National Highway 8 (NH 8) is a 4-lane (6-lane in most parts) National Highway in India. According to estimates, it is the busiest highway in the subcontinent, as it connects the national capital Delhi to the financial capital Mumbai, as well as important cities Gurgaon, Jaipur, Ajmer, Udaipur, Ahmedabad, Kheda, Nadiad, Anand, Vadodara, Surat, The total length is 1428km.[1] Under the new numbering it has become part of the NH48.
This Indo-Japanese multi-billion Corridor lies on National Highway-8. Delhi Mumbai Industrial Corridor Development Corporation Limited (DMICDC), the special purpose vehicle (SPV) floated by the government of India for implementing the DMIC projects, had appointed the consultant for undertaking a study on the master plan for the Manesar-Bawal Investment Region (MBIR) and undertaking pre-feasibility studies for two early bird projects. The Haryana government had identified four Early Bird Projects to be implemented as a pilot initiative within the DMIC region, which includes Mass Rapid Transportation System between Gurgaon-Manesar-Bawal, exhibition-cum-convention centre, integrated multi-modal logistics hub and new passenger rail link.[2] The first phase was completed by 2012 with an estimated $90 billion (Rs 4,23,000 crore) invested in developing infrastructure in the investment regions.[3]
Northern Peripheral Road or Dwarka Expressway
The Northern Peripheral Road (commonly known as Dwarka Expressway) is being developed under the public private partnership (PPP) model. This stretch will connect Dwarka with NH 8 (now renumbered National Highway 48 (India)|NH 48) at Kherki Dhaula and will intersect Gurgaon-Pataudi road.
Dwarka Expressway has been planned as an alternate link road between Delhi and Gurgaon, and is expected to ease traffic congestion on the Delhi-Gurgaon Expressway. The road will also provide connectivity to the Garhi Harsaru dry depot ICD.[4] It was planned to be completed in 2013 but has faced many hurdles as land on some sections has not been acquired. It has been declared a national highway and numbered NH 248-BB to overcome the hurdle of land acquisition as NHAI can acquire land directly bypassing the state governments. It may be completed in 2023.
^"Archived copy". Archived from the original on 10 April 2009. Retrieved 20 July 2011.{{cite web}}: CS1 maint: archived copy as title (link) Details of National Highways in India-Source-Govt. of India