The Pittsburgh, Fort Wayne and Chicago Railway was a major part of the Pennsylvania Railroad system, extending the PRR west from Pittsburgh, Pennsylvania, via Fort Wayne, Indiana, to Chicago, Illinois. It included the current Norfolk Southern-owned Fort Wayne Line east of Crestline, Ohio, to Pittsburgh, and the Fort Wayne Secondary, owned by CSX, from Crestline west to Tolleston in Gary, Indiana. CSX leased its entire portion in 2004 to the Chicago, Fort Wayne and Eastern Railroad (CFE). The remaining portion of the line from Tolleston into Chicago is now part of the Norfolk Southern's Chicago District, with a small portion of the original PFW&C trackage abandoned in favor of the parallel lines of former competitors which are now part of the modern NS system.
History
The Ohio and Pennsylvania Railroad was chartered in Ohio on February 24 and in Pennsylvania on April 11, 1848, to build from Allegheny City (annexed by Pittsburgh in 1907) west to Crestline, Ohio, on the Cleveland, Columbus and Cincinnati Railroad. It was organized on June 15 with William Robinson Jr. as president,[1] and construction began on July 4, 1849. The first section, from Allegheny City west to New Brighton, opened July 30, 1851. Extensions opened to New Galilee on October 22 and Enon Valley November 19. On November 27, 1851, a section between Salem and Alliance, Ohio, was completed, not yet connected to the rest. On December 8, the east section was extended west to East Palestine, Ohio, with a stagecoach transfer provided for through travel. Further sections opened January 3, 1852, west to Columbiana, and on January 6 the gap between Columbiana and Salem was filled. In conjunction with the Cleveland and Pittsburgh Railroad, connecting at Alliance, a through line was provided between Cleveland and Pittsburgh. On March 11, 1852, an extension west to Massillon was opened with an excursion. On August 10, 1852, a further extension from Massillon west to Wooster opened. The line west to Mansfield was finished April 8, 1853, and the full line to Crestline opened April 11. With this it formed part of a through line to Cincinnati via the Cleveland, Columbus and Cincinnati Railroad.
The Ohio and Indiana Railroad was chartered in Ohio on March 26, 1850, and in Indiana on January 15, 1851, to extend the line west to Fort Wayne, Indiana. It was organized July 4, 1850, and work began in February 1852. Some of the capital was gained from a merger with the Great Western Railroad of Ohio in 1851. On August 26, 1853, the line opened from Crestline west to Bucyrus, and a continuation west to Forest opened in early January 1854. On June 10 the line opened west to Delphos, and on October 31 the full line to Fort Wayne was completed, opening the next day.
The Fort Wayne and Chicago Railroad was chartered in Indiana on May 11, 1852, and organized September 14, 1852, as a further extension west to Chicago. It was chartered February 5, 1853, in Illinois. The first section opened in February 1856 from Fort Wayne to Columbia City.
On July 26, 1856, the Pittsburgh, Fort Wayne and Chicago Rail Road was formed as a consolidation of the Fort Wayne and Chicago, Ohio and Indiana, and Ohio and Pennsylvania Railroads. Extensions opened west to Warsaw September 28, Plymouth November 10, Englewood, Illinois (south of Chicago) on November 29, 1858, and Van Buren Street in Chicago on December 25, 1858. On January 1, 1859, trains started running to Chicago, with a terminal at the future location of Union Station. The part west of Plymouth was built with rails removed from the New Portage Railroad.
On July 1, 1859, the PFW&C defaulted on its debts, and was sold at foreclosure on October 24, 1861. It was reorganized as the Pittsburgh, Fort Wayne and Chicago Railway February 26, 1862.
On July 1, 1869, the PRR leased the PFW&C and began operating it directly, but on April 1, 1871, the PFW&C was transferred to the newly formed Pennsylvania Company. On December 1, 1871, the Pennsylvania Company leased the Cleveland and Pittsburgh Railroad. Since January 25, 1860, the C&P had been operated jointly by itself and by the PFW&C, providing a branch of the PFW&C from Rochester, Pennsylvania, west and north, crossing the PFW&C at Alliance, Ohio, and continuing to Cleveland.
On February 1, 1968, the PRR was merged into Penn Central. The PFW&C stayed separate, filing for bankruptcy on July 14, 1973, over three years after Penn Central's 1970 bankruptcy. On April 1, 1976, the PFW&C became part of Conrail. Conrail downgraded the line, preferring other parallel lines. On June 2, 1994, the Norfolk Southern Railway bought 18 miles (29 km) from Gary to Valparaiso, which had been out of service since 1991, for $1.4 million. They soon bought 61 more miles (98 km), from Valparaiso east to Warsaw, and acquired trackage rights east to Fort Wayne.
At the western end of the route, the original PFW&C line has been abandoned from Buffington (an area of far northwestern Gary, Indiana, abutting East Chicago) northwest for a little over four miles to Whiting, Indiana; at both of these locations there are connections to the parallel tracks of the old Lake Shore and Michigan Southern Railway (New York Central Railroad). Northwest of Whiting, the LS&MS itself disappears, and the present-day line goes back to using the old PFW&C tracks, which run the rest of the way into Chicago, carrying both Norfolk Southern freight trains and several Amtrak passenger services.