In November 2014, the Port Authority of New York and New Jersey released a Tier 1 Draft Environmental Impact Statement (DEIS) for its Cross Harbor Freight Program.[1] It reviewed four waterborne and four tunnel alternatives. Estimated costs for the waterborne alternatives ranged from $95 to 190 million, and from $7 to 11 billion for the tunnel alternatives. On September 25, 2015, the Tier 1 Final Environmental Impact Statement was released,[2] which narrowed the alternatives to two, an enhanced railcar float operation and a basic rail tunnel, both between New Jersey and Brooklyn. A phased plan starting with building the enhanced car float was proposed.
In early May 2017, the Port Authority issued a Request for Proposals (RFP) for a “Tier II” Environmental Impact Study of the rail tunnel and enhanced railcar float alternatives.[3] A $23.7 million, three-year contract for the Tier II study was awarded in early 2018.[4] The Tier II study was suspended during the COVID-19 crisis, but was restarted in February 2022.[5]
In the early 1990s, U.S. Representative Jerrold Nadler revived interest in direct connection of rail freight to Long Island, hoping to reduce truck traffic through Manhattan.[9] With support from the City government, the New York City Economic Development Corporation commissioned a study of rail freight traffic across New York Harbor. The Cross Harbor Freight Movement Major Investment Study received $4 million from the U.S. Department of Transportation and $1 million from the New York City Industrial Development Agency.[10] Edwards and Kelcey,[11] a transportation engineering firm in Morristown, NJ, was hired to study the feasibility of alternative approaches to increased rail access for freight.
The idea of a cross-harbor rail tunnel also received support from Connecticut transportation planners, who believed such a rail connection would reduce truck traffic on the heavily congested Connecticut Turnpike.[12]
The New York City boroughs of the Bronx and Staten Island have active rail freight connections, via the Oak Point Link and the Arthur Kill Vertical Lift Bridge, respectively. The latter connects Staten Island with rail lines west of the Hudson, and serves the Howland Hook Marine Terminal and a municipal waste facility, but there are no rail connections between Staten Island and the rest of New York City or Long Island. Manhattan last saw freight service in 1983.[14] The West Side freight line was partially converted to passenger service to Pennsylvania Station in 1991, with the West Side freight yards replaced by Riverside South and the elevated portion south of 30th street converted into High Line Park.
Feasibility and environmental issue studies
In its summer 2000 report, Edwards and Kelcey evaluated proposals for rail tunnels between Brooklyn and Staten Island and between Brooklyn and Jersey City, plus increased barge transport of railcars across New York Harbor. It estimated a pair of tunnels between Jersey City and Brooklyn to cost $2.15 billion, not including track connections or track improvements. Despite the length of the tunnels being considered, up to 17,000 ft (5,182 m) under water, the study found that providing enough ventilation to operate diesel locomotives would be practical.[15]
Probably mindful of environmental issues that were key elements in the 1985 cancellation of the Westway project, the New York City Industrial Development Agency commissioned an environmental assessment. This assessment found that immersed tube construction would be environmentally more hazardous and more expensive than bored tunnel construction. Ventilation was confirmed as practical and found unlikely to present greater hazards than fumes from trucks that would otherwise be used to transport freight.[6]
Following the feasibility and environmental studies, two organizations were formed to plan and promote a tunnel project and to seek government funding. They are the Cross Harbor Freight Movement Project,[16] hosted by the STV Group,[17] a construction firm in New York City and Douglassville, Pennsylvania, and the Cross-Harbor Tunnel Coalition,[18] also known as "MoveNYNJ" or "Move NY & NJ". The Cross Harbor Freight Movement Project is supported by funds from the U.S. Federal Highway Administration, the U.S. Federal Railroad Administration and the New York City Economic Development Corporation, while the Cross-Harbor Tunnel Coalition is a voluntary organization of business, union and political leaders. Political activity led to authorization of $100 million for a Cross Harbor Rail Freight Tunnel as a federal transportation project in the U.S. Transportation Equity Act of 2005.[19]
2014 Draft Environmental Impact Study
The 2014 Tier 1 Draft Environmental Impact Study[20] (DEIS) considered 29 alternatives and selected ten for further study, including five tunnel options and five waterborne options. The tunnel options considered include the following:
Rail tunnel
Rail tunnel with shuttle service from Pennsylvania
Rail tunnel with "Chunnel" service patterned after the truck movement system used on the England-France Channel Tunnel
Rail and truck tunnel shared 12 hours for trucks and 12 hours for rail
The waterborne options include enhanced rail float operations, going beyond what the improvements the Port Authority has already committed to, and four options involve transporting trucks or shipping containers across the harbor by boat. The latter group includes
Truck float
Truck ferry
Lift on lift off (LOLO) – lifting containers on and off a barge
Roll on roll off (RORO) – a vessel designed to allow wheeled trucks or trailers to be driven onboard
The DEIS Executive Summary (Table ES-6) lists the following costs and benefits for the various options:
Metric
Enhanced rail float
Truck waterborne
Rail tunnels
Rail+truck shared tunnel
Construction cost (millions of 2012 dollars)
$142
$95 – $190
$6,927 – $10,790
$7,815 – $10,875
Freight diversion (million tons/yr)
0.5–2.8
0.3–1.7
7.2–10.5
24.1
Reduction in cross harbor truck traffic
0.8%
0.8%
2% – 3.7%
8%
Shipper savings (millions of 2012 dollars)
$143 – $196
< $1
$621 – $646
$636
Only the enhanced rail float and the basic rail tunnel options were selected in the Final EIS for Tier II analysis.
During the environmental assessment, existing rail infrastructure was surveyed for compatibility with a Cross-Harbor Rail Tunnel. Parts of the existing trackage need repair. Some rights of way have been reduced to single-track width or were never wider and are in deteriorating condition due to their little use and maintenance. Nearly all track segments lack enough clearance above the tracks for the envisaged double-stacked container cars.[22][23] Such factors limit the effective capacity of a rail tunnel and will add substantial cost to overcome. Rail yards east of New York Harbor lack a trans-shipment terminal with enough capacity to transfer the freight coming through a Cross-Harbor Rail Tunnel to trucks. A proposal was generated to acquire 100 acres (40 ha) of land to build one in West Maspeth, Queens.[24] Studies performed for the Cross-Harbor Rail Tunnel say about 30,000 trucks per day cross the George Washington Bridge and the Verrazano Narrows Bridge going to or from parts of Long Island, including Queens and Brooklyn, or about 10 million trucks per year.
2015 Final Tier I Draft Environmental Impact Statement
The Final Tier I Draft Environmental Impact Statement recommends further study of two alternatives: enhanced rail float operations and the most basic rail tunnel among the tunnel alternatives. While the rail float alternative is expected to produce less freight tonnage diversion than the tunnel (2.8 million tons per year vs 9.6), its costs are dramatically less, $175 million vs. $7.2 billion. The EIS recommends a phased approach, starting by building enhanced float service for carload freight, adding capacity for intermodal traffic, developing needed intermodal facilities on Long Island and finally planning and building the rail freight tunnel.[2]
Port Authority Chairman John J. Degnan expressed doubts about the freight rail tunnel alternative in light of competing demands on Port Authority resources, including the Gateway Project passenger rail tunnel under the Hudson, which is estimated to cost $20 billion, and a new Port Authority Bus Terminal costing up to $10 billion. "It's hard for me to imagine, given the competing demands for the federal government fund for other projects, that it would commit to funding at a cost on that order of magnitude."[25]
Tier II efforts
In July 2017, the Port Authority announced it had allocated $35 million to the study of the tunnel suitable for freight.[26] In February 2018, the Port Authority awarded a $23.7 million contract to Cross Harbor Partners, a joint venture of STV Incorporated and AKRF Inc., to develop a Tier II Environmental Impact Statement. The Tier II process is expected to take three years.[4]
Criticism
Some critics object that improving rail transport with a tunnel would provide little traffic reduction relative to its high cost.[27] The West Maspeth facility has been heavily criticized. It is proposed for an industrial site about four blocks south of the interchange between the Long Island Expressway (I-495) and the Brooklyn-Queens Expressway (I-278), where Nichols Copper and later Phelps Dodge operated a copper refinery for decades. The copper plant closed in 1983, and the site has been largely vacant since then, although a new food warehouse was completed at its eastern end in 2005. It abuts the heavily polluted Newtown Creek.[28]
Although the Cross-Harbor tunnel terminal site is close to two major highways and existing rail, many access routes pass through residential neighborhoods. Based on the estimates of the rail tunnel's capacity, traffic to and from the site could reach thousands of truck trips per day. However, most of those trucks already travel through those highways to use the existing bridge connection.
Spokespersons for neighborhoods in Brooklyn and Queens strongly object to land being designated for a trans-shipment terminal or other railroad uses[29] and to the noise and vibration expected from passage of up to 1,600 rail cars per day.[30] Reacting to these criticisms, in March 2005 New York City Mayor Michael Bloomberg announced that he opposed the rail tunnel project.[31] However, in early July 2007, Mayor Bloomberg told Rep. Nadler he would be willing to take another look at the plan.[32]
A City University of New York study, published in 2011, pointed out that "no current demand for a containerized truck-rail facility has yet been demonstrated" on Long Island, in part because long-distance trucks, including intermodal containers, generally must be unloaded at major distribution centers which typically serve an entire metropolitan area. Few such distribution centers are located on Long Island.[33] The study also noted that standard double stack rail equipment is too wide to run on tracks where third rail is used, as it is on much of the Long Island Rail Road's passenger routes.[34]
Concern has been expressed about the project's impact on Port Authority toll revenue.[35]
The proposed "MoveNY" transportation plan[36] would use right-of-way needed for the tunnel project, including the Bay Ridge branch, to build a new Triboro RX subway service connecting The Bronx, Queens and Brooklyn, potentially interfering with the right-of-way's use for rail freight. A feasibility study for the Interborough Express project, which would implement part of the Triboro RX route, indicated that both projects could potentially co-exist.[37][38]
Former executive director of the PANYNJ, Christopher O. Ward has come out forcefully against the project.[39]
See also
Interborough Express, proposed passenger rail service between Brooklyn and Queens that would use existing rail freight right of way
^The diameter of a two-lane tube for the Holland Tunnel is slightly less than the diameter for a tube with one rail line in a Cross-Harbor Rail Tunnel.[6]
^Baer, Christopher T., ed. (June 2004). "PRR Chronology"(PDF). Pennsylvania Railroad Technical & Historical Society. Archived from the original(PDF) on May 20, 2011.
^"CHFP Tier 1 EIS Document". Cross Harbor Freight Program. The Port Authority of New York and New Jersey. Archived from the original on November 29, 2014. Retrieved November 29, 2014.
^Dredged Material Management Interagency Workgroup (February 5, 2003). "Meeting Notes"(PDF). NY/NJ Clean Ocean And Shore Trust. Archived from the original(PDF) on November 8, 2005. Retrieved May 20, 2006.
Carnegie Science CenterLetak Carnegie Science Center di PennsylvaniaDidirikanOktober 1991LokasiPittsburgh, PennsylvaniaKoordinat40°26′44″N 80°01′05″W / 40.445614°N 80.018181°W / 40.445614; -80.018181Situs webwww.carnegiesciencecenter.org Carnegie Science Center adalah salah satu dari empat Museum Carnegie di Pittsburgh, Pennsylvania. Tempat tersebut terletak di wilayah Chateau.[1] Tempat tersebut terletak di sepanjang jalan dari Heinz Field. Museum ...
Artikel ini memberikan informasi dasar tentang topik kesehatan. Informasi dalam artikel ini hanya boleh digunakan untuk penjelasan ilmiah; bukan untuk diagnosis diri dan tidak dapat menggantikan diagnosis medis. Wikipedia tidak memberikan konsultasi medis. Jika Anda perlu bantuan atau hendak berobat, berkonsultasilah dengan tenaga kesehatan profesional. Kentut beralih ke halaman ini. Untuk film komedi yang dirilis pada tahun 2011, lihat Kentut (film). Untuk makanan khas Medan, lihat Nasi kent...
Lokasi pulau Sudong Pulau SudongSubzona Wilayah Perencanaan Kepulauan BaratTranskripsi Nama • China苏东岛 • Pinyinsūdōng dǎo • MelayuPulau Sudong • Tamilசுடோங் தீவுNegaraSingapura Pangkalan Udara Pulau SudongIATA: -ICAO: -InformasiJenisMiliterPemilikPemerintah SingapuraPengelolaMINDEFMelayaniSingapuraLokasiPulau SudongLandasan pacu Arah Panjang Permukaan m kaki 09/27 2,440 7,999 Aspal [1] Pulau Sudong adala...
Daerah Khusus Ibukota Jakarta IIDaerah Pemilihan / Daerah pemilihanuntuk Dewan Perwakilan RakyatRepublik IndonesiaWilayah Daftar Kota : Jakarta Pusat Jakarta Selatan Luar Negeri ProvinsiDKI JakartaPopulasiDalam Negeri : 3.500.822 (2023)[1]Luar Negeri : 3.011.202 (2022)[2]ElektoratDalam Negeri : 2.596.401 (2024)[3]Luar Negeri : 1.750.474 (2024)[4]Daerah pemilihan saat iniDibentuk2004Kursi9 (2004—09)7 (2009—sekarang)Anggota Himm...
American visual effects company This article is about the VFX company. For the audio mastering studio, Digital Domain Mastering, see Bob Katz. For digital domain, as opposed to analogue domain, see digital. This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages) This article contains content that is written like an advertisement. Please help improve it by removing promotional content and inapprop...
1898–1945 French enclave in South China Guangzhouwan redirects here. Not to be confused with Guangzhou. Kouang-Tchéou-Wan廣州灣1898–1945 FlagLocation of Kwangchow Wan and French IndochinaStatusLeased territory of FranceCapitalFort-BayardCommon languages French (official) Cantonese Historical eraNew Imperialism• French occupation 22 April 1898• Leased by France 29 May 1898• Administered by French Indochina 5 January 1900• Occupied by Japan 21 February 1...
UFC mixed martial arts event in 2011 UFC 141: Lesnar vs. OvereemThe poster for UFC 141: Lesnar vs. OvereemInformationPromotionUltimate Fighting ChampionshipDateDecember 30, 2011VenueMGM Grand Garden ArenaCityLas Vegas, NevadaAttendance13,793[1]Total gate$3,100,000[1]Buyrate750,000[2][3]Event chronology UFC 140: Jones vs. Machida UFC 141: Lesnar vs. Overeem UFC 142: Aldo vs. Mendes UFC 141: Lesnar vs. Overeem was a mixed martial arts pay-per-view event held by t...
LemangلمڠSepotong lemang di atas piring.Tempat asalIndonesia, Malaysia, BruneiBahan utamaBeras ketanSunting kotak info • L • BBantuan penggunaan templat ini Media: Lemangلمڠ Cara memasak lemang Lemang (Jawi: لمڠ) adalah penganan dari beras ketan yang dimasak dalam seruas bambu, setelah sebelumnya digulung dengan selembar daun pisang. Gulungan daun bambu berisi beras ketan dicampur santan kelapa ini kemudian dimasukkan ke dalam seruas bambu lalu dibakar sampai ...
Images de la découverte de J002E3 par Bill Yeung le 3 septembre 2002. J002E3 est la désignation temporaire donnée à un objet extra-atmosphérique originellement présumé être un astéroïde. Il fut découvert par l'astronome amateur Bill Yeung le 3 septembre 2002. Des observations plus poussées révélèrent que l'objet n'est pas un astéroïde rocheux mais probablement le troisième étage de la fusée Saturn V de la mission Apollo 12[1]. Origine L'étage S-IVB du vol d'Apollo 7 en or...
Questa voce sull'argomento cestisti croati è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Mate Kalajžić Nazionalità Croazia Altezza 187 cm Peso 79 kg Pallacanestro Ruolo Playmaker Squadra Spalato CarrieraGiovanili 2010-2016 SpalatoSquadre di club 2013-2020 Spalato2020-2022 Gorica2022- SpalatoNazionale 2014 Croazia U-162015 Croazia U-182017-2018 Croazia U-202017- Croa...
For other films, see Milan. This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Milan 1967 film – news · newspapers · books · scholar · JSTOR (June 2012) (Learn how and when to remove this message) 1967 Indian filmMilanPosterDirected byAdurthi Subba RaoWritten byAthreya MullapudiAdurthi Subba RaoVirendra Si...
Rash on the mucous membranes Medical conditionEnanthemRubella (German measles) enanthemaSpecialtyInfectious diseases, dermatology Differential diagnosissmallpox Enanthem or enanthema is a rash (small spots) on the mucous membranes.[1] It is characteristic of patients with viral infections[2] causing hand foot and mouth disease, measles, and sometimes chicken pox, or COVID-19.[3] In addition, bacterial infections such as Scarlet fever may also be a cause of enanthe...
Patriotic organization Not to be confused with Sons of the American Revolution. Sons of the RevolutionCeremonial badgeNamed afterSons of LibertyEstablishedFebruary 22, 1876 (1876-02-22) (first state society)April 19, 1890 (1890-04-19) (General Society)FounderJohn Austin StevensFounded atNew York CityTypePatriotic organizationLegal statusNonprofit corporationHeadquarters412 West Francis Street, Williamsburg, VirginiaCoordinates37°16′09″N 76°42′24″W...
قانون هابلمعلومات عامةسُمِّي باسم إدوين هابلجورج لومتر المكتشف أو المخترع جورج لومترإدوين هابل زمن الاكتشاف أو الاختراع 1927 تعريف الصيغة v = H 0 D {\displaystyle v=H_{0}D} الرموز في الصيغة H 0 {\displaystyle H_{0}} v {\displaystyle v} D {\displaystyle D} تعديل - تعديل مصدري - تعديل ويكي بيانات جزء من سلسلة عنعلم الكو�...
Questa voce sull'argomento calciatori namibiani è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Riaan HanamubNazionalità Namibia Altezza170 cm Calcio RuoloDifensore Squadra AmaZulu CarrieraGiovanili 20??-20?? Touch & Go Otavi Squadre di club1 2013-2015 Touch & Go Otavi? (?)2015-2018 Orlando Pirates? (?)2018-2020 Jomo Cosmos32 (1)2020-2022 Chippa Utd59 (1)2022- Ama...
Tennis tournamentOpen 13Tournament informationFounded1993Editions32 (2024)LocationMarseilleFranceVenuePalais des sports de MarseilleCategoryATP World Series(1993–1997)ATP International Series(1998–2008)ATP Tour 250(2009–current)SurfaceHard (indoor)Draw28S / 16Q / 16DPrize money€707,510 (2023)Websiteopen13.frCurrent champions (2024)Singles Ugo HumbertDoubles Tomáš Macháč Zhang Zhizhen The Open 13 is an annual men's tennis tournament played in Marseille, France. The tournament ...
1st-century BC Roman historian Shrine of the nymph Egeria, Caffarella Park, Rome. Numa Pompilius consulted her frequently, but on the early Aventine. The life of Numa was of extensive interest to Antias. In Fragment 6 (Plutarch, Numa, 15 and elsewhere) following the nymph's advice he summons Jupiter from heaven and forces him to accept a remedy of onion and fish heads to counter the effects of a lightning strike, instead of the human heads proposed by the god. Livy ignores the story.[1 ...