Namanve Thermal Power Station

Namanve Power Station
Map
CountryUganda
LocationNamanve
Coordinates00°22′57″N 32°40′43″E / 0.38250°N 32.67861°E / 0.38250; 32.67861
StatusOperational
Construction began2008
Commission date2008
OwnerGovernment of Uganda
OperatorUEGCL
Employees43
Thermal power station
Primary fuelHeavy fuel oil
Power generation
Nameplate capacity50 MW

Namanve Power Station is a 50 MW heavy fuel oil-fired thermal power plant in Uganda. Sometimes the power station is referred to as Kiwanga Power Station.[1]

Location

The power plant is located in a locality known as Kiwanga, in Namanve in Mukono Municipality, Mukono District, in Central Uganda. This location is approximately 16 kilometres (9.9 mi), by road, east of Kampala, Uganda's capital and largest city.[2]

The plant is located in Kampala Industrial and Business Park, an 894 acres (362 ha), business and industrial development area. This location is off of the Kampala-Jinja Highway, in North Namanve. The coordinates of the power plant are:0° 22' 57.00"N, +32° 40' 43"E (Latitude:0.3825; Longitude:32.6786).[3]

Overview

Namanve Power Station was owned and operated by Jacobsen Electricity Company (Uganda) Limited, a wholly owned subsidiary of Jacobsen Elektro, an independent Norwegian power production company. The plant cost US$92 million (€66 million) to build. Funding was provided by several sources including: (a) The Government of Norway, through a Norad grant (b) Nordea Bank of Norway (c) Stanbic Bank Uganda and (d) Jacobsen Elektro. The plant uses heavy fuel oil, a byproduct of petroleum distillation. Construction of Namanve Power Station started in January 2008 and was completed in July 2008. Power production began in August 2008 on a trial basis, with commercial production commencing in September 2008. The power station was commissioned in November 2008. Jacobsen Elektro, the company that built the station, also owned it, for the first 13 years of the power station's life.[4][5]

The thermal power station was built under a build–own–operate–transfer (BOOT) model for 13 years. On 14 September 2021, Jacobsen Electro transferred ownership to Uganda Electricity Generation Company Limited, who now own, operate and maintain the power station.[5] Full and complete handover of the power station to UEGCL was effected on 24 February 2022, after the government of Uganda had compensated Jacobsen for certain expenditures, including "the money spent on buying land, unused fuel and spare parts".[6]

The power station has seven thermal generators each rated at 7.17 MW, for total installed capacity of 50.2 MW at maximum output. When there is no electricity emergency in the national grid, this power plant is operated at a baseline of 7 MW, to keep each of the seven generators running and ready. 43 full time employees operate the power station.[7]

See also

References

  1. ^ "Norwegian Firm To Build Thermal Plant In Uganda". ElectricityForum.com Quoting Xinhua News Agency. 2010. Retrieved 13 July 2014.
  2. ^ "Namanve Thermal Power Station" (Map). Google Maps. Retrieved 25 February 2022.
  3. ^ "Location of Kiwanga Thermal Power Plant, Uganda" (Map). Google Maps. Retrieved 25 February 2022.
  4. ^ Sylvia Juuko (6 November 2008). "Namanve plant reduces load-shedding". New Vision. Archived from the original (Archived from the original on 14 September 2012) on 2012-09-14. Retrieved 13 October 2021.
  5. ^ a b Stephen Otage (13 September 2021). "Govt takes over Namanve Thermal Power plant". Daily Monitor. Kampala, Uganda. Retrieved 13 October 2021.
  6. ^ Stephen Otage (24 February 2022). "Govt suggests it will not renew Eskom's contract". Daily Monitor. Kampala, Uganda. Retrieved 25 February 2022.
  7. ^ Paul Murungi (18 May 2022). "UEGCL cuts operational costs at Namanve power plant". Daily Monitor. Kampala, Uganda. Retrieved 18 May 2022.