The bridge was a replacement for a 66-foot (20 m) Howe truss design which failed a 1917 inspection by bridge inspector J. W. McArthur. He wrote, "An old bridge. Chords badly worm eaten. Downstream chord has been reinforced in middle by a timber bolted on. Wood is but little better than a powder from worm action. All signs indicate a new bridge in from 2 to 4 years."[2]
George W. Breeding constructed the present bridge at the same site in 1921 for $3,617,[2] equivalent to $61,800 today.[3] It is also a Howe truss and includes a 62-foot (19 m) eastern approach and a 17-foot (5.2 m) western approach. Roadwork in the mid-1970s realigned the road to bypass the bridge, being accessible only to pedestrians afterwards. A dedication ceremony was held November 17, 1986, to reopen the renovated span to vehicle traffic with a 10-short-ton (9,100 kg) load limit.[2]