On 1 June 1964, the line was curtailed to Cambrai, briefly reopening in 1967 to assist in the construction of the Swan Reach to Sedan pipeline.[2] The line was cut back further to Apamurra on 9 October 1987 and the line north of Apamurra was abandoned. In August 1995, work commenced to gauge convert the line south of Apamurra to standard gauge. In 2001, parts of the line between Apamurra and Cambrai were removed by the Pichi Richi Railway Preservation Society for use on its Stirling North to Port Augusta line.[5][6][7] The line reopened on 20 November 1995.[4][8] The railway line closed in 2005 due to poor track conditions.[citation needed]
Present day
The line's current owner Aurizon does not list the line as being open but it is available for access. The line has fallen into disrepair, being severed at several points for drainage and road surface improvements.