Initial studies ruled out Oroville as a potential terminus of the line, leaving a Chico station as the preferred alternative. Stations are planned in Natomas, Plumas Lake, Marysville, Gridley (with a bus connection to Oroville), and Chico.[4][5] Future plans include a connection to the Capitol Corridor in Sacramento.[citation needed]Capitol Corridor and North Valley Rail cross in Sacramento — North Valley Rail is primarily aligned to the north and south, while Capitol Corridor is largely aligned east and west.