You can help expand this article with text translated from the corresponding article in Slovene. (January 2024) Click [show] for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Slovene Wikipedia article at [[:sl:Avtocesta A4]]; see its history for attribution.
You may also add the template {{Translated|sl|Avtocesta A4}} to the talk page.
The A4 motorway (Slovene: avtocesta A4, Podravski krak) is a 33.4 km long motorway in Slovenia connecting Maribor and Gruškovje (at the Croatian border). It also connects the two principal cities of the Drava Statistical Region of Slovenia, Maribor and Ptuj. Construction began in 2007 and was completed in 2018.
Sections
This section needs to be updated. Please help update this article to reflect recent events or newly available information.(August 2022)
Section Draženci – Gruškovje develops along the existing highway. A reconstruction of parallel local roads is also planned now. Of this section shall be in 2011-2012 produced a project for a building permit and bought land in accordance with the adopted national spatial plan.
Section Draženci – Podlehnik opened on 22 November 2017.
Construction on section Podlehnik – Gruškovje started in 2016 and finished in November 2018.
An international border check point Gruškovje was built in the spring of 2003 on the future route of the highway. This was a condition for the entry of Slovenia into the Schengen Area in December 2007. Then in December 2009 a 0.56 km section of the highway was opened from the check point to the actual border with the Republic of Croatia, where it attaches to the Croatian motorway network in Macelj. The border crossing area is adjacent to the border control, built a 2 overpass with deviation of the future regional road.