With the route alignment connecting Shivmadka village in Nagpur district to Amane village in Thane district, the expressway is capable of providing an enhanced connectivity to the Marathwada and Vidarbha regions. The total project cost, including the land acquisition cost, is around ₹55,000 crore (equivalent to ₹580 billion or US$6.8 billion in 2023).[9][10] The Government of Maharashtra believes that the expressway will become a prosperity corridor for the overall socio-economic growth of the state.
Route alignment
The Mumbai–Nagpur Expressway will travel through 10 key districts directly and 14 districts indirectly[11] via feeder roads, 24 talukas, and 392 villages. The 10 main districts are Nagpur, Wardha, Amravati, Washim, Buldhana, Jalna, Aurangabad, Nashik, Ahmednagar and Thane. The other 14 districts include Chandrapur, Bhandara, Gondia, Gadchiroli, Yavatmal, Akola, Hingoli, Parbhani, Nanded, Beed, Dhule, Jalgaon, Palghar and Raigad.
Yavatmal City is going to Connect with Four Lane road to Samruddhi Expressway and Amravati too.Four Lane Road will be construct between Yavatmal City to Badnera.
[12]
Cities and towns
Below are the lists of cities/towns through which the Mumbai–Nagpur Expressway will connect:
To create a fast logistics gateway for national and international trade, the expressway will connect the country's largest container port JNPT[13] in Mumbai to Mihan in Nagpur. The expressway will allow access to several industrial and economic corridors through 24 interchanges[14] at strategic locations. It will widely connect the Delhi–Mumbai Industrial Corridor, Bengaluru–Chennai Economic Corridor, Western Dedicated Freight Corridor, Eastern Dedicated Freight Corridor, Chennai–Vizag Economic Corridor and Golden Quadrilateral. Apart from JNPT other seaports including Kandla MBPT, Mormugao, New Mangalore, Kochi, Chennai, Visakhapatnam and Ennore will also have indirect connectivity.
Characteristics and design
Characteristics
The project led by MSRDC will observe international road design and safety standards with an intelligent highway management system for traffic surveillance.
The expressway is designed for a top speed of 150 km/h at plain terrain and 120 km/h at hilly terrain even though the legal speed limit remains at 120 km/h for cars and 80 km/h for trucks enforceable by CCTV cameras, making it the fastest road network in the country which will cut down the travel time between the two cities to eight hours from the present 16-hour.
The Super Communication Expressway will considerably contribute 6% to the national trunk and freight infrastructure.
Nearly 36% of the state population will observe the Samruddhi Corridor as a substantial growth driver putting a direct positive impact on their livelihood.
The MSRDC has been authorized as a nodal agency – New Town Development Authority (NTDA) for developing 19 new townships along the route which will include state-of-the-art healthcare facilities, skill development centers, IT parks and educational institutions.
The expressway will pass through 3 wildlife sanctuaries including a 29.6 km passage through Katepurna Wildlife Sanctuary in Akola, 29.15 km through Karanja-Sohol Black Buck Sanctuary in Washim and 44.975 km through the Tansa Wildlife Sanctuary in Thane.
The Mumbai–Nagpur Expressway has been envisioned to ensure zero fatalities and will have CCTVs[15] and free telephone booths at every 5 km intervals in case of emergency situation.
Truck terminals in close proximity to industrial clusters, machinery and manufacturing units, agro-processing zones, and integrated cold-chain storage facilities will be planned to build export-ready and quick logistics infrastructure.
The HHBTMSM Expressway will have a separate provision for the optical fiber connectivity and gas pipelines turning the greenfield expressway[16] into a 'digital ready' utility corridor.[17]
Design
A single-layer concrete paver has been utilized for the whole 15-metre width of the concrete slabs[18] on either side of the road.
The expressway will be designed to aid as a runway[19] for airplanes to facilitate fast incident response in war-like situations, emergencies or natural disasters.[20]
An Integrated Traffic Management System will be deployed along the expressway to keep tabs on vehicles speeding, lane discipline or vehicular breakdowns.
At every 40–50 km of interval on the e-way, wayside amenities like food plazas and rest areas along with electric charging stations[21][22] for electric vehicles will be made available.
Extensive landscaping, tunnel lighting, bridge beautification, improved street lighting and digital signage will be used throughout the length of the expressway.[23]
Amongst the 32 major bridges[24] that shall be built along the expressway, 5 bridges at Nagpur, Wardha, Nashik, Buldhana, and Thane are proposed to have a theme-based iconic design.
To ensure digital readiness and resource availability, provisions will be laid down for optical fiber connectivity,[25] natural gas pipelines, and electricity grid along the Mahamarg at industrial townships.
With electric vehicle charging points[26] proposed at prospecting locations along the expressway and solar plants planned to generate 250MW energy, the Samruddhi Corridor aims to become a model of an energy efficient corridor.
Maximum locally available material, fly ash[27] and plastic will be used to construct the expressway wherever possible. Rain water will also be harvested at prospect locations along the expressway to ensure water availability.
The expressway will connect several tourism circuits offering eco, pilgrim, and heritage tourism which will include wildlife resorts, tiger safaris, museums, sightseeing destinations, and theme-based retail outlets.
The expressway is a 6 lane (with paved and unpaved shoulders on both sides) access-controlled super communication expressway comprising a total width of 120 m (90 m in hilly terrain) with a central median of 22.5 m.[28]
The expressway will be the country's largest 'Greenfield' route alignment including 65 flyovers/viaducts,[29] 24 interchanges, 6 tunnels,[30] 400+ vehicular, 300+ pedestrian underpasses, and cattle underpasses at strategic locations.
To expedite the pre-construction work on the expressway, MSRDC decided to divide the design work into 5 packages and hired a separate consultancy firm to prepare the Detailed Project Report (DPR) for each package. On 31 May 2017, the Government of Maharashtra incorporated 'Nagpur Mumbai Super Communication Expressway Limited', a special purpose vehicle (SPV) to manage the financial requirement for the construction and operation of this project.
As of 31 May 2021, out of the total 1699 structures including flyovers, viaducts, major and minor bridges, tunnels, interchanges, etc., construction of 1286 structures has already been completed and the construction of 253 structures are inching towards completion. Total 6 tunnels will be built along the expressway and the construction for all of the tunnels is underway in full swing.
New township development
The Government of Maharashtra has authorized MSRDC to act as the New Town Development Authority to venture into the long-term development of 19 new towns [39] at strategic nodes, which is also coined as 'Krushi Samruddhi Nagar.' The provisions are enacted under sub-sec (1) and section 113 of the MR & TP Act, 1966. The developmental objective to propose these new towns is to encourage the self-employment potential of the regional population through their primitive occupation i.e., agriculture or agro-related businesses.
Every township developed under the initiative of Krushi Samruddhi Nagar will be built in a land area of approximately 1000-1500 hectares. The new towns shall serve as the utility economic nodes for food processing industry, integrated logistics,[40] and domestic food markets along with education centers, skill development institutes, healthcare facilities, and commercial and residential housings. The new townships will offer huge industrial land-banks with a focus on dedicated export-oriented infrastructure and integrated logistics to ease supply chain with enhanced road connectivity for domestic markets.
The 19 new towns[41] will be developed at strategic intersections at a distance of 30 to 40 km[42] from each other. These towns will be developed in two phases; phase one includes seven townships while the remaining eleven townships will be developed in phase two. The new towns will encompass essential facilities including schools, Industrial Training Institutes (ITIs), skill development centers, institutes providing technical education and amp, higher education, hospitals, police stations, playgrounds, open spaces, parks and sports complexes. The new townships will be easily accessible from main roads, feeder roads, national or state highways intersecting the Samruddhi Expressway through the public transport system. The MSRDC adopted land pooling model[43] for land acquisition,[44] wherein 30 percent of the total land acquired under 'Krushi Samruddhi Kendra' program will be returned to landowners. The farmers will also receive compensation of Rs 50,000 per hectare for non-irrigated land and Rs 1 lakh every year for irrigated land for the next 10 years. Based on the suggestions from Wildlife Institute of India (WII), wildlife mitigation measures[45][46] are planned and necessary structures like cattle underpasses[47] are being built for uninterrupted wildlife movement. Around 320 private communicators[48] were trained and deployed by MSRDC for land acquisition negotiations with prospecting landowners.
Inter-connectivity
Following will either connect or act as an alternative to the Mumbai–Nagpur Expressway:
Nagpur–Vijayawada Expressway is part of Nagpur-Vijayawada Economic Corridor which will connect Nagpur-Chandrapur (part greenfield) to Mancherial-Warangal (greenfield), Warangal-Khammam (greenfield), Khammam-Vijayawada (part greenfield). The tenders were issued in November 2022, would be likely completed by the late 2024 or mid 2025.[49]
May 2018:MSRDC opened financial bids submitted by qualified contractors.[52]
May 2018: Government of Maharashtra gave its official approval for concession agreement for the project.
Jun 2018: Lowest bidders identified for 13 packages out of total 16. Bidding for remaining 3 packages to happen soon.[53]
Nov 2018: Land acquisition in progress. Work to be done in 16 packages, contractors for which are already identified. Work to start in December.[54][55]
Jan 2019: Contract awarded for all 16 packages by MSRDC to 13 contractors. Road construction started.[56]
Nov 2019:As of now, the expressway is 22% completed.[58]
Mar 2020: 86% of land acquisition is completed, with the expressway's paving also being underway.[59]
Jul 2020: 45% work completed. The 623 km stretch between Nagpur to Igatpuri is expected to be ready and opened by December 2021, while the 78 km stretch between Igatpuri to Amane is expected to be completed by May 2022.[60]
Oct 2020: The 520-km stretch from Nagpur to Shirdi is expected to become operational by May 2021, while the 623-km stretch from Nagpur to Igatpuri is expected is expected become operational by December 2021. The full expressway will become operational by May 2022.[61][62]
May 2021: The opening of 520 km long stretch from Nagpur to Shirdi is delayed. It is expected to become operational by September 2021.[63]
Jul 2021: 60% construction work of the 7.78 km long Igatpuri tunnel is completed as on 10 July. Once ready, it will be Maharashtra's longest road tunnel, and India's widest road tunnel.[64]
Aug 2021: Work on 7.78 km long Igatpuri tunnel to be completed by September-end.[65]
Sep 2021: The 7.78 km long Igatpuri tunnel is completed, and work is currently going on for the expressway's pavement and installation of lights. It is expected to be fully completed by December.[66]
Mar 2022: The Nagpur to Shirdi stretch of the expressway is expected to be opened by early May 2022.[67]
April 2022: From Shivmadka to Shelu Bazar (Washim district), the 210 km stretch of the expressway is expected to be opened by 2 May 2022.[68][69]
April 2022: The opening of the expressway has been delayed, due to damaging of the wildlife overpass near Nagpur.[70]
April 2022: Both Phase-1 and Phase-2 of the expressway are set to open by August.[71]
July 2022: The first leg of 520 km stretch from Nagpur and Shirdi is confirmed to be inaugurated on 15 August 2022. The remainder of the expressway from Shirdi to Mumbai was initially expected to be completed by the start of 2023, but this did not happen due to a delay. A new tentative date is 24 October 2023.[72]
December 2022: The first phase of the expressway from Nagpur to Shirdi was inaugurated and opened by Prime MinisterNarendra Modi on 11 December, while the second phase from Shirdi to Mumbai will be opened in June 2023.[73]
January 2023: The second phase until Mumbai will be opened in December 2023.[74]
May 2023: Another 80 km was opened from Shirdi to Bharvir Khurd near Igatpuri on May 26, 2023.[75]
March 2024: A further 24 km from Bharvir Khurd to Igatpuri was opened for traffic.
Accidents
01/08/2023 - 17 people were dead and 3 were injured when under-construction crane had collapsed on workers in Thane in early hours of Tuesday morning. PM Modi had announced 2 lakh exgretia for died.[76]
American skateboarder, screenwriter, film director Stacy PeraltaPeralta in 2005 holding a producer credit for The 1 Second FilmBornStacy Douglas Peralta (1957-10-15) October 15, 1957 (age 66)Venice, California, U.S.Occupation(s)Film director, entrepreneur, former professional skateboarderKnown forCo-founder of Powell PeraltaSpouses Joni Caldwell (m. 1989; div. 1990) Gemma Vizor (m. 2001) Children2, in...
Daily broadsheet newspaper in India For the bifurcated South Indian edition, see The New Indian Express. The Indian ExpressJournalism of CourageThe publication's 4 August 2009 front pageTypeDaily newspaperFormatBroadsheetOwner(s)Indian Express GroupPublisherIndian Express GroupEditor-in-chiefRaj Kamal Jha[1]Founded1932; 92 years ago (1932)Political alignmentCentre-leftLanguageEnglishHeadquartersB1/B, Express Building, Sector 10, Noida, Uttar Pradesh, IndiaSister news...
American politician (1855–1928) Warren Worth BaileyMember of the U.S. House of Representativesfrom Pennsylvania's 19th districtIn officeMarch 4, 1913 – March 3, 1917Preceded byJesse Lee HartmanSucceeded byJohn Marshall Rose Personal detailsBorn(1855-01-08)January 8, 1855New Winchester, IndianaDiedNovember 9, 1928(1928-11-09) (aged 73)Political partyDemocratic Warren Worth Bailey (January 8, 1855 – November 9, 1928) was a Democratic member of the U.S. House of R...
Spanish footballer and manager For the Canadian football linebacker, see Ramon Guzman. Ramón Guzmán Guzmán in 1929.Personal informationFull name Ramón Guzmán CarbonellDate of birth (1907-01-22)22 January 1907Place of birth Barcelona, SpainDate of death 1 April 1954(1954-04-01) (aged 47)Position(s) MidfielderSenior career*Years Team Apps (Gls)1928–1935 Barcelona 45 (1)1935 Mallorca International career1930 Spain 3 (0)Managerial career1941–1942 Barcelona *Club domestic league appe...
Covert distress signal Not to be confused with Dress code. A duress code is a covert distress signal used by an individual who is being coerced by one or more hostile persons. It is used to warn others that they are being forced to do something against their will. Typically, the warning is given via some innocuous signal embedded in normal communication, such as a code-word or phrase spoken during conversation to alert other personnel. Alternatively, the signal may be incorporated into the au...
Pour les articles homonymes, voir Aubois (homonymie). l'Aubois Cours d'eau à Grossouvre. l'Aubois sur OpenStreetMap. Caractéristiques Longueur 42,9 km [1] Bassin 214 km2 Bassin collecteur la Loire Débit moyen 0,732 m3/s (Grossouvre) [2] Régime pluvial Cours Source au lieu-dit la Thibaudrie · Localisation Augy-sur-Aubois · Altitude 212 m · Coordonnées 46° 46′ 55″ N, 2° 50′ 13″ E Confluence la Loire · Localisation Marseilles-...
Историческое государствоПротекторат ТонкинProtectorat du Tonkin Флаг Тонкин на карте Индокитайского Союза ← → 1884 — 1948 Столица Ханой Язык(и) вьетнамский Денежная единица Индокитайский пиастр Медиафайлы на Викискладе История Вьетнама Доисторические времена от 500 ...
6th governor of United Provinces Sir Maurice Garnier HallettGovernor of United ProvincesIn office7 December 1939 – 6 December 1945Governor of Bihar ProvinceIn office1937–1939Home Secretary to the Government of British IndiaIn office12 April 1933 – 1936Preceded bySir H. W. EmersonSucceeded bySir R. M. MaxwellChief Secretary to the Government of Bihar and Orissa ProvinceIn office1930 – 11 April 1933Secretary to the Government of Bihar and Orissa ProvinceIn off...
烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...
烏克蘭總理Прем'єр-міністр України烏克蘭國徽現任杰尼斯·什米加尔自2020年3月4日任命者烏克蘭總統任期總統任命首任維托爾德·福金设立1991年11月后继职位無网站www.kmu.gov.ua/control/en/(英文) 乌克兰 乌克兰政府与政治系列条目 宪法 政府 总统 弗拉基米尔·泽连斯基 總統辦公室 国家安全与国防事务委员会 总统代表(英语:Representatives of the President of Ukraine) 总...
Coney Island–Stillwell Avenue Bumper block at the end of the 42nd Street Shuttle tracks in Times Square station NYCS terminals Legend Terminal withseparated terminationand boarding platforms Terminal withsimultaneous boardingand alighting Terminal withthrough tracks Terminal onmiddle trackwith outerthrough tracks In the New York City Subway there are three types of terminal stations: Station where a train proceeds beyond the station, like at a non-terminal station, and returns to service o...
Artikel atau sebagian dari artikel ini mungkin diterjemahkan dari Universitas Seattle di en.wikipedia.org. Isinya masih belum akurat, karena bagian yang diterjemahkan masih perlu diperhalus dan disempurnakan. Jika Anda menguasai bahasa aslinya, harap pertimbangkan untuk menelusuri referensinya dan menyempurnakan terjemahan ini. Anda juga dapat ikut bergotong royong pada ProyekWiki Perbaikan Terjemahan. (Pesan ini dapat dihapus jika terjemahan dirasa sudah cukup tepat. Lihat pula: panduan pene...
Untuk kegunaan lain, lihat Blok M (disambiguasi). Blok M Blok M adalah kawasan bisnis dan perbelanjaan yang terletak di Kebayoran Baru, Jakarta Selatan, Indonesia. Tempat ini berbatasan dengan jalan Iskandarsyah di sebelah timur, jalan Bulungan di sebelah barat, jalan Falatehan di sebelah utara, dan jalan Melawai di sebelah selatan. Di tempat ini juga terdapat sebuah lokasi yang juga disebut sebagai Little Tokyo.[1] Referensi ^ Widito, Yoko (2021-04-17). Little Tokyo, Keajaiban Kecil ...
For the rocket engine, see LEROS. Municipality in GreeceLeros ΛέροςMunicipalityView of Panteli village in LerosLerosLocation within the region Coordinates: 37°09′N 26°51′E / 37.150°N 26.850°E / 37.150; 26.850CountryGreeceAdministrative regionSouth AegeanRegional unitKalymnosArea • Municipality74.17 km2 (28.64 sq mi)Highest elevation320 m (1,050 ft)Lowest elevation0 m (0 ft)Population (2021)[...
На протяжении более чем полувека микросхемные комплекты, а затем и микропроцессоры выпускались в различных корпусах; иногда с возможностью замены компонентов без пайки. О более современных корпусах микропроцессоров см. статью «Список разъёмов микропроцессоров». Содер...
Website FundlyType of siteCrowdfundingAvailable inEnglishURLfundly.comLaunched2009 Fundly is a crowdfunding site for online fundraising. It allows non-profits, charities, politics, clubs, schools, teams, churches, and other causes to raise money online from friends, family, colleagues, donors, and other supporters via email, Facebook, Twitter, LinkedIn, Google, and social media networks. It is also an app for social networks like Facebook and LinkedIn. It uses WePay to process donations....
Kamchatka redirects here. For other uses, see Kamchatka (disambiguation). Peninsula in the Russian Far East This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.Find sources: Kamchatka Peninsula – news · newspapers · books · scholar · JSTOR (August 2019) (Learn how and when to remove this message) Kamchatka Peninsulaполуо...
هذه المقالة يتيمة إذ تصل إليها مقالات أخرى قليلة جدًا. فضلًا، ساعد بإضافة وصلة إليها في مقالات متعلقة بها. (أغسطس 2021) لمعانٍ أخرى، طالع محمد إبراهيم (توضيح). محمد إبراهيم معلومات شخصية مركز اللعب الظهير الأيسر الجنسية لغة مصرية معلومات النادي النادي الحالي النجمة �...
Pour les articles homonymes, voir Calado. Cet article est une ébauche concernant l’endurance automobile et le sport automobile. Vous pouvez partager vos connaissances en l’améliorant (comment ?) selon les recommandations des projets correspondants. James Calado James Calado en 2023. Biographie Date de naissance 13 juin 1989 (35 ans) Lieu de naissance Cropthorne( Angleterre) Nationalité Britannique Carrière Qualité Pilote automobile FIA Platine Parcours AnnéesÉcurie...
A Little Too Not Over YouSingel oleh David Archuletadari album David ArchuletaDirilis6 Januari 2009 (2009-01-06) (diputar di Amerika Serikat)Direkam2008GenrePopDurasi3:18LabelJivePenciptaDavid Archuleta, Matthew Gerrard, Mike Krompass, Robbie NevilProduserMike Krompass, Robbie Nevil, Matthew Gerrard A Little Too Not Over You adalah singel kedua penyanyi asal Amerika Serikat, David Archuleta. Singel ini dirilis pada tanggal 6 Januari 2009.[1] Referensi ^ Salinan arsip. Diarsipkan ...