The construction of the center began on 28 February 2012.[1] The center construction topped out on 27 August 2014.[2] On 31 August 2016, the center facade was revealed.[3] The structure was constructed with a cost of NT$5.4 billion.[4] The center had a trial opening in March–May 2022 before it officially opened on 7 August 2022.[5]
Architecture
The center was designed by David Gianotten and Rem Koolhaas at Office for Metropolitan Architecture.[6] It has geometrical shapes with a total space area of 50,000 m2.[3][7] At the center, there is a cube-shaped structure. It also consists the sphere-shaped playhouse which has a capacity of 800 seats. The Grand Theater is an asymmetrical-shaped building which has a capacity of 1,500 seats. The Blue Theater for experimental performances has a capacity of 840 seats.[8] The building is owned by the Department of Cultural Affairs, Taipei City Government.[9]