You can help expand this article with text translated from the corresponding article in Japanese. (December 2008) Click [show] for important translation instructions.
View a machine-translated version of the Japanese article.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Japanese Wikipedia article at [[:ja:雨竜第一ダム]]; see its history for attribution.
You may also add the template {{Translated|ja|雨竜第一ダム}} to the talk page.
The Uryu Dam (雨竜ダム) is a dam complex in Hokkaidō, Japan on the Uryu River. It consists of two dams. It is a power generation dam managed by Hokkaido Electric Power Co., Inc., and is a gravity-type concrete dam with a bank height of 45.5 meters. Lake Shumarinai, which is an artificial lake, is more famous than a dam, but this lake is the largest artificial lake in Japan with a flooded area (the area of a dam lake). This record has not yet been broken since it was completed in 1943 (Showa 18) during the war.
Uryu No.1 Dam
Uryu No.1 (Re)(Japanese: 雨竜第一ダム(再)) is a gravity dam located in Hokkaido Prefecture in Japan. The dam is used for flood control and power production. The catchment area of the dam is 368.5 km2. The dam impounds about 2373 ha of land when full and can store 244700 thousand cubic meters of water. The construction of the dam was started on 2018 .[1]
Uryu No.2 Dam
Uryu No.2 Dam(Japanese: 雨竜第二ダム(元)) is a gravity dam located in Hokkaido Prefecture in Japan. The dam is used for power production. The catchment area of the dam is 109.7 km2. The dam impounds about 177 ha of land when full and can store 21589 thousand cubic meters of water. The construction of the dam was started on 1939 and completed in 1943.[2]