The Morrison Hill Swimming Pool was officially opened on 31 October 1972 by Sir Douglas Clague. The Royal Hong Kong Jockey Club donated over HK$8 million towards the complex's construction. At opening, the swimming complex comprised a heated 50-metre heated main pool, an outdoor pool, and a paddling pool for young children. It was designed by architect Sam Lim.[1] The pool was operated by the Urban Council until 2000.
A second indoor pool was opened to the public on 28 June 1982. It was the Urban Council's first indoor teaching pool, and the first in Hong Kong equipped with a ramp for the convenience of disabled people. It cost HK$5.2 million.[2]
Today, the swimming complex has four pools. Indoors, there is a 50-metre main pool with a 203-seat spectator stand, as well as a smaller training pool. The outdoor pool deck is home to a teaching pool and a toddler's pool.[3]
References
^"Heated pool will beat the chill". South China Morning Post. 31 October 1972. p. 8.