The facility is located on the northern shore of the Bay of Fundy and derives its name from the nearby headland situated at the easternmost part of Charlotte County, although the generating station itself is located within Saint John County. The generating station is administratively part of the local service district of Musquash, west of the city of Saint John.
The Point Lepreau Nuclear Generating Station is the only nuclear generating facility located in Atlantic Canada and the only operating Canadian nuclear power station located outside of Ontario. The facility consists of a single CANDUnuclear reactor, having a net capacity of 660 MW[1] (705 MW gross).[2]
History
Construction
The construction of a nuclear powered electrical generating station in New Brunswick had been discussed since the late 1950s. For over fifteen years, engineers from the New Brunswick Electric Power Commission[note 1] visited AECL's Chalk River Laboratories to keep abreast of the latest trends in the field.[3] Formal talks between the Government of New Brunswick and the Government of Canada began in 1972. Discussions accelerated the next year, in the midst of the 1973 oil crisis, as the provincial government began to seriously consider options for diversifying New Brunswick's electrical generation and reduce its reliance on oil. However, financing the venture was a problem since the province had a limited borrowing capacity.[4]
The borrowing capacity was solved by the federal government in January 1974 with the announcement of a loan program covering half the costs of a first nuclear plant in any province in Canada. Premier Richard Hatfield announced his intention to build a nuclear generating station in New Brunswick on 5 February 1974. Hatfield's Progressive Conservative Party was reelected in that fall's general election, despite misgivings of the nuclear generation plan by part of the population. In March 1975, Hatfield declared on television that the decision was final, and that the reactor would be built regardless of the ongoing environmental assessment process, in a move described by New Brunswick sociologist Ronald Babin as the "nuclear fait accompli policy".[4]
On 2 May 1975, the Atomic Energy Control Board authorized the construction of two 635-MW reactors on a site designed to host four in Point Lepreau, 20 km west of Saint John, New Brunswick's largest city at the time. The New Brunswick Electric Power Commission began the construction of one reactor, with an option for a second one.[4]
At its peak in 1979, the construction project employed 3,500 workers; 108 individual contracts out of 139 were granted to local businesses. Point Lepreau was licensed for operation on 21 July 1982, achieved criticality four days later and began commercial operations on 1 February 1983.[2]
The high rate of inflation over the life of the construction project, tense labour relations on the worksite and skyrocketing construction costs - all common traits of large public infrastructure projects of that period - tripled the early cost forecast in nominal terms. The estimated cost of C$466 million in 1974 increased to C$684 two years later and to C$895 in 1978.[5] At the time of its commissioning in 1983, the total cost was estimated at C$1.4 billion, excluding interest charges.[4]
Point Lepreau was finished in 1981. It operated until 2008, when it closed for a refurbishment until 23 October 2012, when it was first re-connected to the grid. This is the only operating nuclear reactor in Canada outside Ontario.
This was the only CANDU reactor built on the east coast of Canada; other CANDUs are in Argentina, South Korea, India, Pakistan, Romania and China.
Expansion plans considered
In 2007, Team CANDU, a consortium of Atomic Energy of Canada Limited, Babcock & Wilcox Canada, GE-Hitachi Nuclear Energy Canada Inc., Hitachi Canada Ltd and SNC-Lavalin Nuclear Limited[6] began a $2.5 million feasibility study regarding the installation of a new 1,100 MWe Advanced CANDU Reactor at Point Lepreau, to supply power to New England.[7][8]
In July 2010, the Government of New Brunswick, led at that time by the Liberal Party, signed an agreement with French nuclear manufacturer Areva to study the feasibility of a new light water nuclear plant on the Point Lepreau property. In September 2010 the Progressive Conservative Party gained power and the plan was shelved by the incoming premier shortly after the election.[9][10]
2008-2012 refurbishment project
Public debate
Point Lepreau's CANDU-6 reactor was designed to last 25 years and was scheduled to be mothballed by 2008. Public debate on the future of the plant began as early as 2000. At the time, NB Power estimated the refurbishment cost at C$750 million.[11]
In 2002, NB Power, with support from the Government and opposition, pushed for refurbishment. However, the New Brunswick Energy and Utilities Board ruled that "there is no significant economic advantage to the proposed refurbishment" of Point Lepreau and that "it is not in the public interest".[12]
In April 2004, a report[13] authored by former British Energy chairman Robin Jeffrey estimated the plant's refurbishment would cost $1.36 billion instead of the C$935 million figure quoted at the time by the provincial utility. Jeffrey's report made no recommendations on whether to undertake the plant's overhaul or not but advised New Brunswick decision makers to seek competitive bids for new fossil-fuel fired generation capacity.[14]
Despite being denied a federal grant to fund the project,[15] NB Power announced on 29 July 2005 that it was awarding Atomic Energy of Canada Limited a $1.4 billion (CAD) contract for refurbishing the generating station.[16]
Refurbishment work
The refurbishment of the power station began on 28 March 2008 and was originally scheduled to last 18 months with AECL as the lead contractor on the project, but the operation was marred by technical glitches, delays and incidents.[17][18] For instance, two 115-tonne turbine rotors, (not part of the AECL contract) worth C$10 million each, toppled a barge in Saint John Harbour while being transported to the plant on 15 October 2008. The part manufacturer, Siemens Canada Ltd., eventually sued four companies in an Ontario court, including J. D. Irving Ltd., for "gross negligence" in the incident.[19]
Estimates for the reopening of the plant had been revised several times. In January 2009, a 3-month delay was announced because of problems with the robotic equipment used to remove pressure tubes.[20] A second, 4-month delay was announced in July of the same year.[21] In October 2009, New Brunswick minister of Energy, Jack Keir, announced a tentative reopening by February 2011 and asked for federal money to cope with the unexpected cost of purchased power to replace the power ordinarily generated by the plant.[22] The situation is compounded by the strategic importance of the plant in NB Power supply plans, since Point Lepreau provides 4 TWh/year or between 25 and 30% of the provincial output.[2]
A few weeks later it was announced on 29 October 2009 that the Point Lepreau Nuclear Generating Station would be one of the assets that were to be included in the proposed sale of NB Power to Hydro-Québec.[23] On 24 March 2010 Premier Shawn Graham announced that the proposed sale had fallen through, citing Hydro-Québec's "concerns about unanticipated costs".[24] Graham's announcement was contested by analysts who blamed the collapse of the deal on the difficult political situation in New Brunswick, six months before a scheduled provincial election.[25][26]
According to leaked internal documents, the proposed sale of NB Power and a proposed post-refurbishment staff reorganization of the company had a negative impact on workers' morale at the Point Lepreau Nuclear Generating Station and was becoming a safety concern. Over 600 workplace injuries occurred at Point Lepreau between January 2009 and June 2010, including 7 "lost time", 13 "restricted work" injuries and 32 incidents requiring medical aid. According to the internal reports, delays were costing NB Power C$33 million a month: "C$11 million in capital costs and C$22 million for replacement power and interest".[27][28]
On 9 October 2010, NB Power announced that AECL would have to remove all 380 calandria tubes from the reactor and reinstall them a second time, an operation which took a year earlier in the refurbishment program.[18] The calandria tubes, roughly 7 m (23 ft) and 13 cm (5.1 in), form the boundary to the moderator tank (calandria) through which the fuel channels are installed. According to an internal report dated 30 June 2010, the problem "is likely the result of damage to the tube sheet bores caused by the cleaning operation in a previous work series".[29] According to an October 2010 estimate, the generating station was scheduled to be back on stream in the fall of 2012, three years later than first expected.[30][31]
First re-connected to the grid on 23 October 2012, on 23 November 2012 Point Lepreau restarted commercial power production with a final refurbishment cost approximately "$1 billion over its original budget".[32]
Advanced Small Modular Reactors
On 26 June 2018, the government of New Brunswick committed 10 million dollars toward the establishment of an advanced Small Modular Reactor Research Cluster. This was followed by announcements of the participation of ARC Nuclear (9 July 2018) and Moltex Energy (13 July 2018), each investing 5 million dollars to progress research and development of their advanced technologies. Since that time significant development has taken place, including discussions on establishing a supply chain within the province.
As indicated on 25 July 2019, NB Power envisions commercial demonstrations of both reactor types at the Point Lepreau site if these advanced technologies successfully complete Phase 2 of the CNSC Vendor Design review and their financial and project planning predictions continue to show promise.
New Brunswick participated in the development of the Pan-Canadian SMR Roadmap (November 2018), and is also collaborating with the provinces of Ontario and Saskatchewan pertaining to the development of deployment of Small Modular Reactor technologies as part of the Interprovincial MOU announced in December 2019.
The Point Lepreau Nuclear Generating Station achieved record levels of availability with a 10-year average of 93.11% and generated over 5,000 GWh/year of energy on a sustained basis for its first decade of operations.[1] However, numerous problems started to surface in the mid to late 1990s, due to poor maintenance and low investment.[35] In mid-January 1997, a leak near the reactor core forced a third shutdown in 2 years. The 75-day stoppage was caused by a cracked feeder pipe. The human error cost C$40 million in repairs and C$450,000/day to purchase replacement power from Quebec.[36]
Electrical Output
The graph represents the annual electricity generation at the site in GWh.
As of the end of 2023, the total lifetime output of the facility was 166,354 GWh.
Incidents
In 1990, assistant plant operator Daniel George Maston was charged after he took heavy water from the moderator system and added it to a cafeteria drink dispenser.[37] Eight employees drank some of the contaminated water.
In 1995, a plywood cover was left in the boiler after completion of a maintenance outage. When the heat transport pumps were restarted, the cover was sucked into the heat transport system where it caused catastrophic damage to one of the pumps. The cause of the incident was lack of control of temporary modifications, poor work management, lack of foreign material exclusion (FME) measures, and human error. There was no public safety significance to the event, since the reactor had been shut down long enough that decay heat power was below the level that required coolant flow. However, the breach of the pressure boundary at the damaged pump created a radiation hazard for workers, and debris in feeders, fuel channels and potentially other Heat Transport and Auxiliaries pipework could have created a significant safety hazard during at-power operation. The cost of pump repairs, and the production downtime caused by the incident and its cleanup, was significant. The incident also left wood and metal debris unrecoverable in the cooling system.[38] Maintenance incidents at Lepreau in 1995 cost the facility more than $50 million in repairs and replacement power.[39]
In 2011, a spill of heavy water in the reactor building triggered a radiation alert and evacuation. NB Power stated that the event did not pose significant impact to the public or environment. This was the first time the reactor building had ever been evacuated.[40]
^The company was renamed Énergie NB Power in the 1970s.
Footnotes
^ abInternational Atomic Energy Agency (30 November 2009). "Point Lepreau". Power Reactor Information System. Retrieved 11 October 2010.[permanent dead link]
^Government of New Brunswick. "Point Lepreau". New Brunswick Department of Energy. Archived from the original on 24 September 2010. Retrieved 11 October 2010.
^Penty, Rebecca (29 September 2010). "Alward to shelve Areva deal". Telegraph-Journal. Saint John, NB. p. B1. Archived from the original on 19 May 2011. Retrieved 21 October 2010.
^Linke, Rob (21 January 2009). "Lepreau to miss deadline". Telegraph-Journal. Saint John, N.B. p. A1. Archived from the original on 13 December 2009. Retrieved 7 November 2009.
^Casey, Quentin (28 July 2009). "Lepreau delay grows". Telegraph-Journal. Saint John, N.B. p. A1. Archived from the original on 27 February 2012. Retrieved 7 November 2009.
^Keir, Jack (5 October 2009). "Ottawa must come to table". Telegraph-Journal. Saint John, N.B. p. A7. Archived from the original on 27 February 2012. Retrieved 7 November 2009.
^Cousineau, Sophie (25 March 2010). "Une occasion manquée". La Presse (in French). Montreal. Archived from the original on 27 March 2010. Retrieved 25 March 2010.
Babin, Ronald (1984). L'option nucléaire (in French). Montreal: Boréal Express. ISBN2-89052-089-7.
Jeffrey, Dr. Robin (April 2004). Point Lepreau Refurbishment Review(PDF). Fredericton: New Brunswick Department of Energy. Archived from the original(PDF) on 16 August 2010. Retrieved 11 October 2010.
Bagian dari seri tentangBuddhisme SejarahPenyebaran Sejarah Garis waktu Sidang Buddhis Jalur Sutra Benua Asia Tenggara Asia Timur Asia Tengah Timur Tengah Dunia Barat Australia Oseania Amerika Eropa Afrika Populasi signifikan Tiongkok Thailand Jepang Myanmar Sri Lanka Vietnam Kamboja Korea Taiwan India Malaysia Laos Indonesia Amerika Serikat Singapura AliranTradisi Buddhisme prasektarian Aliran Buddhis awal Mahāsāṃghika Sthaviravāda Aliran kontemporer Theravāda Mahāyāna Vajrayāna Kon...
Daniel McKee Gubernur Rhode Island ke-76PetahanaMulai menjabat 2 Maret 2021WakilSabina Matos (nominee) PendahuluGina RaimondoPenggantiPetahanaWakil Gubernur Rhode Island ke-69Masa jabatan6 Januari 2015 – 2 Maret 2021GubernurGina Raimondo PendahuluElizabeth RobertsPenggantiSabina Matos (nominee)Walikota CumberlandMasa jabatan7 Januari 2007 – 6 Januari 2015 PendahuluDavid IwucPenggantiWilliam MurrayMasa jabatanJanuari 2001 – Januari 2005 PendahuluFrank G...
Artikel ini sebatang kara, artinya tidak ada artikel lain yang memiliki pranala balik ke halaman ini.Bantulah menambah pranala ke artikel ini dari artikel yang berhubungan atau coba peralatan pencari pranala.Tag ini diberikan pada Desember 2022. SemmeringbahnJalur kereta api Semmering dengan pemandangan pegunungan di sekelilingnyaOperasiPemilikPerusahaan Kereta Api Federal AustriaOperatorPerusahaan Kereta Api Federal AustriaData teknisPanjang lintas41 km (25,5 mi)Lebar sepur1.435...
2013 GEICO 400 Race details[1] Race 27 of 36 in the 2013 NASCAR Sprint Cup Series Chicagoland Speedway track layoutDate September 15, 2013 (2013-09-15)Location Chicagoland SpeedwayJoliet, Illinois, United StatesCourse Permanent racing facility1.500 mi (2.414 km)Distance 267 laps, 400.5 mi (644.5 km)Weather Temperatures up to 70.5 °F (21.4 °C); wind speeds up to 6 miles per hour (9.7 km/h)[2]Pole positionDriver Joey Logano Penske RacingTime 28.50...
Women's national association football team representing Algeria This article is about the women's team. For the men's team, see Algeria national football team. AlgeriaNickname(s)الأفناك (The Fennecs)[1]AssociationAlgerian Football FederationOther affiliationUAFA (Arab Nations)ConfederationCAF (Africa)Sub-confederationUNAF (North Africa)Head coachFarid BenstitiCaptainSofia GuellatiTop scorerNaïma Bouhenni (35)Home stadiumStade du 5 JuilletFIFA codeALG First colours Second...
Halaman ini berisi artikel tentang lokasi geografis. Untuk daerah otonom, lihat Kabupaten Kepulauan Tanimbar. Untuk kegunaan lain, lihat Tanimbar (disambiguasi). Patung nenek moyang masyarakat Kepulauan Tanimbar Kepulauan Tanimbar diperlihatkan berwarna merah Kepulauan Tanimbar atau Timur laut merupakan kumpulan pulau-pulau di Kabupaten Kepulauan Tanimbar. Beberapa pulau besar diantaranya Pulau Yamdena, Pulau Larat, Pulau Selaru, Pulau Sera, Pulau Wuliaru, Nitu, Wetar, Labobar, Molu, Maru dan...
Beauty pageant For the regional pageant in French Guiana, also known as Miss Guyane, see Miss French Guiana. Guyana's Miss WorldFormation1966TypeBeauty pageantHeadquartersGeorgetownLocationGuyanaMembership Miss WorldMiss SupranationalOfficial language EnglishLicense HolderNatasha MartindaleWebsite[1] Miss Guyana is the national Beauty pageant in Guyana where the Titleholder/National Winner represents Guyana at the Miss World competition. Guyana first placed at the Miss World competition in 19...
This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: William Ogilvie Ardglass – news · newspapers · books · scholar · JSTOR (August 2017) (Learn how and when to remove this template message) William Ogilviecaricature of William Ogilvie by his son in law, Charles LockBorn1740 Died1832 (aged 91–9...
En la película Godzilla (1954) aparece el kaiju más famoso, Godzilla. Kaiju (怪獣, kaijū?) es una palabra japonesa que quiere decir 'bestia extraña' o 'bestia gigante', pero es generalmente traducido al español como 'monstruo'. Específicamente, esta palabra es usada para referirse a las gigantescas criaturas que atacan o protegen al mundo o la humanidad en el género tokusatsu (cine de acción con profusión de efectos especiales), y que son mayoritariamente originarias de Asia. Actua...
American politician Charles Franklin SpragueMember of the U.S. House of Representativesfrom Massachusetts's 11th districtIn officeMarch 4, 1897 – March 3, 1901Preceded byWilliam F. DraperSucceeded bySamuel L. PowersMember of theMassachusetts State SenateIn officeJanuary 1895 - January 1897Preceded byFrancis William Kittredge[1]Succeeded byJoshua Bennett Holden[2]ConstituencyNinth Suffolk DistrictMember of the Massachusetts House of RepresentativesIn office1891-18...
Wisconsin State Fair Park as viewed from the WonderFair Wheel First Street at the Wisconsin State Fair Park as viewed from the SkyGlider The Wisconsin State Fair Park is a fairgrounds and exhibition center in West Allis, Wisconsin, a suburb west of Milwaukee. It has been the location of the Wisconsin State Fair since 1892. The fairgrounds are open year-round, hosting various expositions (many of them agricultural).[1] It also contains venues such as the Milwaukee Mile, the oldest cont...
Distretto rurale di Goringdistretto(EN) Goring Rural District LocalizzazioneStato Regno Unito Inghilterra RegioneSud Est Contea Oxfordshire AmministrazioneData di istituzione1894 TerritorioCoordinate51°30′36″N 1°05′24″W / 51.51°N 1.09°W51.51; -1.09 (Distretto rurale di Goring)Coordinate: 51°30′36″N 1°05′24″W / 51.51°N 1.09°W51.51; -1.09 (Distretto rurale di Goring) Superficie39,37[1] km² Abi...
Welsh mathematician and inventor of the equals sign Robert RecordeRobert Recorde (c.1512–1558)Bornc. 1510Tenby, Pembrokeshire, WalesDiedJune 1558 (1558-07)London, EnglandNationalityWelshAlma materUniversity of OxfordUniversity of CambridgeKnown forInventing the equals sign (=)Scientific careerFieldsPhysician and mathematicianInstitutionsUniversity of OxfordRoyal Mint Robert Recorde (c. 1510 – 1558) was a Welsh[1][2] physician and mathematician. H...
Constantino Pávlovich Románov Información personalNacimiento 8 de mayo de 1779 Tsárskoye Seló (Rusia) Fallecimiento 27 de junio de 1831 Vítebsk (Imperio ruso) Causa de muerte Cólera Sepultura Catedral de San Pedro y San Pablo de San Petersburgo Nacionalidad RusaFamiliaFamilia Casa de Holstein-Gottorp-Romanov Padres Pablo I de Rusia Sofía Dorotea de Wurtemberg Cónyuge Juliana de Sajonia-Coburgo-Saalfeld (1796-1820)Joanna Grudzińska (desde 1820juliano, hasta 1831juliano) Par...
Efek Stark dari atom hidrogen dalam medan listrik dengan nilai n=15 dan m=0 Efek Stark adalah pergeseran atau pemisahan garis spektrum atom menjadi beberapa komponen disebabkan oleh adanya medan listrik eksternal. Efek ini analog dengan efek Zeeman, yaitu pemisahan sebuah garis spektral menjadi beberapa komponen karena adanya medan magnet. Referensi E. U. Condon and G. H. Shortley (1935). The Theory of Atomic Spectra. Cambridge University Press. ISBN 0-521-09209-4. H. W. Kroto (199...
56th film festival edition in 2001 2001 Cannes Film FestivalOfficial poster of the 54th Cannes Film Festival.[1]Opening filmMoulin Rouge!Closing filmLes âmes fortesLocationCannes, FranceFounded1946AwardsPalme d'Or (The Son's Room)[2]Hosted byCharlotte RamplingNo. of films23 (En Competition)[3]24 (Un Certain Regard)10 (Out of Competition)20 (Cinéfondation)12 (Short Film)Festival date9 May 2001 (2001-05-09) – 20 May 2001 (2001-05-20)Webs...
Oreste BaraleBarale II alla Juventus nel 1930Nazionalità Italia Altezza173 cm Peso70 kg Calcio RuoloAllenatore (ex centrocampista) Termine carriera1942 - giocatore1962 - allenatore CarrieraGiovanili 19??-1924 Alessandria Squadre di club1 1924-1925 Alessandria0 (0)1925-1931 Juventus113 (2)1931-1937 Alessandria151 (2)1937-1940 Vigevano32 (1)1940-1942 Cantù? (?)1942-1943 Lecco? (?) Carriera da allenatore 1940-1942 Cantù1942-1947 Lecco1947-1948...
Constituency of the Andhra Pradesh Legislative Assembly, India TadepalligudemConstituency No. 62 for the Andhra Pradesh Legislative AssemblyLocation of Tadepalligudem Assembly constituency within Andhra PradeshConstituency detailsCountryIndiaRegionSouth IndiaStateAndhra PradeshDistrictWest GodavariLS constituencyNarasapuramEstablished1951Total electors208,490ReservationNoneMember of Legislative Assembly16th Andhra Pradesh Legislative AssemblyIncumbent Bolisetti Srinivas PartyJana Sena PartyEl...
مصرف الإجماع العربيمصرف الإجماع العربيمعلومات عامةالتأسيس 3 أغسطس 2003النوع بنك المقر الرئيسي بنغازي، ليبياموقع الويب alejmaabank.com المنظومة الاقتصاديةالصناعة بنكأهم الشخصياتالمؤسس عبد اللطيف محمد الزويتعديل - تعديل مصدري - تعديل ويكي بيانات مصرف الإجماع العربي شركة مساهمة ل�...