The power station was commissioned in August 2019.[1]
Architecture
The power station was built on a 270 hectares of land.[2]
Technical specifications
The power station consists of 303,000 photovoltaic panels. Each of it generates 330 W.[1]
Finance
The power station was built with a cost of ₸27.7 billion. About ₸10 billion of it was financed by the Development Bank of Kazakhstan for 10 years loan.[1]