Railway line in China
Tiandong–Debao railway Native name 田德铁路 Status Operational Termini Stations 3 (1 passenger) Type Heavy rail Opened
June 23, 2010 (2010-06-23 ) (freight)
29 January 2016 (passengers)
Line length 72.6 km (45 mi) Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in ) standard gauge Electrification 50 Hz 25,000 V Operating speed 120 km/h (75 mph)
The Tiandong–Debao railway (Chinese : 田德铁路 ) is a railway line in Baise , Guangxi , China . The single-track line is 72.6 kilometres (45.1 mi) long.[ 1] At its northern end, the line connects with the Nanning–Kunming railway . At its southern end, it connects with the Debao–Jingxi railway .[ 2] The only station on the line that is open to passengers is Debao railway station .
History
The line opened on 23 July 2010.[ 1] Passenger services were introduced on 29 January 2016.[ 3]
References
^ a b "广西田德铁路今日正式开通运营" [Tiandong–Debao railway opened today] (in Chinese). Xinhua News. 23 July 2010. Archived from the original on 23 November 2010. Retrieved 10 May 2021 .
^ "中国新建一条对接越南铁路 总投资12.5亿元" (in Chinese). China News. 12 October 2009. Retrieved 10 May 2021 .
^ "德保火车站开通客运服务" [Debao Railway Station opens passenger service] (in Chinese). 30 January 2016. Retrieved 10 May 2021 .