Network map of Dhaka Metro Rail
The Dhaka Metro Rail is a mass rapid transit system serving Dhaka , the capital city of Bangladesh . It is owned and operated by the Dhaka Mass Transit Company Limited .[ 1] Together with a proposed subway system it is expected to reduce traffic congestion in the city. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority .[ 2]
The network is planned to contain six lines, with the first section of MRT Line 6 commencing commercial operations on 29 December 2022, and the other lines being either in planning or under construction.[ 3] [ 4] The construction of MRT Line 6's second section is scheduled to be completed during 2023.[ 5] The third phase, which will have an interchange with Line 1 , Line 2 and Line 4, is set to be completed by 2026.[ 6] [ 7] [ 8] Further expansion of MRT Line 6 is planned, with the hope of extending it towards Tongi in Gazipur metropolitan and Savar Upazila . The fares range from minimum ৳20 to maximum ৳100 (for MRT line 6). Passengers can get 10% discount for paying fares on either MRT pass or Rapid Pass . Each of the cards has same facilities.[ 9]
Lines
Line(s)
Number of Stations
Planned Stations
Structure
Opening date
1
0
21
12 underground 9 elevated
Planned
2
0
25
Unknown
Planned
4
0
8
Unknown
Planned
5
0
29
Under Ground and Elevated
Unknown
6
16
17
Elevated
2022
Total:
N/A
N/A
Operational stations
This list is sortable. Click on the
icon in the column header to change sort key and sort order.
The list gives only operational stations, alphabetically-
Proposed and under-construction stations
MRT Line 1
Station Name
Status
Layout
Notes
Refs
English
Bengali
Aftabnagar *
আফতাবনগর
Under construction
Underground
Part of the Airport route
Airport
বিমানবন্দর
Under construction
Underground
Part of the Airport route
Airport Terminal 3
বিমানবন্দর টার্মিনাল ৩
Under construction
Underground
Part of the Airport route
Badda
বাড্ডা
Under construction
Underground
Part of the Airport route
Boalia
বোয়ালিয়া
Under construction
Elevated
Part of the Purbachal route
Joar Sahara
জোয়ার সাহারা
Under construction
Elevated
Part of the Purbachal route
Kamalapur *
কমলাপুর
Under construction
Elevated
Part of the Airport route
Khilkhet
খিলক্ষেত
Under construction
Underground
Part of the Airport route
Malibagh
মালিবাগ
Under construction
Underground
Part of the Airport route
Mostul
মস্তুল
Under construction
Elevated
Part of the Purbachal route
Nadda
নদ্দা
Under construction
Underground
Part of the Airport and Purbachal routes
North Badda
উত্তর বাড্ডা
Under construction
Underground
Part of the Airport and Purbachal routes
Notun Bazar *
নতুন বাজার
Under construction
Underground
Part of the Airport route
Purbachal Central
পূর্বাচল মধ্য
Under construction
Elevated
Part of the Purbachal route
Purbachal East
পূর্বাচল পূর্ব
Under construction
Elevated
Part of the Purbachal route
Purbachal Terminal
পূর্বাচল টার্মিনাল
Under construction
Elevated
Part of the Purbachal route
Purbachal West
পূর্বাচল পশ্চিম
Under construction
Elevated
Part of the Purbachal route
Rajarbagh
রাজারবাগ
Under construction
Underground
Part of the Airport route
Rampura
রামপুরা
Under construction
Underground
Part of the Airport route
MRT Line 2
Station Name
Status
Layout
Notes
Refs
English
Bengali
Azimpur
আজিমপুর
Planned
–
Part of the main line
Bhuighar
ভুইঘর
Planned
–
Part of the main line
Dakshingaon
দক্ষিণগাঁও
Planned
–
Part of the main line
Dhaka Medical College
ঢাকা মেডিকেল কলেজ
Planned
–
Part of the main line
Dhaka Uddyan
ঢাকা উদ্যান
Planned
–
Part of the main line
Dhamripara
ধামড়িপাড়া
Planned
–
Part of the main line
Gabtoli *
গাবতলী
Planned
–
Part of the main line
Golap Shah Mazar
গোলাপ শাহ মাজার
Planned
–
Part of the branch line
Gulistan
গুলিস্তান
Planned
–
Part of the main and branch lines
Jalkury
জালকুড়ি
Planned
–
Part of the main line
Jhigatola
ঝিগাতলা
Planned
–
Part of the main line
Kamalapur *
কমলাপুর
Planned
–
Part of the main line
Manda
মান্ডা
Planned
–
Part of the main line
Mohammadpur
মোহাম্মদপুর
Planned
–
Part of the main line
Motijheel *
মতিঝিল
Planned
–
Part of the main line
Narayanganj
নারায়ণগঞ্জ
Planned
–
Part of the main line
Nayabazar
নয়াবাজার
Planned
–
Part of the branch line
New Market
নিউ মার্কেট
Planned
–
Part of the main line
Palashi
পলাশী
Planned
–
Part of the main line
Sadarghat
সদরঘাট
Planned
–
Part of the branch line
Science Lab
সায়েন্স ল্যাব
Planned
–
Part of the main line
Signboard *
সাইনবোর্ড
Planned
–
Part of the main line
MRT Line 4
MRT Line 5
MRT Line 6
References
External links