the Planning Inspectorate would not accept the application.[38] Following this feedback, Highways England instead chose to withdraw the DCO application and carry out further work for a resubmission in 2021.[39] On 20 March 2021, the 120 day internal deadline was missed.[40] In summer 2022, a further local consultation took place,[41] with a new DCO application submitted in November 2022.[1] The DCO process is expected to take around 18 months, which will include public hearings.[1]
A decision on the Lower Thames Crossing was due on 20 June 2024, but this was delayed by six months because of the July 2024 general election.[42] A new planning application was submitted in November 2022; the planning process was expected to take 18 months,[1] but this was extended to 4 October 2024, due to the July 2024 general election.[43] A decision to further postpone a decision, to 23 May 2025, was announced on 7 October 2024.[8]
Construction
In January 2023, Balfour Beatty was announced as the contractor for the £1.2 billion Roads North of the Thames contract to construct 10 miles (16 km) of highways connecting the M25 at Junction 29 and the A13 with the northern side of the proposed tunnel.[44] In July 2023, Skanska was announced as the contractor for the £450 million Kent Roads contract to construct 3.7 miles (6.0 km) of roads connecting the A2/M2 to the southern side of the proposed tunnel.[45] In December 2023, a joint venture (JV) of Bouygues and J. Murphy & Sons was announced as the contractor for the £1.3 billion Tunnels and Approaches contract to construct the tunnel, tunnel systems and approach roads.[46] To save costs, the Bouygues-Murphy JV intends to use one tunnel boring machine for both tunnel bores, turning it around and reusing it.[46]
Subject to agreement on the DCO and 18 months of detailed design and pre-construction planning, construction work is estimated to take around 6 to 7 years.[47] In March 2023, it was announced that the planned completion date of 2029 had been pushed back by two years. At this point, £800 million had already been spent on the project.[48] As of December 2023[update], the target date for completion is 2032.[46]
Route
The proposed route involves a twin-bore tunnel crossing under the River Thames east of Gravesend and Tilbury, linked north of the river by a new road to the M25 between junctions 29 and 30 while south of the river the new road will directly join the A2 at Thong east of Gravesend.[49] It will run west of Shorne, not to the east, as a result of consultations.[50] The tunnel itself would be 4 km long and 16m in diameter, which would make it the largest and longest road tunnel in the UK.[30]
There would be three junctions: Orsett on the A13, Thong on the A2 and north-bound slip roads on the M25 at junction 29. Junctions have been removed on the A226 south of Chalk and on the A128 at Chadwell St Mary in Essex.[51]
Environmental impact
The Woodland Trust opposes the project and expects twelve ancient woodlands and fifteen veteran trees to be close to or within the development boundary. Some of these are within the Shorne and Ashenbank Woods, a Site of Special Scientific Interest. However, the Trust states that Highways England have not disclosed how many habitats will be affected by the project, and calls for them to release this information.[52] Highways England say that new trees will be planted to compensate for the lost ancient woodlands,[53] which "is not a direct replacement for lost or damaged trees or woodland".[54]
Essex Wildlife Trust is also opposed. The Trust acknowledges that a bored tunnel avoids direct impact on the wetlands and coastal habitats of the Thames estuary, but states that habitats will be destroyed at the site of the northern entrance to the tunnel. It states that the project will fragment habitats and the noise and light pollution it causes will reduce the remoteness and tranquility of the area. The Trust is also concerned that the project will increase car dependency and induce demand, and that as a result it will not decrease congestion and will lead to increased carbon dioxide emissions.[55]
Traffic modelling by Highways England predicts that constructing the Lower Thames Crossing would reduce the number of cars using the Dartford Tunnel. However, the total number of cars crossing the Thames (via the Lower Thames Crossing and the Dartford Tunnel) would increase.[56] In addition to this, modelling predicts that the Dartford Tunnel would still be operating above capacity.[57]
Mitigation
Highways England have stated that the road will be the "most environmentally sustainable road project delivered in the UK".[58] Proposed landscaping and mitigation includes planting over 260 hectares of woodland, converting farmland to new habitats and building green bridges across the road.[59][53]
Carbon dioxide emissions
Highways England initially refused to release emissions figures. However, in response to a freedom of information request in December 2020 it was revealed that construction of the Lower Thames Crossing is expected to release two million tonnes of carbon dioxide. A further 3.2 million tonnes would be emitted by traffic created by the road over sixty years of operation.[60] The Woodland Trust claims that the carbon emissions of the road scheme are expected to be amongst the highest of any major road scheme currently developed by National Highways.[61]
Perspectives
Supporters of the project include His Majesty’s Government, business groups, trade organisations and major transportation hubs such as the Port of Dover.[62][63] According to the Federation of Small Businesses, 83% of local businesses surveyed support the proposed crossing.[64] Some local authorities support the proposed crossing, despite expressing specific concerns regarding environmental impacts.[65][66]
Some campaign groups support the principle of a new crossing of the Thames, but not the chosen route. The Thames Crossing Action Group prefers new, longer tunnels at Dartford that would allow long-distance traffic on the M25 to bypass the existing Dartford Crossing.[67]
^Francis, Paul (15 July 2014). "Two Thames crossing options". Kent Messenger. Retrieved 15 July 2014. Transport Secretary Patrick McLoughlin said: "As part of the M25 orbital route around London, the Dartford Crossing is a crucial part of the country's strategic road network."
^"Dartford Crossing". Institution of Civil Engineers (ICE). 16 April 2018. Retrieved 8 April 2021.
^Arminas, David (1 April 2021). "More tenders for Lower Thames Crossing". World Highways. Retrieved 8 April 2021. The successful bidders and their supply chains will help make the Lower Thames Crossing the most environmentally sustainable road project ever delivered in the UK, according to Highways England.
Part of a series on theCulture of Qatar History People Languages Cuisine Festivals Public holidays Religion Art Collecting practices of the Al-Thani Family Public art in Qatar Literature Qatari folklore Music and Performing arts Media Radio Television Cinema Sport Monuments World Heritage Sites Symbols Flag Coat of arms National anthem vte Sport in Qatar is primarily centred on football in terms of participation and spectators. Additionally, athletics, basketball, handball, volleyball, camel...
Brussels Airlines S.A. IATA ICAO Kode panggil SN BEL BEE-LINE Didirikan7 November 2006Mulai beroperasi25 Maret 2007PenghubungBandara BruselProgram penumpang setiaMiles & MoreLounge bandaraBusiness CentreAliansiStar AllianceArmada39Tujuan121SloganYou're in good companyKantor pusatBandara Brusel, Diegem, Machelen, BelgiaTokoh utamaPeter Garber (CEO)Karyawan4.000Situs webwww.brusselsairlines.com Brussels Airlines merupakan maskapai penerbangan nasional Belgia yang berbasis di Bandar Udara In...
Gert Schutte Anggota Dewan Perwakilan (Belanda) untuk Liga Politik ReformasiMasa jabatan10 Juni 1981 – 13 Februari 2001Anggota Dewan Perwakilan untuk UniKristenMasa jabatan31 Januari 2000 – 13 Februari 2001Pemimpin kelompok parlementer - Liga Politik Reformasi Dewan PerwakilanMasa jabatan10 Juni 1981 – 13 Februari 2001 PendahuluBart VerbrughPenggantiEimert van Middelkoop Informasi pribadiLahirGerrit Jan Schutte(1939-05-24)24 Mei 1939Nieuwpoort, BelandaMeningga...
Часть серии статей о Холокосте Идеология и политика Расовая гигиена · Расовый антисемитизм · Нацистская расовая политика · Нюрнбергские расовые законы Шоа Лагеря смерти Белжец · Дахау · Майданек · Малый Тростенец · Маутхаузен ·&...
Cet article est une ébauche concernant un coureur cycliste espagnol. Vous pouvez partager vos connaissances en l’améliorant (comment ?). Pour plus d’informations, voyez le projet cyclisme. Pour les articles homonymes, voir Oscar Rodriguez et Rodríguez. Rodríguez Garaicoechea est un nom espagnol. Le premier nom de famille, paternel, est Rodríguez ; le second, maternel, souvent omis, est Garaicoechea. Óscar RodríguezÓscar Rodríguez lors du Tour de Romandie 2022Informatio...
Presiden Franklin D. Roosevelt dan Perdana Menteri Winston Churchill memancing di hotel Shangri-La, sekitar Mei 1943 selama konferensi Washington (Trident).[1] Konferensi Washington Ketiga (nama sandi Trident[2]), yang diadakan di Washington, D. C dari tanggal 12 Mei hingga 25 Mei 1943. Pertemuan strategis di antara para kepala pemerintahan Inggris dan Amerika Serikat. Konferensi ini adalah konferensi ketiga di Washington selama Perang Dunia II (tahun 1941, tahun 1942, 1943). ...
Animated television series WordGirlTitle cardAlso known asThe Amazing Colossal Adventures of WordGirlGenre Adventure Comedy Science fiction Educational Superhero Created byDorothea GillimDeveloped by Dorothea Gillim Jack D. Ferraiolo Directed byDavid SanAngeloSteve YoungVoices of Dannah Phirman Feinglass Tom Kenny Maria Bamford Cree Summer Patton Oswalt Fred Stoller H. Jon Benjamin Larry Murphy James Adomian Grey DeLisle Jeffrey Tambor John C. McGinley Narrated by Chris Parnell Rodger Parsons...
Запрос «Пугачёва» перенаправляется сюда; см. также другие значения. Алла Пугачёва На фестивале «Славянский базар в Витебске», 2016 год Основная информация Полное имя Алла Борисовна Пугачёва Дата рождения 15 апреля 1949(1949-04-15) (75 лет) Место рождения Москва, СССР[1]...
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article's lead section may be too short to adequately summarize the key points. Please consider expanding the lead to provide an accessible overview of all important aspects of the article. (April 2024) This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Uns...
Family of fishes For the species Tandanus tandanus, see Eel-tailed catfish. Eeltail catfish Euristhmus microceps Scientific classification Domain: Eukaryota Kingdom: Animalia Phylum: Chordata Class: Actinopterygii Order: Siluriformes Superfamily: Siluroidea Family: PlotosidaeBleeker, 1858 Genera Anodontiglanis Cnidoglanis Euristhmus Neosiluroides Neosilurus Oloplotosus Paraplotosus Plotosus Porochilus Tandanus Striped eel catfish, Plotosus lineatus The eeltail catfish are a family (Plotosidae...
Reservoir in Siskiyou County, CaliforniaLake McCloudLooking north over McCloud ReservoirLake McCloudShow map of CaliforniaLake McCloudShow map of the United StatesLocationSiskiyou County, CaliforniaCoordinates41°07′52″N 122°04′14″W / 41.13111°N 122.07056°W / 41.13111; -122.07056TypeReservoirPrimary inflowsMcCloud RiverPrimary outflowsMcCloud RiverBasin countriesUnited StatesSurface area520 acres (210 ha)[1]Water volume35,200 acre⋅ft...
Portugália IATA ICAO Kode panggil NI PGA PORTUGALIA Didirikan1988PenghubungPortela AirportKota fokusFrancisco Sá Carneiro AirportProgram penumpang setiaVictoriaArmada16 (dengan PGA Express)Tujuan23Perusahaan indukTAP PortugalKantor pusatBandar Udara Lisbon PortelaLisbon, PortugalTokoh utamaLuiz Plácido Lapa (CEO)Situs webPGA Portugália adalah nama maskapai penerbangan Portugal. Dengan kode IATA NI dan kode ICAO PGA. Destinasi Di bawah ini adalah daftar nama-nama kota dan bandar udara yang...
Drapeau Armoiries Le Statthalter d'Alsace-Lorraine gouvernait le Reichsland Elsaß-Lothringen. Un Statthalter, ou gouverneur, était un administrateur dans l'Empire allemand. Contexte historique Le Statthalter était le représentant de l'empereur dans l'Alsace-Lorraine. L'Alsace et la partie de la Lorraine qui deviendra la Moselle sont annexées en 1871 par l'empire wilhelminien. Ces territoires français furent réunies sous une présidence unique d'Alsace-Lorraine, qui fut transformée ens...
У этого термина существуют и другие значения, см. Список. Начало Троицкого I списка Русской Правды. Наиболее исправный список Пространной редакции, XIV век[1] В Викисловаре есть статья «список» Спи́сок (от спи́сывать) — списанный откуда-либо текст, а также документ...
British judge (1883–1952) Baron Greene redirects here. For other people known as Lord Greene, see Lord Greene (disambiguation). The Right HonourableThe Lord GreeneOBE MC PCPortrait of Lord Greene as Master of the Rolls, by GluckMaster of the RollsIn office26 April 1937 – 1 June 1949Preceded byThe Lord WrightSucceeded byThe Lord Evershed Personal detailsBornWilfred Arthur Greene30 December 1883Beckenham, KentDied16 April 1952 (1952-04-17) (aged 68)Dorking, Surrey...
Questa voce sull'argomento Provincia di Como è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Lago di AlserioStati Unione europea Italia Regioni Lombardia Province Como Coordinate45°47′11″N 9°13′00″E45°47′11″N, 9°13′00″E Altitudine262 m s.l.m. DimensioniSuperficie1,23 km² Profondità massima8,1 m IdrografiaBacino idrografico18,3 km² Emissari principalitributario del Lambro Modifica dati...
This article is about LGBT legal rights in Japan. For a general overview, see Homosexuality in Japan. You can help expand this article with text translated from the corresponding article in Japanese. (September 2023) Click [show] for important translation instructions. Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasti...
Fictional land in Tolkien's Middle-earth, south of Gondor and Mordor For other uses, see Harad (disambiguation). HaradJ. R. R. Tolkien's legendarium locationHaradrim chieftain's standardFirst appearanceThe Fellowship of the RingIn-universe informationOther name(s)Haradwaith, Hyarmen, the SunlandsTypeVast hot southern regionLocationsUmbar, Near Harad, Far Harad In J. R. R. Tolkien's high fantasy The Lord of the Rings, Harad is the immense land south of Gondor and Mordor. Its main port is Umbar...
Town in Central Denmark Place in Central Denmark, DenmarkSilkeborgSilkeborgView of Silkeborg church (built 1877), looking north-west Coat of armsSilkeborgLocation in DenmarkShow map of DenmarkSilkeborgSilkeborg (Denmark Central Denmark Region)Show map of Denmark Central Denmark RegionCoordinates: 56°11′00″N 9°33′06″E / 56.18333°N 9.55167°E / 56.18333; 9.55167Country DenmarkRegionCentral Denmark (Midtjylland)MunicipalitySilkeborgArea • Urban...