The proposal met considerable opposition, despite the inadequacy and high costs of using horse drays and bullock wagons to carry merchandise from the port to the city. However, the combination of chaotic transport conditions and the extravagant financial prosperity that followed the gold rush led the community to realise the urgent need for railway communication on various routes, of which this one was prominent. The colony's pastoral somnolence was interrupted, never to recur, and a "railway boom" set in.[1]: 1
The line was constructed to 1600 mm (5 ft 3 in) "broad gauge" in keeping with an agreement between the three then extant colonies to adopt that gauge – subsequently abandoned by the government of New South Wales.[1]: 62
The first engineer for the line was William Snell Chauncy, but he was forced to resign in 1845 due to problems with his work, such as the failure of piles on the railway pier. James Moore C. E., a nephew of Sir William Cubitt (under whom he was engaged on the South Eastern and Great Northern railways in Britain; presumably he had learnt his trade there) was then appointed in March 1854 as Chief Engineer for the Hobson's Bay Railway company. It was said of Moore that he was a man of whose abilities rumour speaks favourably[2] and was responsible for designing the railway line between the city and the pier main deep-water pier on Hobson's Bay at Sandridge.
Work began on laying the railway in March 1853. Trains were ordered from Robert Stephenson and Company of the United Kingdom, but the first train was hauled by a 2-2-2WT locomotive built by local engineering works Robertson, Martin & Smith, because of shipping delays. Australia's first steam locomotive was built in ten weeks and cost £2,700.[3][4] The line was opened in September 1854 (three years after the discovery of gold at Ballarat) and ran for 4.2 kilometres (2.6 miles) from the Melbourne (or City) Terminus (on the site of modern-day Flinders Street station), crossing the Yarra River on the original Sandridge Bridge to Sandridge (now Port Melbourne).[5]
Opening
The opening of the line occurred during the period of the Victorian gold rush – a time when both Melbourne and Victoria undertook massive capital works, each with its own gala opening. The inaugural journey on the Sandridge line was no exception. According to the Argus newspaper's report of the next day: "Long before the hour appointed ... a great crowd assembled round the station at the Melbourne terminus, lining the whole of Flinders Street". Lieutenant-GovernorSir Charles Hotham and Lady Hotham were aboard the train – which consisted of two first class carriages and one second class – and were presented with satin copies of the railway's timetable and bylaws.[6]
The trip took 10 minutes, none of the later stations along the line having been built. On arriving at Station Pier (onto which the tracks extended), it was hailed with gun-salutes by the warships HMS Electra and HMS Fantome.[7]
Subsequent history
By March 1855, the four engines ordered from the UK were all in service, with trains running every half-hour. They were named Melbourne, Sandridge, Victoria, and Yarra (after the Yarra River over which the line crossed).
Despite high construction costs, the railway was an immediate success, carrying 270,000 passengers and 28,135 tons of goods in its first full year of operations.[8]
During the company's 13 years' existence, the average annual dividend of 71⁄2 per cent on working operations had resulted, equal to a return of nearly £49 on each £50 share.[1]