The station has two side platforms (platform 1 on the down main line and platform 4 on the up relief line) and a central island platform with two faces (platform 2 on the up main line and platform 3 on the down relief line).[1] Platforms 1 and 2 are only used when engineering works cause stopping trains to use the fast tracks and the platform edges are closed off by fences incorporating normally closed (but not locked) gates.
The main station building is to the east of the station, alongside platform 4 and on the opposite side of the station to the village centre. There is a large car park to the south of the station building. There are also two pedestrian entrances onto platform 1, one of which links directly to Goring village centre. Access between the platforms is via a footbridge, accessed by steps and lifts from all platforms.
History
The station was on the original line of the Great Western Railway, on the section between Reading and Steventon that opened on 1 June 1840. Originally named Goring, the station was located between Pangbourne and Moulsford stations. In 1892, Moulsford station was closed and replaced by the current Cholsey station. Goring station was renamed Goring & Streatley on 9 November 1895 to prevent confusion with Goring-By-Sea.[2][3][4]
Preparation for the electrification of the line between Paddington and Bristol/Oxford required raised clearances and hence the replacement of the old footbridge. Following a strong local campaign led by the mobility group MIGGS (Mobility Issues Group for Goring and Streatley), Network Rail included lifts in the new footbridge, which was opened in June 2016. These changes also resulted in the demolition of the former ladies waiting room and toilet block on the island platform. The ticket office, toilets and waiting rooms are only open when the station is staffed in the mornings (Mondays to Saturdays). There is a bus stop in the road immediately outside the ticket office, with local buses running to Cleeve, South & North Stoke and Wallingford (Mondays to Saturdays) operated by Going Forward Buses CIC.
The typical off-peak is two trains per hour in each direction between London Paddington and Didcot Parkway. On Sundays, the service is reduced to hourly in each direction.[5]
Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN978-1-85260-086-0. OCLC22311137.