Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC).[3] It has 31 stations and is 26.2 kilometres (16.3 mi) in length. It opened on February 26, 1966,[4][5][6] and extensions at both ends were completed in 1968 and again in 1980.
↑"Subway". Schedules & Maps. Toronto Transit Commission. Archived from the original on August 27, 2016. Retrieved February 3, 2017. Line 2 Bloor–Danforth has 31 stations
↑New subway line opens in Toronto Railway Age February 28, 1966 page 12