Before Bluewater was built Greenhithe station was just a small village station. The only access between the entrance and the London-bound platform was via a subway with no disabled access.
The station was rebuilt in 2008 to improve accessibility for disabled users and upgrade the station and ticketing facilities. This was a pioneering modular design by Network Rail, with Mitcham Eastfields and Corby later constructed in the same way.[1]
The subway has been replaced by a bridge with stairs and lift access at both ends. The new station entrance and booking hall lies directly between the bridge and the bus stop outside (see Fastrack below). Before the construction of this stop and its access road, buses had to stop some distance away downhill and passengers had to transfer via stairs and a footpath.