Bondamunda railway station

Bondamunda
Indian Railways junction station
General information
LocationBondamunda, Sundergarh district, Odisha
 India
Coordinates22°14′09″N 84°55′31″E / 22.2359°N 84.9254°E / 22.2359; 84.9254
Elevation236 m (774 ft)
Owned byIndian Railways
Operated bySouth Eastern Railways
Line(s)Tatanagar–Bilaspur section of Howrah–Nagpur–Mumbai line
Platforms6
Tracks6 5 ft 6 in (1,676 mm) broad gauge
Construction
Structure typeStandard (on ground station)
ParkingAvailable
AccessibleDisabled access Available
Other information
StatusFunctioning
Station codeBNDM
Zone(s) South Eastern Railway zone
Division(s) Chakradharpur
History
Electrified1961–62
Services
Preceding station Indian Railways Following station
Bisra
towards ?
South Eastern Railway zone Rourkela
towards ?
Terminus South Eastern Railway zone Dumetra
towards ?
South Eastern Railway zone
Bondamunda–Ranchi lne
Bispur
towards ?
Location
Bondamunda railway station is located in Odisha
Bondamunda railway station
Bondamunda railway station
Location in Odisha
Bondamunda railway station is located in India
Bondamunda railway station
Bondamunda railway station
Location in India

Bondamunda railway station (station code:- BNDM), located in the Indian state of Odisha, serves Bondamunda and Rourkela in Sundergarh district.

History

The Nagpur–Asansol main line of Bengal Nagpur Railway came up in 1891 and the cross-country Howrah–Nagpur–Mumbai line started functioning in 1900.[1]

After independence of India, this area saw a lot of activity. In the 1950s when Rourkela Steel Plant was being constructed, a marshalling yard was set up at Bondamunda to cater to the requirements of bulk transportation. New lines were added. A 170 km (106 mi) line was constructed to establish a direct link with Ranchi. Bondamunda was connected to Barsuan iron ore mines in 1960 and the line was extended to Kiriburu in 1964. The marshalling yard is the second largest in India.[2]

Bondamunda was electrified in the year between 1961–62.[3][4]

Diesel loco Shed, Bondamunda

SN Locomotives HP Quantity
1. WDG-3A 3100 62
2. WDM-3A 3100 20
3. WDM-3D 3300 12
4. WDG-4/4D 4000/4500 109
5. WAG-7 5350 39
6. WAG-11 12000 1
Total Locomotives Active as of May 2024 243

Electric loco Shed, Bondamunda

SN Locomotives HP Quantity
1. WAP-7 6350 16
2. WAG-5 3850 2
3. WAG-9 6120 241
4. WAG-11 12000 1
Total Locomotives Active as of July 2024 260

Bimlagarh–Talcher Project

The 156 km (97 mi) long line connecting Bimlagarh on the Bondamunda–Barsuan branch line and Talcher on the Sambalpur–Talcher–Barang branch line, was sanctioned in 2004–05 and construction is in progress. This line when complete would reduce the distance between Rourkela and Bhubaneswar, the state capital, from 460 km (via Sambalpur) to 300 km.[5]

References

  1. ^ "Major Events in the Formation of S.E. Railway". South Eastern Railway. Archived from the original on 1 April 2013. Retrieved 2012-12-05.
  2. ^ "Bondamunda Junction". Archived from the original on 14 April 2010. Retrieved 8 December 2012.
  3. ^ "History of Electrification". IRFCA. Retrieved 5 December 2012.
  4. ^ http://elocos.railnet.gov.in/Holding/holding_01_19.pdf[permanent dead link]
  5. ^ "Bimlagarh–Talcher rail link: All decks cleared". Welcome Orissa. Archived from the original on 4 March 2016. Retrieved 8 December 2012.