Construction of the tunnel began in March 2005 and was completed in July 2009. Obayashi Corporation was the general contractor. The twin running tunnels were excavated with a tunnel boring machine (TBM) built by Mitsubishi, named the "Emerald Mole."[2] The station and crossover tunnels were constructed using the sequential excavation method (SEM), also known as the New Austrian tunnelling method (NATM).[3]
Several workers were injured and one was killed during construction of the tunnel.[4]
The tunnel was completed at a cost of $309 million, versus Obayashi's bid of $280 million.[5]