The building was constructed as a post office and courthouse in 1934. Renovations completed in July 2014 improved the interiors and exterior, and reduced water and electric usage. Installations included high-efficiency water boilers, air-handling units, a building automation system, a rainwater harvesting tank, light fixtures, occupancy and daylight harvesting sensors, and low-flow water fixtures. On the exterior, portions of the building's sandstone facade and chimney were repaired or replaced. Its windows were reglazed, and its penthouses were re-paneled.[2]