Milan–Bologna railway

Milan–Bologna railway
Map of the railway line
Overview
OwnerRFI
LocaleLombardy and Emilia-Romagna, Italy
Termini
Service
Operator(s)Trenitalia
History
Opened1859 (Piacenza–Bologna)
1861 (Milano–Piacenza)
Technical
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationElectrified at 3000 V DC
Route map

0.000
Milano Centrale
"passenger" line to Turin (slow / HS)
and Domodossola
3.779
Milano Lambrate
from Milano Centrale (old)
(closed 1931)
Milano Lambrate yard
goods line from Milan marshalling yard
Acquabella junction
Passante (Pioltello branch)
goods line to Milan marshalling yard
2.405
Milano Forlanini
(opened 2015)
Milano Porta Vittoria
(1911–1991)
Trecca turnout
9.567
208.751
Milano Rogoredo
Milano–Lodi tramway (closed 1931)
Approach to Autostrada del sole (A1)
206.609
San Donato Milanese
(opened 2003)[1]
San Donato double junction
204.543
Borgolombardo
(opened 1991)
202.610
San Giuliano Milanese
(opened in 1931)
197.912
Melegnano
Lambro river
Sordio junction
(1997–2005)[2]
(23.474)
Melegnano junction
(opened 2005)[2]
193.916
San Zenone al Lambro
(opened 1931)
(28.095)
190.409
Tavazzano
182.685
Lodi
170.775
Secugnago
163.832
Casalpusterlengo
(opened in 1861)
158.959
Codogno
(opened in 1861)
154.885
Santo Stefano Lodigiano
(opened in 1861)
150.721
Piacenza west junction
(opened in 2009)
A1E35
Piacenza bridge
Po river
A21E70
146.823
Left arrowLeft arrowPiacenza (SIFT)
Left arrowPiacenza (opened 1859)
FS-SIFT link
SIFT line to Bettola (closed 1967)
Nure torrent
137.995
Pontenure
Chiavenna torrent
131.864
Cadeo
125.212
Fiorenzuola
118.168
Alseno
(former station,
now passing loops)
Stirone torrent
111.754
Fidenza
Parola
102.150
Castelguelfo
A15E33
Left arrowPonte Taro
Left arrowLeft arrowfrom Salsomaggiore Terme
Fornace Bizzi
Crocetta
89.741
Parma
San Prospero Parmense
Enza torrent
78.878
Sant'Ilario d'Enza
72.871
Villa Cadè
(closed in 2013)[3]
Reggio viale Piave (FER)
61.435
Reggio Emilia
Villa Masone
49.585
Rubiera
Secchia river
deviation opened in 2014
from Dinazzano yard
(under construction)
45.049
45.700
Marzaglia freight yard
Modena Fiera
(fairground, not opened
41.598
GA21 Modena tunnel (1947 m)
future independent line from Marzaglia
Freto crossing loops
deviation opened in 2014
36.932
Modena
SEFTA line to Mirandola
(closed in 1964)
SV line to Ferrara (closed in 1956)
25.008
Castelfranco Emilia
18.996
Castelfranco east junction
17.130
Samoggia
12.735
Anzola dell'Emilia
13.623
Anzola crossover
9.522
Lavino
(former station,
now passing loops)
A14 (BolognaCasalecchio branch)
fiume Reno
4.158
Santa Viola
(crossing loops)
1.115
Lame underpass
Bologna Arcoveggio
0.000
Bologna Centrale
to Florence (via Apennine Tunnel)
to Florence (high-speed)
to Ancona
The long steel girder bridge over the Po at its opening in 1865 beside the temporary wooden bridge

The Milan–Bologna railway is the northern part of the traditional main north–south trunk line of the Italian railway network. It closely follows the ancient Roman Road, the Via Aemilia. The line was opened between 1859 and 1861 as a single-line railway, and was doubled between 1866 and 1894. It was electrified at 3,000 volts DC in 1938. High-speed trains on the route have used the parallel Milan–Bologna high-speed line since 13 December 2008.

History

The Milan–Bologna line was not built as it is now but was created out of the merger of two existing lines built at different times and for different purposes: it was formed by linking the line from Milan towards Piacenza with the line from Turin through Piacenza to Bologna, Florence and Rome.

The Kingdom of Lombardy–Venetia was until 1859 still part of the Austrian Empire and conceived concessions for the construction of railways, not so much for its commercial advantages as for military purposes and to bring together the various geographical regions of the empire. As early as September 1835 the Venice Chamber of Commerce had asked permission to form a company for the construction and operation of a railway line from Venice to Milan, but found it very difficult to obtain this "privilege".

Section Opening[5]
Piacenza-Bologna 21 July 1859
Milan-Piacenza 14 November 1861

The first railway in the region, the Milan–Monza line, was opened in 1840. The second line, opened in 1842, was the first section of the Milan–Venice line, fully completed in 1857. By that time railways were proliferating even in the Piedmont; in 1859 when Austria declared war on Sardinia the Piedmontese and Austrian networks had come close to the point where the bridge over the Ticino was subsequently built connecting Turin and Milan.

The Austrians were defeated and on 11 July 1859 signed the Armistice of Villafranca; Lombardy was annexed to the Kingdom of Sardinia and the Veneto remained Austrian. As a result, the Lombard rail network was separated from that of Austria[6] and therefore the nature of its development and operations changed. Instead of links with Venice, links with central Italy and the Adriatic Sea were promoted. The Treaty of Zürich signed on 10 November 1859 also included an agreement[7] that was the origin of the Società delle Strade Ferrate della Lombardia e dell'Italia Centrale (Lombardy and Central Italy Railway Company) and the Società delle Strade Ferrate dell'Austria meridionale e del Veneto (Southern Austria and Veneto Railway Company).[8] Both companies soon began building new lines and completing others: on 21 July 1859 the 146 km long Piacenza–Bologna line was opened, and on 14 November 1861 the 68 km long Milan-Piacenza section was opened[9] with a temporary wooden bridge over the Po. In 1863 a flood swept away the structures and the line was interrupted several times. The construction of a long steel girder bridge, completed in 1864, put an end to the insecurity of the rail link.

Meanwhile, Piacenza had already been connected to the Piedmont network in 1860 and the important Turin–BolognaAncona trunk route was completed in 1861. This line was extended to Foggia in 1863 and Brindisi in 1865.[10] The first crossing of the Apennine between Bologna and Florence, the Porrettana line, was completed in 1863.

In 1865 many small railway companies were merged into four large companies that took over the assets and lines along with the granting of new concessions. The Società delle Strade Ferrate della Lombardia e dell'Italia Centrale was merged with other Alpine and Apennine lines, becoming the Società per le strade ferrate dell'Alta Italia ("Upper Italian Railway", SFAI) with 2,092 km of lines in operation and 300 km under construction or proposed.

In 1871 with the opening of the Fréjus Rail Tunnel to rail traffic,[10] a mail train, the Indian Mail (known in Italian as La Valigia delle Indie) was routed over the line from Piacenza to Bologna; it operated weekly from London and Paris via Modane and Turin to Ancona and Brindisi, where it connected with steamships to India via the Suez Canal. In 1879 this became a passenger train, and later carriages were branded "CIWL" (Compagnie Internationale des Wagons-Lits) by agreement with the operator of the line, the SFAI. The commercial speed of the train, however, remained low at about 40 km/h, due to the condition of the line and its bridges.

The reorganisation of the Italian railways into four companies, however, gave rise to more problems than it solved, so in 1885 the railways were divided between two new companies, the Società per le Strade Ferrate del Mediterraneo — known as the Rete Mediterranea (Mediterranean Network) and comprising the lines west of Milan and on the Tyrrhenian coast, and the railways of Calabria and Basilicata — and the Società Italiana per le strade ferrate meridionali—known as the Rete Adriatica (Adriatic Network), comprising the remaining lines. These networks connected at various stations: Milan, Pavia, Piacenza, Parma, Pisa, Florence, Rome, Naples and Taranto. The Milan–Bologna line had been built as a single track, so it was divided between the two companies: passengers departed from Milan on a Mediterranean Network train and changed at Parma or Piacenza to an Adriatic Network train to reach Bologna.

Starting in 1890 the Adriatic Network agreed to the luxurious Peninsular and Oriental Express from London to Brindisi[11] operating on the line at up to 80 km/h. The line was later doubled, starting with the Piacenza–Parma section, and access to it was granted to both companies. The doubling started in 1866 and was completed in 1894. The line between Milan to Piacenza was originally not used much, except for local traffic; most travellers preferred to take direct trains between the "capitals" of Turin, Florence and Rome. The first daily direct connection between Milan and Rome started in 1880: the "1" Express. By the end of the century there were about ten expresses from Milan in each direction. The first section (Fornovo–Parma) of the Pontremolese line, connecting the Milan–Bologna line to La Spezia and the Tyrrhenian Sea was opened on 2 July 1883; the line was completed on 12 July 1894.

The line under Ferrovie dello Stato

When the state railway company, Ferrovie dello Stato, was established it inherited a diverse range of rolling stock from the former rail companies. Track was in a poor condition and the maximum speed on the line was 80 km/h and then only for specially-equipped trains, with slower speeds over bridges and points. Therefore, FS had to proceed with the reconstruction of bridges and viaducts, track and points in the stations, signalling and safety equipment.

Only after this work was finished in the 1910s could the new powerful Italian 690 Pacific steam locomotives be introduced; they were designed specifically for flat and fast lines but had a very high weight per axle compared to locomotives previously used in Italy. In the 1920s improvements to the line finally allowed train operation at up to 100 km/h for the fastest trains. Only in 1929 was the line adequate for loads of 20 tons per axle; even then this required slowing to 20 km/h on the long iron bridge over the Po near Piacenza until its replacement by a new bridge. After its opening, the average commercial speed on the line was raised to 87 km/h.

Starting in 1927, the Milan–Bologna line was the site of the first major trial of in-cab signalling, with the signalling information passed by magnets. This system was designed by the engineer Gino Minucciani. The successful experiment was followed in 1928 by the equipping of the line to Bologna for the repetition of two types of signals: stop and go; if the driver did not comply the braking system would be automatically applied. The 690 locomotives were equipped with this system.

In the late 1920s the limits of steam began to become clear, especially in terms of its high operating costs and its limited potential for further acceleration. It was decided to electrify the line at 3,000 volts direct current following excellent results achieved in experiments, although the Porrettana line between Bologna and Florence had been electrified with a three-phase alternating current system in 1927, and this system was proposed for the new Bologna–Florence direttissima. During the same period the ever-increasing traffic on the line, which had become the primary axis of the Italian railway network, began to saturate the capacity of the stations in Bologna, and a rail bypass was built to its north.

The bridge over the Po built in 1931 and rebuilt after the Second World War.

Following the electrification of the line in 1938, Minucciani's system of in-cab signalling was abandoned because it was considered too expensive to equip the electric locomotives with it. Instead FS tested a new system of automatic block signalling designed by Minucciani on a 110 km stretch of line. Although these tests were successful it was not implemented because investment in that period prioritized the speed and punctuality of trains for propaganda reasons rather than innovation in safety devices. In 1939 a train hauled by ETR 212 travelled from Milan to Bologna in just 77 minutes, while the normal speed for express trains had been reduced to 105 minutes.[12]

Recent projects

In 1991, a deviation of the line was activated between Milano Rogoredo station and San Giuliano Milanese station, on which the new stations of Borgolombardo and San Donato Milanese were built.[13] (the latter was only opened in 2003). This deviation was necessary to enable the construction of the "fast line" on the alignment of the original line.

The quadrupling of the section between Milano Rogoredo station and Sordio junction, just before San Zenone al Lambro station, was completed in 1997. However, due to the postponement of development work at Milan Rogoredo station, it was not possible to adequately upgrade rail services, in particular the planned suburban railway service.

In 2002, work began on the construction of the Milan–Bologna high-speed railway, which connects to the old line in the municipality of San Zenone al Lambro. The line from there to Milan had already been quadrupled. The high-speed line was opened in 2008, after the interconnection in Tavazzano was completed on 29 May 2005.[2]

The line from Milan Rogoredo to Lodi has been served by line S1 of the Milan suburban railway service since 13 December 2009.

Infrastructure

The line has two tracks built to 1,435 mm (4 ft 8+12 in) standard gauge, electrified at 3 kV DC, authorised for a maximum axle weight of 22.5 tonnes per axle, with a maximum grade on the Lombard section of 1.2% and authorised for a maximum speed of 230 km/h.[14]

Route

The line starts at Milano Centrale and runs along the belt railway, along with the lines to Venice and Genoa, passing through the stations of Milano Lambrate (where it separates from the line for Venice), Milano Forlanini and Milano Rogoredo, where it separates from the line for Genoa. The line between Rogoredo and San Giuliano Milanese has been doubled since 1991 with the construction of the fast line on the historic route and the building of the stations of San Donato Milanese (which was not actually opened until 2003[15]) and Borgolombardo.[13]

Since 1997, the line to Sordio junction (before San Zenone al Lambro) has been quadrupled by the construction of a new line that bypasses the town of Melegnano and that is used by traffic to and from the high-speed line.[16] Shortly after Melegnano, the historic line and the new line cross the river Lambro on two separate bridges.[17] After San Zenone, the line passes through Tavazzano station, which, since 2005, has been linked by the Interconnessione di Tavazzano (Tavazzano interconnection) between the historic line and the new line that it used by high-speed traffic.[2]

The section between Casalpusterlengo and Codogno is shared with the Pavia–Cremona railway. After Santo Stefano Lodigiano station, the railway crosses the Po in Piacenza over a bridge. which was built in 1931 and 1932 and replaced the previous single track bridge built in 1865; it consists of 11 pairs of iron beams, with a parabolic upper arch, six of these have a span of 74.52 m, and five of 61.02. Lines branch off in Piacenza to Alessandria and Cremona.

Near the city there are two links with the high-speed line: the Piacenza west interconnection,[18] located just before the bridge over the Po and the Piacenza east interconnection,[18] located just after the city.

After Piacenza the railway runs parallel to the Via Emilia (state highway 9) passing through Pontenure, Cadeo, Fiorenzuola d'Arda and Alseno. It enters the territory of Province of Parma, at Fidenza, where lines branch off to Cremona, Fornovo and Salsomaggiore Terme and there is an interconnection with the high-speed line.[18] The next station, Castelguelfo has a freight yard. The line arrives at Parma where lines branch off to La Spezia, Brescia and Suzzara, while to the east of the city, there is another interconnection with the high-speed line.[18] The line enters the Province of Reggio Emilia, which is the location of the stations of Sant'Ilario d'Enza, Reggio Emilia (the terminus of the three lines of the Ferrovie Reggiane) and Rubiera. The line enters the Province of Modena, where the lines to Mantua and Modena, and Sassuolo branch off in Modena station.

Frecciabianca service passing through Cavazzoli, Reggio Emilia

In November 2014, a deviation was opened between Rubiera and Modena that is more than 8.5 kilometres long, including an almost 2 km-long tunnel. This was built as part of the construction of the high-speed line and the simultaneous upgrade of the traditional line. The new route, located farther north than previously, avoids crossing the western part of Modena and is connected to the Verona line by means of a link line. Marzaglia freight yard was opened on the new line.[19] In Modena there are also two interconnections with the high-speed railway, one to the west and one to the east of the city.[18] After Castelfranco Emilia, the railway enters the Metropolitan City of Bologna, which includes the stations of Samoggia and Anzola dell'Emilia. The last interconnection with the high-speed line is near Lavino junction.[18] In the last kilometres before Bologna Centrale station, where the line ends, the railway runs parallel to the lines from Verona and Pistoia.

References

Footnotes

  1. ^ "San Donato, finalmente!". I Treni (in Italian) (255): 7. January 2004.
  2. ^ a b c d "Doppio salto di montone". I Treni (in Italian). XXV (272). Salò: Editrice Trasporti su Rotaie: 6. July–August 2005. ISSN 0392-4602.
  3. ^ "Impianti FS". I Treni (in Italian) (359): 8. May 2013.
  4. ^ Atlante ferroviario d'Italia e Slovenia [Italian and Slovenian railway atlas)] (1 ed.). Schweers + Wall. 2010. pp. 21, 34–5, 47–8, 141, 144. ISBN 978-3-89494-129-1.
  5. ^ "Prospetto cronologico dei tratti di ferrovia aperti all'esercizio dal 1839 al 31 dicembre 1926" (in Italian). Retrieved 17 August 2018.
  6. ^ Briano, Italo (1977). Storia delle Ferrovie in Italia (in Italian). Vol. I. Milan: Cavallotti. p. 75.
  7. ^ Raccolta dei Trattati e delle Convenzioni Commerciali in vigore tra l'Italia e gli Stati Stranieri (in Italian). Turin: Tipografia Favale. 1862. p. 806.
  8. ^ Annali Universali di Statistica, Economia Pubblica, Legisla. Storia, Viaggi e Commercio (in Italian). Vol. IV. Milan. October 1860. p. 212.{{cite book}}: CS1 maint: location missing publisher (link)
  9. ^ Kalla-Bishop, P. M. (1971). Italian Railways. Newton Abbott, Devon, England: David & Charles. p. 37.
  10. ^ a b Dalla Bayard all'ETR 300, Sommario storico delle ferrovie italiane (From Bayard to the ETR 300, Historical Overview of the Italian railways) (in Italian). Rome: Ferrovie dello Stato. 1961. p. 88.
  11. ^ Dalla Bayard all'ETR 300, Sommario storico delle ferrovie italiane (From Bayard to the ETR 300, Historical Overview of the Italian railways) (in Italian). Rome: Ferrovie dello Stato. 1961. p. 71.
  12. ^ Piccinini, Alberto. In orario, il manifesto. p. 12.
  13. ^ a b "Notizia flash". I Treni Oggi (in Italian) (117): 4. July 1991.
  14. ^ "Linea ferroviaria Milano - Bologna (tratta lombarda)]" (in Italian). trail.unioncamerelombardia.it. Archived from the original on 27 November 2015. Retrieved 18 August 2018.
  15. ^ "San Donato, finalmente!". I Treni (in Italian) (255): 7. January 2004.
  16. ^ "L'opzione ferroviaria" (PDF) (in Italian). provincia.cremona.it. Archived (PDF) from the original on 19 August 2017. Retrieved 18 August 2018.
  17. ^ Fumich, S. (2012). Brembio e Secugnago nei primi anni ottanta (in Italian). Brembio: Lulu. pp. 347–348.
  18. ^ a b c d e f "Da Milano a Bologna a 300 km/h" (in Italian). ferrovie.it. Archived from the original on 18 August 2018. Retrieved 18 August 2018.
  19. ^ "Modena, attivata la variante ovest" (in Italian). ferrovie.it. Archived from the original on 11 January 2015. Retrieved 18 August 2018.

References

  • Coletti, Giovanni (1978). Il passaggio delle ferrovie dall'amministrazione privata all'amministrazione pubblica nel 1905 (in Italian). CIFI.
  • Gallio, Silvio (2009). Oggi è un'ora di viaggio - La costruzione della strada ferrata tra Milano e Bologna (in Italian). Bologna: CLUEB. ISBN 978-88-491-3173-4.
  • Mascherpa, Erminio (1997). 691 compromesso vincente (in Italian). Salò: Editrice ETR.
  • Mascherpa, Erminio (1992). Ripetizione segnali e vigilanti (in Italian). Salò: Editrice ETR.

See also