The Osmangazi Bridge (Turkish: Osmangazi Köprüsü) is a suspension bridge spanning the Gulf of İzmit at its narrowest point, 2,620 m (8,600 ft). The bridge links the Turkish city of Gebze to the Yalova Province and carries the O-5 motorway across the gulf.
Construction and operation of the bridge was awarded to a joint venture (NOMAYG JV) formed by five Turkish companies (Nurol, Özaltın, Makyol, Yüksel and Gocay) and one Italian construction company Astaldi following the international Build–operate–transfer tender that took place in April 2009.[4][5] In 2010, a contract was signed for the project that was estimated to cost ₺11 billion for the entire highway from Gebze to Bursa.
On 30 March 2013 Prime minister Recep Tayyip Erdoğan laid the ground stone for the bridge.[6] After the completion of the bridge, the distance between Istanbul and İzmir shortened by about 140 km (87 mi), bypassing the lengthy distance around the Gulf of İzmit. The 420 km (260 mi) highway and bridge reduced the travel time between the two major cities from around six hours to five. The bridge and connecting highway provides three lanes of traffic in each direction. Construction was completed on 30 June 2016.[7][8]
Two lanes of high-speed railway were also planned to run through the middle of the bridge, but were scrapped in favor for a fourth lane for both ways. The decision lead to criticism and sparked people being suspicious of politicians being involved with automobile lobbyists.[9]
EPC Bridge Contractor
The US$1 billion privately financed bridge was awarded to the Japanese firm IHI Infrastructure System Co. on 16 July 2011 as EPC basis with FIDIC Silverbook contract. IHI, which was one of the contractors of second Bosphorus bridge, also completed the seismic reinforcement projects for Halic and Mecidiyekoy viaducts. IHI subcontracted the design works to Danish engineering design firm COWI A/S, which collaborated for the aesthetic design with Dissing+Weitling. Notice to proceed was given by NOMAYG JV to IHI on 1 January 2013 and the expected total project duration was 37 months.
On 21 March 2015 a catwalk broke away from its bolted joint cable on the south tower during the construction at the bridge and fell into the water. Added in February 2015, the catwalk was needed to allow workers access to the other side of the bay. No one was harmed by the accident as work was interrupted at this section due to windy weather. Marine traffic to and from İzmit Bay was suspended following the accident for security reasons and resumed after recovering the cable in the morning of 23 March.[12][13]
Kishi Ryoichi, the 51-year-old Japanese engineer of the IHI-Itochu Consortium, who was in charge of the construction at site, committed suicide after the accident. He was found dead at the entrance of a cemetery near his lodging in Altınova. He left a note saying that "...this failure ends my private and professional life. This project was mine and my country's pride. No one else is responsible for this failure."[8][13][14][15]
Tolls
As of 13 May 2023 the bridge tolls are (forex rate of 15 June 2023: USDTRY=23.67):[16]
Vehicle class
Toll ₺ (TRY)
Toll $ (USD)
Vehicles with 2 axles, wheelbase <3.2m
184.50
7.79
Vehicles with 2 axles, wheelbase >3.2m
295
12.46
Vehicles with 3 axles
350
14.78
Vehicles with 4 or 5 axles
464.50
19.62
Vehicles with 6 or more axles
585.50
24.73
Motorcycles
129
5.45
In popular culture
The five-time Supersport World championKenan Sofuoğlu from Turkey made a show of a motorcycle speed trial in the early morning of 30 June 2016, right before the official opening of the bridge. He crossed the 1.5 km (0.93 mi) distance in 26 seconds reaching a top speed of 400 km/h (250 mph) on his Kawasaki Ninja H2R track-only motorcycle.[17][18]