Habra railway station

Habra
Kolkata Suburban Railway station
General information
LocationHabra, North 24 Parganas district, West Bengal
India
Coordinates22°50′27″N 88°39′27″E / 22.840921°N 88.657491°E / 22.840921; 88.657491
Elevation11 metres (36 ft)
Owned byIndian Railways
Operated byEastern Railway
Line(s)Sealdah–Hasnabad–Bangaon–Ranaghat line of Kolkata Suburban Railway
Platforms3
Tracks3
Construction
Structure typeAt grade
ParkingNot available
Bicycle facilitiesNot available
Other information
StatusActive
Station codeHB[1]
Zone(s) Eastern Railway
Division(s) Sealdah
History
Opened1906; 118 years ago (1906)
Electrified1972; 52 years ago (1972)
Services
Preceding station Kolkata Suburban Railway Following station
Ashoknagar Road
towards Sealdah
Eastern Line Sanhati Halt
Location
Habra is located in West Bengal
Habra
Habra
Location in West Bengal
Habra is located in India
Habra
Habra
Location in India

Habra railway station, station code HB, is a station of Eastern Railway. It is 45 km (28 mi) away from Sealdah railway station and 23 km (14 mi) from Barasat on the Sealdah–Bangaon line of Eastern Railway.[2] It serves Habra town and is a part of the Kolkata Suburban Railway system. Stationmaster:Deborshi Habra

Station complex

The station consists of three platforms[3] and are very much well sheltered. It has many facilities including drinking water and sanitation. Here, both two types of railway tickets - reserved and unreserved are available.

Electrification

The SealahDum DumBarasatAshok NagarBangaon line was electrified in 1963–64.[4]

Connectivity

Habra railway station connects Gobardanga, Thakurnagar and Bangaon to Sealdah station and other stations of the Sealdah–Bangaon line. It is directly connected to NH 112 (Jessore Road). Habra is a major railway station between Bangaon junction railway station and Barasat junction railway station.

History

Habra is located on Sealdah–Hasnabad–Bangaon–Ranaghat line of Kolkata Suburban Railway. It links between Dum Dum to Khulna now in Bangladesh, via Bangaon was constructed by Bengal Central Railway Company in 1882–84.[5]

The station layout

G Street level Exit/Entrance & ticket counter
P1 FOB, Side platform, No-1 doors will open on the left/right
Track 1 Towards →Bangaon→ →
Track 2 Towards ←Sealdah← ←
FOB, Island platform, No- 2 doors will open on the left/right
Island platform, No- 3 doors will open on the left/right
Track 3
Habra track layout
Station with three tracks
and one side platform
and two island platforms

See also

References

  1. ^ "Indian railway codes". Indian Railways. Retrieved 27 August 2018.
  2. ^ Eastern Railway time table
  3. ^ "HB/Habra". India Rail Info.
  4. ^ "History of Electrification". IRFCA. Retrieved 28 August 2017.
  5. ^ "The Chronology of Railway development in Eastern Indian". Rail India. Archived from the original on 16 March 2008. Retrieved 28 August 2017.