Trypilska thermal power plant

50°08′06.2″N 30°44′53.2″E / 50.135056°N 30.748111°E / 50.135056; 30.748111

Trypilska TPP in 2015.

Trypilska TPP (Ukrainian: Трипільська ТЕС) was a 1800 MW thermal power station located on the Dnipro river, about 40 km downstream of the city of Kyiv, in Ukraine, built by the Soviet Union in 1969 and completed in 1977.

During the Russian invasion of Ukraine, the station was permanently disabled on 11 April 2024 after Russian missiles set fire to the main turbine hall.[1] It was the largest power plant in the Kyiv Oblast region.[2]

Operations

The main assets of the Trypilska TPP were four pulverized coal and two diesel fuel units with a capacity of 300 MW each. There were also six turbines and generators with a total nominal capacity of 1,800 MW. The transformers are of the TDC-400000/330 type.

The fuel facility consists of an open coal storage with a capacity of 280,000 tons, which was serviced by two portal cranes and bulldozers.

The main fuel was Donetsk anthracite coal, which arrived by rail and river to the station berth.

The station was connected to the gas transport system of Ukraine. Also, the fuel economy had containers for using fuel oil as fuel.

History

Kyiv Oblast is known for being energy-rich. Power-generating enterprises with a total capacity of 3,200 MW are located on its territory, of which the installed capacity of the Trypil TPP is about 57%. Therefore, the energy-generating enterprise is the largest supplier of electricity in Kyiv, Cherkasy and Zhytomyr Oblasts. The enterprise occupies an area of 281.3 hectares. It is located in Obukhiv Raion on the bank of the Kaniv Reservoir.

In January 1962, a Decree of the Council of Ministers of the Ukrainian Soviet Socialist Republic approved the development of a thermal power plant in the Trypilska site. The trusts "Pivdenteploenergomontazh", "Hydroelektromontazh", "Hydromechanization", "Pivdenzahidtransbud" and many others participated in the construction of the station. The first unit was connected to the grid in December 1969 and the plant was completed in 1977.

A great deal of work on the analysis of the project, start-up and adjustment of the equipment was performed by the enterprise "LvivORGRES".

The construction of the power plant was carried out by the progressive current-speed method. This method made it possible to significantly shorten the construction period of the power plant.

Russo-Ukrainian War

On 11 April 2024, the station was targeted with Shahed drones and Kh-69 missiles resulting in a massive fire. Subsequently, Ukraine's Centrenergo officially announced the complete destruction of the power plant.[3]

On 16 April 2024, President Zelenskyy said that "eleven missiles were launched towards the Trypillya [thermal power] station, upon which the electricity supply in the Kyiv region depends. We managed to intercept the first seven, but the remaining four hit Trypillya. Why? Because we had zero missiles left. We have exhausted all the missiles that were defending Trypillya".[4] In May 2024, the government allocated over 1.5 billion hryvnias for the restoration of the Trypilska and Zmiivska thermal power plants.[5][6]

See also

References

  1. ^ Sabbagh, Dan (13 April 2024). "Ukraine air defences overwhelmed as Russia pounds power stations". The Guardian. ISSN 0261-3077. Retrieved 13 April 2024.
  2. ^ Wilkinson, Peter (11 April 2024). "Largest power plant in Ukraine's Kyiv region destroyed in Russian attack". CNN. Retrieved 11 April 2024.
  3. ^ Balmforth, Tom (11 April 2024). "Major Russian air strikes destroy Kyiv power plant, damage other stations". Reuters.
  4. ^ "'Zero Missiles Left' - Zelensky Says Ukraine's Air Defence Resources Depleted". The Kyiv Post. 16 April 2024.
  5. ^ Kitsoft. "Cabinet of Ministers of Ukraine - Government allocates more than UAH 1.5 billion to restore critical TPPs: Prime Minister". www.kmu.gov.ua. Retrieved 18 July 2024.
  6. ^ "Уряд виділив 1,5 млрд гривень на відбудову двох великих ТЕС – DW – 17.05.2024". dw.com (in Ukrainian). Retrieved 18 July 2024.