Tsongas Center at UMass Lowell (formerly Tsongas Arena[2]) is a multi-purpose facility owned by the University of Massachusetts Lowell and located in Lowell, Massachusetts. The arena was opened on January 27, 1998, and dedicated to the memory of the late Paul Tsongas, prominent Lowell native and U.S. senator. The arena was built with $4 million in funding from both the city and the university, plus another $20 million contributed from the Commonwealth of Massachusetts.[3]
The Tsongas Center, which seats approximately 6,500 for hockey and 7,800 for concerts and other events, is the site of major concerts and other public events, including job fairs, skating competitions and graduation ceremonies for area high schools, colleges and universities. It also hosts major university events, such as the annual Commencement ceremonies, Open House for prospective students and the Chancellor's Speaker Series. The series debuted in 2012 with bestselling author Stephen King. Also in 2012, the Tsongas Center was the site of a debate between then-incumbent U.S. Sen. Scott Brown and challenger Elizabeth Warren, which drew more than 5,000 people and was covered by more than 100 media outlets, including NBC News and MSNBC.
In 2010, Canadian rapper Drake notably performed a show at the Tsongas Center.[6]
UMass Lowell and the city of Lowell entered into negotiations in 2009 with the intent to transfer ownership of the arena and the land adjacent to it to the university. In late October 2009, it was reported that the deal had been reached with UMass Lowell committing to major renovations to the facility.[7] In a ceremony during a game against Boston University on October 30, 2009, the deal transferring ownership to the university was signed. UMass Lowell formally took control of the arena on February 5, 2010, after completing a $1 transaction.[8]
UMass Lowell has spent more than $5 million to renovate the arena since its acquisition. LED "ribbon" boards were installed in the winter of 2010. A new high-definition video scoreboard and sound system were installed during the summer 2010. A new club seating area was built in conjunction with a new upscale bar. In the summer of 2011, new ice-making equipment was installed, followed by new luxury boxes and press box in 2012.