The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) is an authority set up in 2007 by the Government of Uttar Pradesh to develop expressway projects in the state.[1] The headquarters of UPEIDA is located at Paryatan Bhawan in Gomti Nagar, Lucknow.
List of Expressways in Uttar Pradesh being undertaken by authority is as follows:[2] Listed north to south, west to east.
A. West to east across the state: approved.
A1. Across Northern Uttar Pradesh: Ludhiana–Gorakhpur–Siliguri direct route, approved. This includes "Bareilly-Ludhiana Economic Corridor".
Ludhiana–Rupnagar Expressway (Ludhiana–Chandigarh Expressway), 91 km, 4-lane (expendable to 6), INR2792 cr, greenfield, from Manewal village on the Delhi–Amritsar Expressway to Bheora village near Rupnagar (Ropar) & a 19.5 km spur to Kharar, by NHAI, under-construction (March 2024 completion).[3]
Upper Ganges Canal Expressway, 150 km, 8-lane, greenfield, Haridwar to Purkazi (Muzaffarnagar) to Sanauta Bridge (Bulandshahr), under-construction (?? completion).
Ganga Expressway, 594 km, 6-lane (expandable to 8), INR37359 cr, greenfield, Purkazi (Muzaffarnagar) to Varanasi–Prayagraj–Ghazipur, under-construction (March 2024 completion).
Meerut Spur: greenfield, from Ganga Expressway to Bijauli village on NH-334 in Meerut district, under-construction (March 2024 completion).
Purvanchal Expressway, 340 km, 6-lane (expandable to 8), INR22494 cr, from Lucknow (Chand Serai) to Ghazipur (Haydaria), operational.[8]
Gorakhpur Link Expressway, 91 km, 4-lane (expandable to 6), INR5876 cr, greenfield, from Purvanchal Expressway at Azamgarh (Salarpur) to Gorakhpur (Jaitput), under-construction (December 2023).[8]
A4. Across Southern Uttar Pradesh (east to west): Delhi–Agra–Chitrakoot route, approved.
Jhansi Link Expressway, under-construction (see below).
B. Inter-corridors (north to south): approved.
In September 2023 the up government approved 7 North South corridos which will be combination of upgrade of 2000 km brownfield and 600 km greenfield routes. This will bring the cost of logistics down to 10%, which was 15% in 2023. Approved north-south corridors are, Bijnor-Lalitpur, Moradabad-Agra, Pilibhit-Mahoba, Lakhimpur Khiri-Chitrakoot, Gonda-Prayagraj and Basti-Mirzapur.[10]
B3. Pilibhit–Mahoba route: approved in Sept 2023.[10]
B4. Lakhimpur Khiri–Chitrakoot route: approved in Sept 2023.[10]
B5. Gonda–Prayagraj route: approved in Sept 2023.[10]
B6. Basti–Mirzapur route: approved in Sept 2023.[10]
B7. Gorakhpur–Varanasi–Kolkatta route: approved.
Gorakhpur Link Expressway, 91 km, 4-lane (expandable to 6), greenfield, from Purvanchal Expressway at Azamgarh (Salarpur) to Gorakhpur (Jaitpur), under-construction.[8]
C. Inter-corridors (north to south): partially approved or not yet approved.
C1. Baghpat–Gangoh–Yamunanagar–Nahan route with Gangoh–HathiniKund spur: proposed, not yet approved.
Baghpat, between Barout–Chhaprauli, Kairana, Gangoh greenfield.
Gangoh–Yamuna bridge: on existing Ambala–Shamli Expressway.
Yamuna bridge to Yamunanagar, greenfield.
Yamunanagar (Bhambholi)–Sadhuraha greenfield,
Sadhuraha–KalaAmb–Nahan, upgrade brownfield.
C2. Bareilly–Chandausi–Anupshahar–Bulandshahr–Delhi route: not yet approved.
Bareilly–Bulandshahr brownfield upgrade, not yet approved.
C3. Nepal–Bareilly–Jewar–Hodal–Punhana route: not yet approved.
Nepal–Bareilly–Jewar Expressway, greenfield, from (Nepal) via Palian Kalan-Bareilly(Faridpur, Dechara, Bisoli)-Babrala-Bhimpur-Khurja to Jewar, proposed, not yet approved.
C4. Khatima–Bareilly–Etawah to Gwalior–Kota–Mumbai route: partially approved.
Khatima–Bareilly–Etawah Expressway, greenfield, via Khatima–Bareilly–Bhasrala (Badaun)–Patiyali–Kurawali (Mainpuri) to Etawah (to Atal Progress-Way), proposed, not yet approved.
Atal Progress-Way (Chambal Expressway), 404 km, 4-lane (expandable to 6), greenfield, from Etawah (Nanawa) in Uttar Pradesh to Kota (Seemalya at Delhi–Mumbai Expressway) in Rajasthan with a spur to Gwalior in Madhya Pradesh, under construction (?? completion).
C8. Varanasi–Ambikapur–Raigarh–Sonepur–Vishakhapstnam route: not yet approved.
Gorakhpur–Varanasi then to Ambikapur–Raigarh–Sonepur and at Sonepur merge with "Nepal (Siddharthnagar)–Kushinagar–Ballia–Buxar–Vishakhapstnam route", greenfield & upgrade of brownfield, proposed, not yet approved.
C9. Nepal (Siddharthnagar)–Kushinagar–Ballia–Buxar–Vishakhapstnam route: not yet approved.