The Fish and Wildlife Service owns and operates the dam during normal conditions. During flood conditions operational control is turned over to the U.S. Army Corps of Engineers according to a 1989 memorandum of understanding.[4] During the 2011 Souris River flood, the dam's reservoir reached maximum levels and releases of 7,500 cu ft/s (210 m3/s) in early June, contributing to flooding downstream.[5][6] By June 26, releases had reached 24,000 cu ft/s (680 m3/s) and were incrementally reduced thereafter.[7]