Line 2, also known by the names of its termini, currently Paral·lel - Badalona Pompeu Fabra, is a metro line in Barcelona operated by TMB, coloured purple and sometimes simply called línia lila.
Chronology
- 1995 - Sant Antoni-Sagrada Família section opened.
- 1996 - Sant Antoni-Paral·lel section opened.
- 1997 - Sagrada Família-La Pau section opened.
- 2002 - La Pau-Pep Ventura section moved from L4 to this line.
- 2010 - Pep Ventura - Badalona Pompeu Fabra section opened.
Technical details
- Colour on map: Purple
- Number of stations: 18
- Type: Conventional metro
- Length: 13.1 km (8.1 mi)
- Rolling stock: 2100, 5000 and 9000 series
- Journey time: 24 minutes
- Track gauge: 1435
- Traction: Electricity
- Power supply: Rigid overhead wire
- Open-air sections: No
- Mobile phone coverage: Partial
- Depots: Verneda (Triangle Ferroviari)
- Operator: TMB
Stations
Station and line names shown in italics are planned or under construction additions.
Other websites
41°26′38″N 2°14′17″E / 41.444°N 2.238°E / 41.444; 2.238