Line 11 of the Beijing Subway (Chinese: 北京地铁11号线; pinyin: běijīng dìtiě shíyī hàoxiàn) is a rapid transit line of the Beijing Subway.[6] The line opened between Jin'anqiao and Xinshougang (Shougang Park) on December 31, 2021,[2] and between Jin'anqiao and Moshikou on December 30, 2023.[7][8] Line 11's color is grapefruit.
All stations are in Shijingshan.
In 2006, Line 11 was originally designed as an L-shaped line from Wanliu to Dahongmen, which together with the L-shaped Line 10, form a subway ring route.[15] After Line 10 Phase II took over the entire ring route, Line 11 was displaced.
In January 2010, the government of Shijingshan District disclosed plans for a Line 11 in western Beijing that would traverse the Shougang (Beijing Capital Steel) complex and intersect with Lines 4 and 16.[16][17]
Construction started on November 13, 2019.[6] The western section (Phase 1) of Line 11 (Moshikou station — Xinshougang station), also known as "Winter Olympic Branch Line", is 4.2 km (2.6 mi) in length with 4 stations.[3][4] It is fully underground.[18][19]
Jin'anqiao, Beixin'an and Xinshougang (Shougang Park) stations opened on December 31, 2021.[20] Moshikou station opened on December 30, 2023.[7]
According to the information released on January 11, 2022, Phase II of Line 11 to Lize Shangwuqu and Yangqiao is included in the "Beijing Rail Transit Phase III Construction Plan".[21] In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) confirmed that it will be 23.8 km (14.8 mi) long with 17 stations.[22]
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
Lokasi Pengunjung: 18.116.49.209