The British Rail Class 411 (or 4 Cep) electrical multiple units were built at Eastleigh works from 1956-63 for the newly electrified main lines in Kent. These units were based on the earlier Southern Railway 4Cor design, built in 1937.
|
---|
AC units: | |
---|
AC units (pre-TOPS): | |
---|
DC units: | |
---|
DC units (Original TOPS): | |
---|
DC units (pre-TOPS): | |
---|
Southern Railway designations: | |
---|
Families: | |
---|
|