It is a rolling lift type moveable bridge, and was prefabricated by the American Bridge Company, to replace a previous unsafe bridge on the site. It has a total length of 1,059 feet (323 m), divided into 11 spans. Seven of these are deck truss spans, while the others are deck girder spans, all set on stone abutments. The main movable span is 107 feet (33 m) long; four of the truss spans are 120 feet (37 m) in length.[4]
It is one of eight moveable bridges on the Northeast Corridor through Connecticut surveyed in one multiple property study in 1986.[5] In November 2024, the Connecticut Department of Transportation was awarded a $6.4 million federal grant to "explore options for replacement" of the bridge.[6]