With the exception of a short loop in downtown Santa Ana, the line will be double-tracked for its entire length. Most of the route follows the original path of the Pacific Electric Railway "Red Cars" that served Santa Ana in the early 20th century, before being abandoned in 1950. Construction on the streetcar broke ground on November 30, 2018.[3] As of October 2023, the line's expected revenue service date has been pushed to August 2025, per OCTA staff, despite initial plans for a 2021 start.[5]
From the train station, the streetcar route runs west along Santa Ana Boulevard to downtown Santa Ana and the Santa Ana Civic Center, the main administrative center for the City of Santa Ana and the County of Orange, where an estimated 38,000 jobs are located.[7] The route will split at Mortimer Street onto existing one-way streets with westbound service continuing on Santa Ana Boulevard through Civic Center, while returning eastbound service will travel on 4th Street (two blocks south), through the Arts District.[8]
After rejoining at Ross Street near the Santa Ana City Hall, the line will continue west along Santa Ana Boulevard to Raitt Street, where it will continue on the former Pacific ElectricWest Santa Ana Branch right-of-way along the north side of 4th Street. Turning northwest, the line will cross over the Santa Ana River and Westminster Avenue on bridges.
At the northwest end of the line, it will briefly enter the city of Garden Grove where an intermodal transit center will be constructed at the line's terminus at the intersection of Westminster Avenue and Harbor Boulevard.[8][9] The transit center will connect streetcars to OCTA's Harbor Boulevard bus routes, which are the busiest in the county, accounting for about 8 percent of OCTA's ridership[10] and Westminster Avenue bus routes.
Operations and infrastructure
The streetcar will operate as a curbside, street running system between the Santa Ana station and Raitt Street; west of there, it will operate in a dedicated right-of-way.[11] The streetcar is proposed to operate from 6 a.m. to 11 p.m. Monday through Thursday; 6 a.m. to 1 a.m. on Fridays and Saturdays; and 7 a.m. to 10 p.m. on Sundays and holidays.[6] Trains will run every 10 minutes between 6 a.m. and 6 p.m., and every 15 minutes at other hours.[11] A single trip from end-to-end on the 4.15-mile (6.68 km) line is expected to take 22 minutes, an average speed of 11.3 miles per hour (18.2 km/h).[12]
The route will include 10 stations in each direction, which will connect to 18 existing OCTA bus lines.[4] Each station will include platforms near major cross streets.[6] The route will be double-tracked for its entire length.[13] The maintenance and storage facility will be located adjacent to 5th Street near the eastern terminus of the Pacific Electric right-of-way at Raitt Street.[4] The Harbor and Raitt stops will include park and ride lots in addition to the existing parking structure at the Santa Ana train station.[14]
Although the former Pacific Electric rail bridge over the Santa Ana River still exists, it is single-track and considered structurally inadequate due to its age. A new double-track bridge is being built parallel to the old bridge. In addition, the line will cross Westminster Avenue on an elevated bridge to reach the Harbor Transit Center in Garden Grove.[11]
Eight Siemens S700[15][a] light rail vehicles will service the route, with six in operation at any one time.[6]Overhead lines will deliver power to the trains at 750 volts, direct current.[11] OCTA projects a daily ridership of between 6,000[9] and 7,300[6] passengers, and each streetcar's total capacity is up to 180 people.
The OC Streetcar will use a proof-of-payment system, requiring valid payment before boarding and lacking a turnstile barrier at stations. Fares will be purchased as paper tickets and passes at ticket vending machines at stations, or through a mobile ticketing app.
Fares will be the same as charged on OCTA's OC Bus service. Herzog Transit Services won the contract to operate the service in 2020.[16]
The streetcar will partially follow the historic route of the Pacific Electric interurban railway's Santa Ana Line, whose Red Cars operated between Santa Ana and Downtown Los Angeles via the West Santa Ana Branch right-of-way starting in 1905. The Santa Ana Line began at the old Southern Pacific Station (now demolished) at Terminal Street just south of the current Santa Ana train station, and traversed downtown Santa Ana via 4th Street.[18] Service to Orange County was terminated in 1950 due to the increasing use of automobiles and buses, and the original tracks through town were removed and paved over.[19]
West of downtown Santa Ana, the original 100-foot (30 m) wide right of way – purchased by OCTA after its abandonment – remains as a strip of vacant land extending diagonally across Orange County's cardinalstreet grid, from Santa Ana northwest to Cypress/La Palma on the Los Angeles County line. Although OCTA has allowed some temporary uses (such as parking) in the historic right of way, and most of the tracks have been removed, the authority always intended to return this corridor to transit use in the future.[18]
CenterLine proposal
As opposed to a streetcar system, the first proposals for a modern, second-generation light rail system serving north Orange County appeared in the 1990s. The CenterLine project would have created several light rail lines, including a main line running from Fullerton via Santa Ana to Irvine. It would have included service along the current OC Streetcar route between the Santa Ana train station and Bristol Street, but not along the diagonal West Santa Ana Branch right-of-way. Multiple branches were also proposed for the line to serve other areas of Orange County; most of the lines would have been elevated. The initial 1992 proposal called for 90 miles (140 km) of light rail, which due to political opposition was reduced to 32 miles (51 km) by 2001, and 9.3 miles (15.0 km) by 2004.[20] The CenterLine was opposed mainly due to its high cost (more than $1 billion for the 9.3-mile (15.0 km) segment between Santa Ana and John Wayne Airport) and was ultimately canceled in 2005.[13][21]
Current project and construction
A streetcar along the current, east-west route (the "Santa Ana-Garden Grove Fixed Guideway Corridor") was first proposed by OCTA in 2006.[6] The streetcar was the result of OCTA's "Go Local" initiative, which offered funds for Orange County cities to study potential new transit links to existing Metrolink rail stations.[13] The Measure M2 sales tax increase, also known as OC Go, will be partly used to fund transit projects in Orange County, was also passed in 2006. [13][22] In 2008, the cities of Santa Ana and Garden Grove partnered with OCTA to develop the project.[23] The design was modeled after street-running light rail services of the Portland Streetcar (Portland, Oregon) and TRAX (Salt Lake City, Utah).[6]
Environmental reports were completed and the project qualified for federal funding status by 2015.[21] Former President Barack Obama included $125 million for OC Streetcar in the 2016-17 federal budget under the Major Capital Investments (New Starts) program.[24] In January 2017, Congress approved an additional $50 million in funding for the project, for a total of $175 million.[6] The streetcar was also one of the "Top 10 State Infrastructure Projects" that Governor Jerry Brown has recommended for expedited federal review.[25] The total funding would be 72.2 percent from the federal government, 8.6 percent from California's state cap and trade program, and 19.2 percent from the county sales tax.[26]
OCTA announced in September 2015 that HNTB Corporation would carry out design work.[27] The $15 million contract covered design of tracks, bridges, stations, associated utilities and the vehicle maintenance and storage facility.[28] In December 2016 OCTA released a request for proposals for the manufacturing and delivery of the light rail vehicles.[29] Construction is planned to start in 2018, and revenue service was expected to begin in 2020.[4] In March 2018, OCTA placed an order for 8 S70 vehicles (later rebranded as S700 by Siemens),[a] at a cost of $51.5 million.[30] By July 2018, costs had increased to a projected $407.76 million (up from an estimated $299.3 million as of June 2017[6]) with an expected completion in 2021.[31]
On September 24, 2018, OCTA awarded a $220.5 million contract to Walsh Construction Company to build the streetcar.[32]
On November 30, 2018, a groundbreaking ceremony was held, and the Federal Transit Administration announced that federal funding would be increased to $217 million.[33]
The line was expected to start operations in 2021, but the project has faced delays and setbacks, including the discovery of human remains at a construction site in September 2020[34] and lawsuits from Walsh Construction Company in March 2022.[35] As of October 2023, OCTA staff will report a revenue service date of August 2025 to the Federal Transit Administration.[5]
Future expansions
Santa Ana mayor Miguel Pulido has suggested the OC Streetcar system could become "the hub of a light-rail system that could connect the county’s core," with potential future extensions to Disneyland, Anaheim's Platinum Triangle and the John Wayne Airport.[36][37] An extension north to Anaheim along Harbor Boulevard could connect with the controversial Katella Avenue streetcar project (Anaheim Rapid Connection), should that project be built in the future. Although the Anaheim City Council rejected the Katella streetcar in January 2017,[38][39] OCTA has listed a streetcar connection in its Central Harbor Boulevard Transit Corridor Study, leaving the possibility that it could be built as a county project, rather than a city project.[10]
OC Streetcar is one of two current transit projects intended to use the historic West Santa Ana Branch, the other being a Los Angeles Metro RailSoutheast Gateway Line.[40] The two services are not planned to connect; however, the possibility of re-establishing service between Santa Ana and Los Angeles has been studied by the Southern California Association of Governments (SCAG) since 2012.[41] Restoring full service to the Pacific Electric Santa Ana Line via light rail would cost about $3 billion to construct, and is expected to serve about 80,000 riders daily.[42][43]
Impact
Reception of the streetcar has been mixed among business owners and residents along the proposed corridor. Supporters suggest that the project would increase property values and increase economic activity along the route, as has occurred with light rail projects such as the E Line in Los Angeles County. [7] Underutilized areas along the route could be reappropriated for denser transit-oriented development, reducing the need for automobiles among new residents.[21] The Willowick Golf Course in Garden Grove is being considered for redevelopment, potentially as a regional park with sports arenas and outdoor amphitheater, with mixed-used neighborhoods adjacent to a proposed stop on the streetcar route.[44][45] In addition, 17.8 percent of households in the service area do not own a car, and the streetcar would markedly improve their access to the regional transit system.[7]
However, some businesses have opposed the project, citing that customers might avoid the area during construction, and that the rail line would eliminate parking spaces and increase traffic congestion. In addition, low-income residents have expressed concern over the potential gentrification of their neighborhoods, and being unable to afford increased rents as a result of the rise in property value.[46] The streetcar project has been criticized for its high cost ($70 million per mile),[13] and the inflexibility of a fixed-guideway transit system to adjust to system changes, as compared to buses.[47]
^ abcdefCordoba Corporation (October 2012). "Appendix C: Community Impact Assessment"(PDF). Santa Ana-Garden Grove Fixed Guideway Corridor: Environmental Assessment / Environmental Impact Reports. City of Santa Ana. Archived from the original(PDF) on August 8, 2017. Retrieved August 7, 2017.
^Cordoba Corporation (August 18, 2011). "Appendix O: Engineering Drawing"(PDF). Santa Ana-Garden Grove Fixed Guideway Corridor: Environmental Assessment / Environmental Impact Reports. City of Santa Ana. Archived from the original(PDF) on August 8, 2017. Retrieved August 7, 2017.
МечетьБольшая ханская мечетькрымскотат. Büyük Han Cami Страна Россия/Украина[1] Регион Респ. Крым/АРК Город Бахчисарай Координаты 44°44′55″ с. ш. 33°52′55″ в. д.HGЯO Течение, школа суннитская Тип мечети Джума-мечеть Инициатор строительства Сахиб I Герай Дата постройки...
American politician Charles Sawyer12th United States Secretary of CommerceIn officeMay 6, 1948 – January 20, 1953PresidentHarry S. TrumanPreceded byW. Averell HarrimanSucceeded bySinclair WeeksUnited States Ambassador to BelgiumIn officeNovember 8, 1944 – November 20, 1945PresidentFranklin D. RooseveltPreceded byErnest de Wael Mayer (Acting)Succeeded byAlan G. KirkUnited States Ambassador to LuxembourgIn officeNovember 1, 1944 – November 20, 1945PresidentFrank...
Voce principale: Veloce Foot-Ball Club. Questa voce sull'argomento stagioni delle società calcistiche italiane è solo un abbozzo. Contribuisci a migliorarla secondo le convenzioni di Wikipedia. Segui i suggerimenti del progetto di riferimento. Veloce Foot-ball ClubStagione 1922-1923Sport calcio Squadra Veloce Taranto Allenatore Biagio La Neve Presidente Milziade Magnini Seconda Divisione4º posto nel girone pugliese di Lega Sud. 1921-1922 Si invita a seguire il modello di voce Qu...
English footballer Terry DysonPersonal informationFull name Terence Kent DysonDate of birth (1934-11-29) 29 November 1934 (age 89)Place of birth Scarborough, North Riding of Yorkshire, England[1]Position(s) WingerSenior career*Years Team Apps (Gls)0000–1955 Scarborough 1955–1965 Tottenham Hotspur 184 (41)1965–1968 Fulham 23 (3)1968–1970 Colchester United 56 (4)1970–1972 Guildford City 109 (0) *Club domestic league appearances and goals Tottenham Hotspur in 1960 with Dan...
Sculpture in Mexico City, Mexico El CaballitoThe sculpture in 2011El CaballitoLocation within Centro HistóricoArtistSebastiánYear1992 (1992)MediumSteel sculptureLocationMexico City, MexicoCoordinates19°26′10″N 99°08′58″W / 19.43608559°N 99.14942711°W / 19.43608559; -99.14942711 El Caballito, officially Cabeza de caballo (horse's head),[1][2] is an outdoor 28-metre (92 ft) tall steel sculpture by Sebastián (Enrique Carbajal) depi...
Major railway and metro station in Tokyo, Japan Shinjuku Station新宿駅The south side of Shinjuku Station in November 2022General informationLocationShinjuku and Shibuya wards, TokyoJapanOperated by JR East Keio Corporation Odakyu Electric Railway Tokyo Metro Toei Subway Connections SS01 Seibu-Shinjuku E01 Shinjuku-nishiguchi M09 F13 S02 Shinjuku-sanchōme Shinjuku Expressway Bus Terminal Shinjuku Highway Bus Terminal Other informationStatusActiveHistoryOpened1 March 1885; 139 ...
Highest staff organization in the Hellenic Armed Forces Hellenic National Defence General StaffΓενικό Επιτελείο Εθνικής ΆμυναςEmblem of the Hellenic National Defence General Staff. The Corinthian helmet represents the Hellenic Army, the anchor the Hellenic Navy, and the wings the Hellenic Air ForceFounded1950CountryGreeceBranchArmed forcesTypeMilitary staffPart ofHellenic Armed ForcesHeadquartersMinistry of National Defence, Psychiko, Athens, GreeceMotto(s)Eve...
PesanggrahanKecamatanPeta lokasi Kecamatan PesanggrahanNegara IndonesiaProvinsiDKI JakartaKota AdministrasiJakarta SelatanPemerintahan • Camat-Populasi • Total- jiwaKode Kemendagri31.74.10 Kode BPS3171040 Desa/kelurahan5 Kecamatan Pesanggrahan yang terletak di Jakarta Selatan ini, merupakan hasil pemekaran wilayah kecamatan Kebayoran Lama, yang terletak di sisi barat. Kecamatan ini merupakan kecamatan terbarat di Jakarta Selatan dan juga mencakup kawasan Bintaro J...
Artikel ini tidak memiliki referensi atau sumber tepercaya sehingga isinya tidak bisa dipastikan. Tolong bantu perbaiki artikel ini dengan menambahkan referensi yang layak. Tulisan tanpa sumber dapat dipertanyakan dan dihapus sewaktu-waktu.Cari sumber: Fungsi eksponensial – berita · surat kabar · buku · cendekiawan · JSTORBagian dari serial artikel mengenaie Artikel mengenai e 2.718 281 828 459 045 235 360 287 … {\displaystyle 2.718\,281\,828\,4...
Weightlifting is one of the sports at the quadrennial Commonwealth Games competition. It has been a Commonwealth Games sport since 1950. It is a core sport and must be included in the sporting programme of each edition of the Games. A total of 17 events were contested at the 2010 Commonwealth Games in Delhi, 8 for men 7 for women and two powerlifting events. The first women's events were introduced in 2002. Between 1990 and 2002 a medal was awarded for each of the snatch and clean and jerk p...
الأسرة المصرية الثلاثون الأسرة المصرية الثلاثونعلم عاصمة سمنود نظام الحكم غير محدّد اللغة الرسمية اللغة المصرية الديانة ديانة قدماء المصريين التاريخ التأسيس 380 ق.م التأسيس 380 ق.م النهاية 343 ق.م تعديل مصدري - تعديل الأسرة المصرية الثلاثون عادة ما تصنف هذه الأس�...
Pour les articles homonymes, voir JSM. JSM Béjaïaⵉⵍⴻⵎⵣⵉⵢⴻⵏ ⵉⵏⴰⴷⴰⵍⴻⵏ ⵏ ⵜⴻⵎⴷⵉⵏⵜ ⵏ ⴱⴳⴰⵢⴻⵜ (ber) Généralités Nom complet Jeunesse Sportive Madinet BéjaïaIlemẓiyen inaddalen n temdint n Bgayetⵉⵍⴻⵎⵣⵉⵢⴻⵏ ⵉⵏⴰⴷⴰⵍⴻⵏ ⵏ ⵜⴻⵎⴷⵉⵏⵜ ⵏ ⴱⴳⴰⵢⴻⵜ Surnoms La JSMB Les lions de la soumam Tarwa n Yemma Gouraya Noms précédents Jeunesse Sportive Musulmane de Béjaïa Fondation 17 ma...
Artificial watercourse or aqueduct dug into the ground The Devonport leat near Nun's cross farm A leat (/ˈliːt/; also lete or leet, or millstream) is the name, common in the south and west of England and in Wales, for an artificial watercourse or aqueduct dug into the ground, especially one supplying water to a watermill or its mill pond. Other common uses for leats include delivery of water for hydraulic mining and mineral concentration, for irrigation, to serve a dye works or other indust...
Yiftahel Pre-Pottery Neolithic B flint arrowheads. Yiftahel (Hebrew: יפתחאל) is an archaeological site located in the Lower Galilee in northern Israel. Various salvage excavations took place here between 1992 and 2008. The best known periods of occupation are the Early Bronze Age I and Pre-Pottery Neolithic B. In the Early Bronze Age village ca. 20 oval and rounded structures were uncovered. This is regarded as the most typical village of its period in the southern Levant. The Pre-Potte...
Italian actress Elli ParvoBornElvira Gobbo(1915-10-17)17 October 1915Milan, Kingdom of ItalyDied19 February 2010(2010-02-19) (aged 94)Rome, ItalyOccupationActressYears active1934–1960 Elli Parvo (born Elvira Gobbo; 17 October 1915 – 19 February 2010)[1] was an Italian film actress. She appeared in more than 50 films between 1934 and 1960.[2] Selected filmography Loyalty of Love (1934) as La nobildonna al ballo The Ferocious Saladin (1937) as l'attrice truccat...
GhemicalA screenshot of Ghemical 3.0.0Developer(s)Ghemical authorsInitial release11 April 2000; 24 years ago (2000-04-11)[1]Repositorybioinformatics.org/cgi-bin/cvsweb.cgi/libghemical/ Written inC++Operating systemUnix-likeAvailable in?TypeComputational chemistryLicenseGPLWebsitehttp://bioinformatics.org/ghemical Ghemical is a computational chemistry software package written in C++ and released under the GNU General Public License.[2] The program has graphica...
American drummer (1945–2021) Roger HawkinsHawkins in 1980Background informationBorn(1945-10-16)October 16, 1945Mishawaka, Indiana, United StatesDiedMay 20, 2021(2021-05-20) (aged 75)Sheffield, Alabama, United StatesGenresSoul, R&B, RockOccupation(s)Session musicianInstrument(s)Drums, percussionFormerly ofMuscle Shoals Rhythm SectionMusical artist Roger G. Hawkins (October 16, 1945 – May 20, 2021)[1] was an American drummer best known for playing as part of the studio back...
يفتقر محتوى هذه المقالة إلى الاستشهاد بمصادر. فضلاً، ساهم في تطوير هذه المقالة من خلال إضافة مصادر موثوق بها. أي معلومات غير موثقة يمكن التشكيك بها وإزالتها. (نوفمبر 2019) الدوري المولدوفي الوطني 2006–07 تفاصيل الموسم الدوري المولدوفي الوطني النسخة 16 البلد مولدوفا ال�...
Town in Saxony-Anhalt, Germany Not to be confused with Wittenberge or Wittenburg. For other uses, see Wittenberg (disambiguation). Town in Saxony-Anhalt, GermanyWittenberg Lutherstadt WittenbergTown From top: View over Wittenberg old town,Inside the old town with aerial view to the historic All Saints' / Castle Church, (where Protestant / Evangelical Lutheranism Reformer, Dr. Martin Luther (1483-1546), attended, held Mass and nailed his proclamation notice of 95 Theses to the huge wooden fron...